Texas Development Fees
Texas operates under one of the most structured development-fee regimes in the United States. Impact fees are governed statewide by Texas Local Government Code Chapter 395; cities collect roadway, water, and wastewater impact fees on a per-service-unit basis using formulas from city-adopted studies. Application, platting, site plan, and utility tap fees are layered on top from each city's adopted fee schedule.
Coverage last updated: 2026-06-28. 69 Texas jurisdictions live on ZoneFee.
Live Texas Jurisdictions
How Development Fees Work in Texas
Texas is a Dillon Rule state, but the legislature has granted broad fee authority to municipalities and certain counties through specific enabling statutes. The most important is Texas Local Government Code Chapter 395 (Impact Fees), which authorizes municipalities and certain counties to charge impact fees on new development to fund roadway, water, and wastewater capital improvements. Chapter 395 establishes a uniform procedural framework: cities must adopt land use assumptions, a capital improvements plan, and a maximum fee per service unit (LUE - Land Use Equivalent) by ordinance after public hearings, with an Impact Fee Advisory Committee reviewing the program semi-annually.
A Texas impact fee is calculated by multiplying the city-adopted maximum fee per service unit by the project's service unit count, then by the city's adopted collection rate (which may be at or below the maximum). The fee is charged at plat approval or building permit issuance, depending on the city's ordinance. Service areas are geographically defined; the same project may face different per-LUE amounts depending on which roadway service area or utility service area it sits in. Cities are required to update their Roadway Impact Fee Study and Water/Wastewater Impact Fee Study at least every five years.
Beyond impact fees, Texas cities charge zoning and development application fees from a city-adopted fee schedule: rezoning, special use permits, variances, planned unit development amendments, platting (preliminary, final, replat), site plan review, civil engineering review, traffic impact analysis review, and zoning verification fees. These are set by each city's adopted Master Fee Schedule or Development Services Fee Schedule and are subject to periodic council update. They cover the cost of staff review rather than infrastructure capacity.
Cities also charge utility tap fees and meter fees for new water and wastewater connections. These differ from impact fees: tap fees recover the cost of physically connecting a service line and installing a meter, while impact fees recover the cost of off-site capacity. Some Texas cities additionally charge a capital recovery fee or buy-in fee, especially in fast-growth suburbs where existing infrastructure has been expanded primarily for new growth. Special-purpose districts (Municipal Utility Districts, Water Control and Improvement Districts) may layer additional fees on top of city fees within their boundaries.
Texas Statutory Anchors
- TLGC Chapter 395 - Impact Fees. Authorizes municipal and county impact fees for roadway, water, and wastewater. Establishes procedural requirements (public hearings, advisory committee, semi-annual reports, five-year study refresh). (statutes.capitol.texas.gov/Docs/LG/htm/LG.395.htm)
- TLGC Chapter 211 - Municipal Zoning Authority. Authorizes municipal zoning ordinances and the application/permit fees adopted under them. (statutes.capitol.texas.gov/Docs/LG/htm/LG.211.htm)
