Westminster, Colorado - City Development Fees

Westminster | City | Adams County / Jefferson County | Denver-Aurora-Lakewood, CO MSA

Westminster is a home-rule city spanning Adams County and Jefferson County in the northwest Denver metropolitan area. Development charges are administered by the City of Westminster through its Park Development Fee, School Land Dedication and Public Land Dedication requirements (codified at Westminster Municipal Code W.C. 11-6-8), its Planning and Engineering fee schedules for land use applications (codified authority W.C. 11-1-6), and its municipal water and sewer utility for tap fees. Colorado authorizes local development impact fees under C.R.S. Section 29-20-104.5. This page presents the impact, land use application, and utility tap fee families captured from official City of Westminster sources. Verify current amounts with the City of Westminster before relying on them.

On this page
  1. Fee summary
  2. Park, school and public land dedication (impact fees)
  3. Land use and zoning application fees
  4. Water and sewer tap fees
  5. Coverage notes
  6. Fee authorities
  7. Sources

Fee Summary

Fee Type Status Top-Line Figure Effective Date
Impact Fees (Park Development Fee, School Land Dedication, Public Land Dedication - W.C. 11-6-8) Confirmed Park Development Fee $2,668 per single-family detached unit (CPI-adjusted annually); School Land Dedication cash-in-lieu $876 per single-family detached unit; Public Land Dedication 12 acres per 1,000 projected persons or fee-in-lieu at fair market value 2026-04-15
Land Use and Zoning Application Fees (W.C. 11-1-6) Confirmed Zoning or Rezoning $500; Annexation $300; Special or Conditional Use Permit $450; Variance $250; Tier 1 PDP $350 x square root of acres; Construction Drawing Reviews $750 + $75 x square root of acres ($1,125 max) Not printed on schedule
Utility Tap Fees (City of Westminster water and sewer utility) Confirmed Single-family detached with 3 bathrooms or fewer $27,385 total; with 4 or more bathrooms $31,461 total; townhome and multi-family charged per bedroom; fire protection $247 per meter 2026-01-01
Special District Fees (Metro Districts / CRS Title 32) Not administered Colorado metropolitan and special districts are independent CRS Title 32 entities that adopt their own service-plan fees and assessments; the City of Westminster does not levy a special-district application or permit fee -
Proffers Not applicable Colorado jurisdictions do not use Virginia-style cash proffers -

Park, School and Public Land Dedication (Impact Fees)

Source: City of Westminster, "Park Development Fees, School Land Dedication, and Public Land Dedication," effective April 15, 2026, codified at Westminster Municipal Code W.C. 11-6-8. Colorado authorizes local development impact fees under C.R.S. Section 29-20-104.5.

Park Development Fee (W.C. 11-6-8 Section C)

Residential TypeFee
Single-family detached$2,668 per unit
Single-family attached or mobile home$2,169 per unit
Multi-family, congregate care or independent living senior housing$1,776 per unit
Assisted living senior housing$617 per bed

The Park Development Fee is automatically adjusted annually by April 15 per the Denver-metro Year-End CPI. The 2026 increase was 4.2 percent, and the figures above are the current 2026 schedule.

School Land Dedication - cash-in-lieu (W.C. 11-6-8 Section F)

Residential TypeCash-in-Lieu
Single-family detached$876 per unit
Single-family attached$468 per unit
Multi-family$112 per unit

The School Land Dedication cash-in-lieu amounts may be adjusted annually by April 15 at City discretion.

Public Land Dedication (W.C. 11-6-8 Section B)

  • Dedicate developable land at 12 acres per 1,000 projected persons, or pay a fee-in-lieu at fair market value. Fair market value is determined by the City using a licensed Colorado appraiser, and the developer pays the appraisal cost.
  • Projected population factors: single-family detached 3.0 persons per unit; single-family attached 2.5; multi-family 2.0; independent living senior 1.5.

Authority: City of Westminster, Westminster Municipal Code W.C. 11-6-8.