- TLGC Chapter 212 - Municipal Subdivision Regulation. Authorizes platting, subdivision review, and associated fees. (statutes.capitol.texas.gov/Docs/LG/htm/LG.212.htm)
- TLGC Chapter 214 - Municipal Regulation of Housing and Other Structures. Authorizes building permit, inspection, and related fees. (statutes.capitol.texas.gov/Docs/LG/htm/LG.214.htm)
- Texas Water Code Chapter 49 - Provisions Applicable to Districts. Authorizes Municipal Utility Districts and Water Control and Improvement Districts to levy fees within their boundaries. (statutes.capitol.texas.gov/Docs/WA/htm/WA.49.htm)
Coverage Detail by Jurisdiction
| Jurisdiction | Type | County / Region | Fee Types Covered | Last Verified |
|---|---|---|---|---|
| Georgetown | City | Williamson County (Central Texas, I-35 corridor) | UDC zoning application fees, water tap fees, wastewater tap fees, electric tap fees, water impact fees, wastewater impact fees | 2026-03-27 |
| Round Rock | City | Williamson County (Central Texas, I-35 corridor) | Roadway impact fees, zoning application fees | 2026-04-16 |
| Leander | City | Williamson County (Central Texas, Austin-Round Rock-Georgetown MSA) | Roadway impact fees, water/wastewater impact fees, zoning application fees | 2026-04-28 |
| Frisco | City | Collin County (DFW Metroplex, Dallas-Fort Worth-Arlington MSA) | Roadway impact fees, water/wastewater impact fees, zoning application fees | 2026-05-01 |
| Denton | City | Denton County (DFW Metroplex, Dallas-Fort Worth-Arlington MSA) | Roadway impact fees (Ord. 2024-1125), water/wastewater impact fees (2025 study), zoning application fees (Ord. 25-708) | 2026-05-02 |
| Pflugerville | City | Travis & Williamson counties (Central Texas, Austin-Round Rock-Georgetown MSA) | Roadway impact fees (Ord. 1470-20-11-24), water/wastewater impact fees (Ord. 1577-23-01-10), zoning application fees (FY26 Master Fee Schedule) | 2026-05-03 |
| McKinney | City | Collin County (DFW Metroplex, Dallas-Fort Worth-Arlington MSA) | Roadway impact fees (Chapter 130 Art. III; 13 service areas), water/wastewater impact fees, zoning/plat/SUP fees (2026 Dev Guide), water and sewer tap fees (eff. Oct. 1, 2025) | 2026-05-04 |
| Hutto | City | Williamson County (Central Texas, Austin-Round Rock-Georgetown MSA) | Water, wastewater, and roadway/transportation impact fees (Section A5.004; Ords. O-18-07-19-9A through O-2024-068), zoning/plat/site plan fees (Sections A1.001-A1.005), utility connection fees (Section A5.002) | 2026-05-05 |
| Buda | City | Hays County (Central Texas, I-35 corridor, Austin-Round Rock-Georgetown MSA) | Water and wastewater impact fees (Article A4(aaa); Ord. 2017-12), zoning/plat/site plan fees (Article A4), utility connection fees (Article A11; Ord. 2017-10), TIA review fees | 2026-05-05 |
| San Marcos | City (Hays County seat) | Hays County (Central Texas, I-35 corridor, Austin-Round Rock-Georgetown MSA) | Water and wastewater impact fees (Ord. 2018-09; codified Chapter 86 Art. 5 Div. 4), zoning/plat/site/watershed fees (Resolution 2025-185R, eff. Oct. 1, 2025), fees-in-lieu (sidewalk, trees, water quality, parking, parkland) | 2026-05-05 |
| Kyle | City | Hays County (Central Texas, I-35 corridor, Austin-Round Rock-Georgetown MSA) | Water and wastewater impact fees per LUE (Code Sec. 50-259; new tier eff. Aug. 27, 2025), zoning/plat/site development/TIA/tree fees (FY 2025-26 Council Approved Fee Schedule, Sep. 17, 2025), water and sewer tap fees (Code Sec. 50-20(a)) | 2026-05-05 |
| New Braunfels | City | Comal & Guadalupe counties (Central Texas, I-35 corridor, San Antonio-New Braunfels MSA) | Roadway impact fees by 6 service areas and 4 plat-tier date thresholds (Chapter 100; Ord. 2022-87, eff. March 1, 2023). Zoning/plat/site plan fees codified in Code of Ordinances Appendix D (Municode); not yet verified verbatim. NBU water/wastewater connections administered separately | 2026-05-06 |
| Cedar Park | City | Williamson County (Central Texas, Austin-Round Rock-Georgetown MSA) | Building permit fees (Code Article 2.000 Sec. 2.200; observed amend. ordinances CO08-03-03-27-13A through CO15-13-01-10-C5). Roadway impact (Ch. 11 Art. 11.04), water/wastewater impact (Article 8.000), utility tap (Article 8.000), and zoning/subdivision/site plan fees codified inside eCode360 collection CE6271 (anti-bot blocked); 4 substitute paths probed and failed under Substitute Official Source Policy | 2026-05-06 |
| Austin | City (Travis County seat) | Travis, Williamson, and Hays counties (Central Texas, Austin-Round Rock-Georgetown MSA) | Austin Water Capital Recovery Fees (impact fees) by 5 plat-date tiers and zone-variant rates (City Code Ch. 25-9; TLGC Ch. 395; current top tier eff. Oct. 1, 2023). DSD zoning, subdivision, and site plan application fees disclosed unavailable via official sources after 2026 site IA reorganization (6 substitute paths probed). Austin Water tap fees administered separately | 2026-05-06 |
| Fort Worth | City (Tarrant County seat) | Tarrant County (DFW Metroplex, Dallas-Fort Worth-Arlington MSA) | Plat, annexation, appeals, and agreement application fees per Ord. 27191-09-2024 EXHIBIT A (eff. Oct. 1, 2024). Roadway and Water/Wastewater Impact Fee landing URLs captured; per-service-area rates pending future source review. Water Department tap fees set by separate Council action per Ord. 27191-09-2024 Section 2 | 2026-05-06 |
| San Antonio | City (Bexar County seat) | Bexar County (South Central Texas, San Antonio-New Braunfels MSA) | FY2026 Development Fee Schedule (Rev. October 2025) effective Oct. 1, 2025: zoning case fees by acreage tier ($795-$11,500 max), expedited zoning ($1,560-$23,000), Specific Use Authorization $500, Conditional Use $300, Subdivision Plat (Major SF Base $625+$80/lot, Major Non-SF Base $625+$550/acre), BoA Non-Homestead $600 / Homestead $400, TIA Levels 1-3 ($400-$1,800), MDP $700, verification letters. All Land Development fees subject to additional 3% Tech + 3% Dev Services. Water/wastewater impact and tap fees administered by SAWS (separate utility); no City roadway impact fee adopted | 2026-05-09 |
| Hays County | County | Hays County (Central Texas, I-35 corridor, Austin-Round Rock-Georgetown MSA) | 2026 Development Services Fee Schedule effective Jan. 1, 2026: Floodplain $100-$600, OSSF (septic) permits $610 SFR / $910 Non-SFR + alterations + reinspections, Subdivision Administrative $500 + per-lot $50-$500, Construction Plan $500 admin + $2/linear-ft Transportation Department, Variance Type I $100 / Type II $500, Development Agreement $2,000. TX counties generally lack impact-fee authority under TLGC Ch. 395; in-county utility tap fees administered by WCIDs / MUDs / PIDs separately | 2026-05-14 |