Land Use and Zoning Application Fees

Source: City of Westminster Planning and Engineering Fee Schedule and Engineering Fee Schedule, both linked as current on the live Develop in Westminster page. Codified authority: Westminster Municipal Code Section 11-1-6 (Land Use and Development Review Fee Schedule). Building permit fees are a separate schedule and are outside the scope of this page.

Application TypeFee
Tier 1 PDP or PDP Amendment$350 x square root of acres ($350 minimum)
Tier 2 PDP Amendment$250
Tier 1 ODP or ODP Amendment$400 x square root of acres ($400 minimum)
Tier 2 ODP Amendment$250
Tier 3 ODP Amendment$75
Zoning or Rezoning$500
Annexation$300
Comprehensive Land Use Plan Amendments$500
ODP Waiver$250
Special or Conditional Use Permit$450
Temporary Use / Special Event Permit$100
Minor Replat (Lot Line Adjustment)$300
Vacations (R.O.W. and Easements)$300
Variance$250
Development Sign Posting Fee$50
Zoning Verification Letter$50
Affidavit of Correction$100
Scheduling and Conducting Public Hearing$350 per hearing
Construction Drawing Reviews (Engineering)$750 + $75 x square root of acres ($1,125 maximum)
Land Disturbance Permits (Engineering)$250
Final Plat (Engineering)$300 (applies only if not accompanying construction drawings)
Encroachment Fee (Engineering)$50
Recording Fees for final plats$50 + $20 per page

Authority: City of Westminster - Planning Division and Engineering Division.

Water and Sewer Tap Fees

Source: City of Westminster Water Tap and Sewer Fees, effective January 1, 2026. The City operates its own municipal water and sewer utility and charges tap fees (also called impact, system-development or plant-investment fees) for all new connections. Tap fees are due at building permit issuance and are scalable by residence size - single-family detached by bathroom count, single-family attached and multi-family by bedroom count - and by irrigable lot area.

Connection TypeComponents and Total
Single-family detached (3 bathrooms or less)Water Resources $6,824 + Treated Water Infrastructure $12,058 + Sewer Transport $1,836 + Sewer Treatment $6,070 + Meter Connection Charge $597 = $27,385 (plus a separate outdoor water-use charge based on irrigable lot area)
Single-family detached (4 bathrooms or more)Water Resources $8,118 + Treated Water Infrastructure $14,470 + Sewer Transport $2,206 + Sewer Treatment $6,070 + Meter Connection Charge $597 = $31,461 (plus outdoor water-use charge)
Single-family attached (townhome), per bedroomWater Resources $2,729/bedroom + Treated Water Infrastructure $4,823/bedroom + Sewer Transport $735/bedroom + Sewer Treatment $6,070/unit + Meter Connection Charge $597/unit
Multi-family, per bedroomWater Resources $2,729/bedroom + Treated Water Infrastructure $3,618/bedroom + Sewer Transport $735/bedroom + Sewer Treatment (per meter size) + Meter Connection Charge (per meter size)
Fire Protection Charge$247 per meter
Irrigation / common-area landscapingSeparate irrigation tap required (unless total water use is under 35,000 gallons per year); charged by irrigated area and hydrozone

Authority: City of Westminster (municipal water and sewer utility).

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were not closed on this page with a fixed fee amount traceable to a dated or byte-stable official source document. They are disclosed here rather than estimated, paraphrased from a non-official source, or omitted silently. These items remain under limited-coverage review until these gaps are closed.

Park Development Fee annual CPI adjustment

The Park Development Fee is automatically adjusted every year by April 15 using the Denver-metro Year-End CPI. The amounts on this page are the schedule effective April 15, 2026. A subsequent annual adjustment will supersede them; confirm the current-year schedule with the City of Westminster before relying on a dollar figure.