| League City | City (Galveston County, Harris overlap) | Galveston County / Houston Metro Southeast Bay Area, I-45 South corridor (Houston-The Woodlands-Sugar Land MSA) | Water/Wastewater Capital Recovery Fee eff. Dec. 1, 2023: residential SF/MH combined $14,825 ($9,074 water + $5,751 wastewater); townhome/condo/apt $11,860; commercial by meter size to $1,136,587 (10"). 2024 Roadway CRF (Ord 2024-49, eff. plats on/after Apr. 1, 2025) cost per service unit (vehicle-mile) by service area: SA1 $1,172 / SA2 $2,056 / SA3 $1,671 / SA4 $1,842 (citywide avg $1,774); worked single-family SA3 example $6,366.51. Engineering Plan Review $9,350/review (initial = $18,700 for two reviews); Construction Inspection $5,500/month; TIA $300/$800/$1,000. Permit Fee Schedule eff. Mar. 1, 2024. Tap/meter fees Jan. 2024. Proffers N/A (TX); special district fees not city-administered | 2026-05-30 |
| Pearland | City (Brazoria/Fort Bend/Harris counties) | Brazoria / Fort Bend / Harris counties (Houston-The Woodlands-Sugar Land MSA) | Permits & Development Fees current operative schedule (CMS last-published Jan. 21, 2026): Exhibit A Planning (zoning/CUP application by 6 acreage brackets $1,000-$4,600; PUD $1,800-$4,600), Exhibit B Public Works (W&S Impact Fee per adopted study, Pro-Rata service areas, Parkland $1,517 SF DU / $1,114 MF DU, TIA $750), Exhibit C Construction Permit (commercial $5.50/$1,000 valuation + sf minima; residential $0.41/sf), Exhibit D Fire Department. Water/Sewer Tap Fee actual cost not less than $250. TIRZ/MUD/PID overlays administered separately | 2026-05-14 |
| Tyler | City (Smith County seat) | Smith County (East Texas, Tyler MSA) | Schedule of Fees + UDC Sec. 10-776 Planning Application Fees: commercial nonresidential building $5.00 per $1,000 valuation effective Oct. 1, 2024 (Minimum $50; Plan Check 25%); residential construction $0.35/sf; mechanical/plumbing/electrical/sign/demolition/house-moving per-fixture and per-circuit schedule; planning applications include Annexation $420, Variance $386, Zoning Change/SUP $550, Planned Development $1,050, Subdivision Infrastructure Review $1,000. Tyler has not posted Chapter 395 impact fee schedule; W/S tap fees administered separately by Water Business Office | 2026-05-14 |
| Carrollton | City (Dallas/Denton/Collin counties) | DFW North / I-35E Corridor (Dallas-Fort Worth-Arlington MSA) | Building Inspection Fees current operative schedule (CMS last-published Mar. 24, 2026): multi-year tiered impact fee schedule by meter size (current 2026 effective Jan. 1, 2026: $2,936.25 for 3/4 inch through $518,211.63 for 12 inch; Water + Wastewater per service meter); residential $1,100 per unit + sewer/water tap + impact fee; commercial $6 per $1,000 value; sewer tap $65/$125 fixed (4 inch/6 inch); water connection tap $65/$125 fixed (3/4 inch/1 inch) plus upgrade $860; zoning change PD $1,000 / other $500; engineering inspection per SF/LF; NEZ waiver program reduces fees | 2026-05-14 |
| Midland | City (Midland County seat) | Midland County (West Texas / Permian Basin, Midland TX MSA) | Ord. 9960 Water/Wastewater/Roadway Impact Fees (eff. Oct. 1, 2019; TLGC Ch. 395; 5 Roadway Service Areas A-E with Area E outside 6-mile band at $0/SU; water meter-size schedule $1,656.12 for 1" through $66,244.85 for 6" after 50% credit) + Ord. 10669 City Council Approved Fee Schedule (eff. Oct. 1, 2025): Exhibit G Planning (Zone Change $500-$650, SUP/SUD $300-$400, BZA $600, Plat $250-$505, Traffic Impact $350-$600), Exhibit H Code Enforcement (residential building $0.315/sf; commercial $100+$3.50 per add'l $1k over $20k; demolition $50-$500; electrical/mechanical/gas/plumbing trade permits $50+ each), Exhibit I Engineering, Exhibit P ROW License $1,500 + 200% of University Lands Rate. Tap fees not enumerated in canonical city schedule; special-district fees not administered by this jurisdiction | 2026-05-16 |
| Dallas | City (Dallas County seat) | Dallas County (DFW Metroplex, Dallas-Fort Worth-Arlington TX MSA) | Planning & Development Permit Fee Schedule (eff. Jul. 1, 2025; Dallas City Code Ch. 52 + Ord. 33080): Zoning Verification Letter $302, Board of Adjustment $600-$1,200, Major Plat $2,871-$6,238, Minor Plat $840-$3,364, PD/SUP surcharge 10% of permit fee, Certificate of Occupancy $104-$500. DWU Water & Wastewater tap fees (eff. Oct. 1, 2020; Ch. 49 service connection charges): water tap $3,790-$6,270, $275/tap inspection, wastewater lateral $475-$4,060. PID application fee $15,000 + $0.15/$100 max assessment (Ch. 372 TLGC). Impact fees not administered (no TLGC Ch. 395 program); proffers not applicable | 2026-05-27 |
| College Station | City | Brazos County (Brazos Valley, College Station-Bryan TX MSA; Texas A&M University) | PDS Fee Schedule FY2026 (consolidated): Residential Water/WW Impact Fees (eff. Jan. 1, 2026) $2,325+$3,300 (5/8") to $620,078+$440,055 (10"); Roadway Impact Fees (eff. Mar. 1, 2022) by ITE category x Service Area A-D; Parkland Dedication (eff. Oct. 1, 2024) $5,256/DU SF; Planning application fees ($1,670 rezoning/CUP), Building Permits ($0.74/sf SF), Water/Sewer Service Connection Fees ($643.42-$3,138.66), MUD petition fee $40,745. Proffers not applicable | 2026-05-28 |
| Odessa | City (Ector County seat) | Ector County (West Texas / Permian Basin, Odessa TX MSA; paired with Midland) | Master Permit Fee Schedule (Inspection Division; current schedule effective Jan. 16, 2018): residential building $50 + $0.12/sf; commercial building $1,000 + $0.12/sf; additions/remodels $50 + $0.10/sf; plan review 25% of permit fee; full plumbing/electrical/mechanical/fire trade schedule; reinspection $50/$75/$100 tiered. Impact fees not administered (no TLGC Ch. 395 program); utility tap fees unavailable via published sources; special-district fees not administered; proffers not applicable. Currency caveat: 2018 effective date | 2026-05-30 |
| Conroe | City (Montgomery County seat) | Montgomery County (Southeast Texas / Greater Houston, Houston-The Woodlands-Sugar Land TX MSA; I-45 / Lake Conroe) | Code of Ordinances Appendix A Fee Schedule (current through Nov. 13, 2025 amendment set Ord. 2760-25 through 2764-25): commercial building permit valuation tiers ($67.50 first $1,000 to $5,381 + $3.15/$1,000 over $1M); plan review 50% of permit fee; reinspection $75-$300; TIA $300; subdivision/plat $200-$1,500 + $20/lot + $100/acre; sign, tree/vegetation, telecom tower permits; water tap $1,875-$5,750 and sewer tap $1,875/$2,750 (Sec. 70-74). Impact fees + special-district fees not administered (zero entries in consolidated schedule); proffers not applicable | 2026-06-01 |
| Lewisville | City | Denton County (DFW Metroplex north, Dallas-Fort Worth-Arlington TX MSA; I-35E / Lake Lewisville) | Consolidated City Fee Schedule (eff. Apr. 1, 2026): engineering site plans $500-$1,000 + $30/acre; plats $500 + $5/lot or $30/acre; zoning change $500 + $10/acre; PD zone change $1,000 + $10/acre; SUP $750 + $5/acre; MSD $1,500; ZBA $200. Water/wastewater capital recovery (impact) fees by LUE - water $2,614.89/LUE max, wastewater $3,949.72/LUE max (Jul. 2018 Five-Year Review); park development $1,682/dwelling unit; tree mitigation $200-$300/caliper inch. Water/sewer connection: meter cost + 25% admin, install $37.50-$75, $25 water + $15 sewer admin. Proffers not applicable (TX framework); special-district fees not administered (zero PID/TIRZ/MUD entries in the consolidated schedule) | 2026-06-02 |