Land dedication fee-in-lieu dollar amounts

The Public Land Dedication fee-in-lieu is computed at fair market value determined by the City through a licensed Colorado appraiser, with the developer paying the appraisal cost. It is project-specific and is presented here as a dedication standard and valuation mechanism rather than a fixed dollar-per-acre figure.

Land use application fee schedule date

The Planning and Engineering Fee Schedule carries a revision stamp of April 2019 and is presented as the current Planning Fees document on the live Develop in Westminster page. The effective date is left unstated on this page rather than inferred from the revision stamp.

Tap fee source form

The water and sewer tap fee component rates are published as rendered HTML rate tables on the official Water Tap and Sewer Fees page and are corroborated by the dated 2026 Water and Sewer Tap Fees Handout. No single byte-stable hash was captured for the components table. Because residential tap fees scale by bathroom count, bedroom count, meter size and irrigable lot area, the totals shown are illustrative of the stated configurations rather than a universal per-unit charge.

Special District Fees (Metro Districts / CRS Title 32)

The City of Westminster does not levy a development-side special-district application or permit fee. Neither the Planning and Engineering Fee Schedule nor the Engineering Fee Schedule contains a special-district fee line, unlike neighboring Arvada. Colorado Title 32 metropolitan and special districts within Westminster are separate governmental entities that adopt their own service-plan fees and assessments independently of the City. Closed-search outcome: this fee family is not administered by this jurisdiction.

Proffers

Colorado jurisdictions do not use cash proffers (a Virginia conditional-zoning mechanism under Virginia Code Section 15.2-2303 with no Colorado counterpart). Westminster recovers growth-related capital needs through the park development fee, school land dedication and public land dedication described above, together with development agreements. Closed-search outcome: this fee family does not apply to this jurisdiction.

Building permit fees

Building permit fees are administered on a separate City of Westminster schedule and are outside the scope of the fee families captured on this page.

Fee Authorities

Authority Fee Types Official Website
City of Westminster - Planning Division Land use and zoning application fees; park, school and public land dedication administration (W.C. 11-6-8, W.C. 11-1-6) westminsterco.gov
City of Westminster - Engineering Division Construction drawing review, land disturbance, final plat, encroachment and recording fees westminsterco.gov
City of Westminster - Water and Sewer Utility Water and sewer tap fees, meter connection charges, fire protection charge, irrigation taps westminsterco.gov

Sources

Document Agency Accessed
Park Development Fees, School Land Dedication, and Public Land Dedication (effective April 15, 2026) City of Westminster 2026-07-16
Planning & Engineering Fee Schedule City of Westminster 2026-07-16
Engineering Fee Schedule City of Westminster 2026-07-16
Water Tap and Sewer Fees City of Westminster (water and sewer utility) 2026-07-22
Develop in Westminster (current fee schedule index) City of Westminster 2026-07-16

Last verified by ZoneFee: 2026-07-22. Fee schedules are subject to change. Verify current rates directly with the City of Westminster (Planning Division, Engineering Division, and Water and Sewer Utility) before relying on this data for any financial decision.

This page reflects fee data sourced from the City of Westminster Park Development Fees, School Land Dedication and Public Land Dedication schedule effective April 15, 2026 (codified W.C. 11-6-8), the Planning and Engineering Fee Schedule and Engineering Fee Schedule (codified authority W.C. 11-1-6), and the City of Westminster Water Tap and Sewer Fees page with its 2026 handout. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. The Park Development Fee is automatically adjusted each year by April 15 per the Denver-metro Year-End CPI. The Public Land Dedication fee-in-lieu is a project-specific fair market value determination and is disclosed as a mechanism rather than a fixed dollar figure. Residential water and sewer tap fees scale by bathroom count, bedroom count, meter size and irrigable lot area, so the totals shown apply only to the stated configurations. Colorado jurisdictions do not use Virginia-style cash proffers, and Colorado Title 32 metropolitan and special districts are independent entities whose fees and assessments are not city-administered development fees. Building permit fees are a separate schedule outside the scope of this page. Verify all current rates directly with the City of Westminster before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.