| Flower Mound | Town | Denton County (DFW Metroplex north; SH 121 / FM 2499 corridor; Lake Grapevine / Lewisville Lake) | Impact fees (TLGC Ch. 395, plats filed on/after Apr. 20, 2026): roadway per vehicle-mile $682 (A) / $2,697 (B) / $2,949 (C), single-family detached $3,103.10-$13,417.95/dwelling unit; water by meter size $10,317 (5/8"x3/4") to $3,610,950 (10" turbine); wastewater by service-area district (Long Prairie Conservation District $0). Planning Services Fee Schedule (eff. Apr. 1, 2024, Ord. 13-24): zoning change $500 + $25/acre, PD single-family $2,935 + $25/acre, SUP $625/$2,635, site plan $2,115 + $210/building, plats $300-$1,960. Utility tap administered as the impact fee (no separate schedule); proffers not applicable (TX framework); special-district fees not administered (TIRZ = TIF on tax roll) | 2026-06-02 |
| Mansfield | City | Tarrant County, with portions in Johnson and Ellis Counties (DFW Metroplex southeast; US-287 / SH 360 corridor) | Impact fees (TLGC Ch. 395): water + sewer by meter size 3/4" $6,500 total to 8" $416,000 (Ord. OR-2385-24); roadway FY2026 (eff. Oct. 1, 2025) $1,303.19 per vehicle-mile, single-family detached $4,900/dwelling unit. Master Fee Schedule (Ord. OR-2379-24, eff. Oct. 1, 2024): zoning change $1,000 + $100/acre ($7,500 max), SUP $2,500 + $100/acre, PD $2,500 + $100/acre ($10,000 max), plats $300-$500 + $35/acre; water tap $1,530-$2,230, sewer tap $1,270, meter set $320-$700. Proffers not applicable (TX framework); special-district fees not administered (TIRZ = TIF on tax roll) | 2026-06-07 |
| Williamson County | County | Williamson County (Central Texas, I-35 corridor, north Austin metro; Austin-Round Rock-Georgetown MSA; county seat Georgetown) | Subdivision Regulations adopted and effective Mar. 4, 2025 (Appendix N Fee Summary): Preliminary Plat $550 + $40/lot; Final Plat $550 + $1/ft of road + $25/lot; Construction Plan Review $35/lot + $1.25/ft of road; Construction Inspection $50/lot + $1.85/ft of road; Minor Plat $550; Replat/Amendment $550; Variances $250/type; Vacation of R.O.W./Easement $100; Public Notice $100 + actual cost. Mar. 2025 supersedes 2021A (changed construction review/inspection fees). TX counties generally lack impact-fee authority under TLGC Ch. 395; water/sewer service and tap fees via in-county cities, MUDs, WCIDs, and LCRA separately. Plat-review authority varies by ETJ (Appendix E) | 2026-06-08 |
| Travis County | County | Travis County (Central Texas, I-35 corridor, Austin metro core county; Austin-Round Rock-Georgetown MSA; county seat Austin) | TNR FY2026 Development Related Fees Schedule effective Jan. 1, 2026: Preliminary Plan Review $102/acre ($815 min); Final Plat (Long Form) $107/acre ($815 min); Residential Lot Review $147/lot; Construction Inspection $3.09/linear ft; Basic Plat (Short Form) $7,655/plat; Floodplain $149-$287 residential / $137 + $1.99 per $1,000 non-residential; Driveway $165; Road/ROW Cut $340/$407; OSSF (septic) $712-$1,262; Transportation Assessment $6,895-$13,262; Variances $478-$1,301. Fees vary by ETJ column (Outside vs In Austin ETJ) and environmental zone (DDZ/DWPZ, RSMP). TX counties generally lack impact-fee authority under TLGC Ch. 395; water/sewer service via Austin Water, MUDs, WCIDs, and LCRA separately | 2026-06-08 |
| Denton County | County | Dallas-Fort Worth Metroplex (north); DFW north growth county; county seat Denton; I-35 / I-35E / I-35W split corridor; covers UNINCORPORATED Denton County only | Denton County Permit Fee Schedule (View/391) + adopted Subdivision Rules and Regulations (View/1567): Commercial/Mixed Use building permit $250 per 1,000 sq ft; Single Use $150-$200 per 1,000 sq ft; Tenant Finish-Out $200 per 1,000 sq ft (min $100); Site Plans 20% of building plan fees (min $150); Platting $100 + $20/lot ($10 electronic); Replat $200 + $20/lot; Plat Review $100 (4th+); Plat Variance $200; Engineering Plan Review 2% of street/drainage cost; Road and Bridge Inspection 3%. TX counties lack TLGC Ch. 395 impact-fee authority; water/sewer via cities, MUDs, and Upper Trinity Regional Water District separately. Proposed plat-fee increase (View/1484) excluded as not-yet-adopted. | 2026-06-10 |
| Lubbock | City | South Plains / Llano Estacado; West Texas regional center; Lubbock County seat; Texas Tech University; US-84 / I-27 / Loop 289 | 2026 Planning Department Fee Schedule + Building Safety Fee Schedule (FY eff Oct. 1, 2025 - Sep. 30, 2026, Ord. 2024-O0111): Zone Change $500 + $5/acre; Preliminary Plat $150 + $35/acre (max $7,000); Final Plat $350 + $55/acre (max $5,000); Variance $200 residential / $500 commercial; Annexation Petition $1,500; building permit $0.15/sq ft single-family-duplex, $0.20/sq ft commercial, $0.10/sq ft shell, min $75. Impact fees: TLGC Ch. 395 roadway + water + wastewater program with a current collection rate of $0.00 for all areas (developers currently pay $0); the 2025 roadway study max-assessable basis (A $1,714 to C $1,745 per vehicle-mile) is not a collected fee. Taps installed by city-registered contractors; PIDs levy tax-roll assessments. | 2026-06-10 |
| Richardson | City | Dallas-Fort Worth Metroplex inner-ring; spans Collin and Dallas counties; US-75 (Central Expressway) / President George Bush Turnpike corridor; Telecom Corridor / CityLine | Zoning and Development Fee Schedule (Rev. 2024-09-17 / 2024-08-23): Zoning $1,500 (Planned Development $2,500); Special Permit $1,500; Preliminary Plat $400 + $25/lot; Final/Replat $500 + $25/lot residential or $500 + $35/acre non-residential; Site Plan $600; Civil Engineering Plans $800 + $50/acre; Development Inspection 4.0% of public improvements; variances $250-$325; building permits per the Building Permit Fee Schedule and codified Appendix B. Utility: water and sanitary sewer pro rata $7.00 per front foot (Code Sec. 23-29(a)); Richardson runs its own water/sewer utility with no separate flat tap or impact fee. No TLGC Ch. 395 impact fee; no PID/TIRZ developer fee. | 2026-06-10 |
| Sugar Land | City | Fort Bend County (small portion Harris); Greater Houston, Houston-The Woodlands-Sugar Land TX MSA; US-59/I-69 / Grand Parkway SH 99; master-planned MUD-developed city | 2026 Development Application Handbook (Sections 2/4/5): Rezoning $1,443; Planned Development $2,303.25 + $25.75/acre (max $3,364.50); PD Administrative Amendment $259.75; Special Permit $2,148.75; Preliminary/Final Plat $1,392.25 + $3.50/lot + $19.25/acre (Replat $1,294.00); Amending/Minor Plat $615.25; Site Plan $792.25 (resubmittal $233.25); DRC review $223.25. Utility (Code Sec. 5-250/5-310, Ord. No. 2382, eff. Jan. 1, 2026): water connection meter set $915 (3/4") to $1,670 (2"), meter downsizing $125, sewer tap $200 (4" res) / $300 (6") / $400 (8"). Impact fees + special-district fees not administered (no TLGC Ch. 395 impact fee in the consolidated code; developer offset via individual MUD development agreements); proffers not applicable (TX framework). | 2026-06-10 |
| Galveston | City | Galveston County (county seat); Texas Gulf Coast / Galveston Island barrier-island city; Houston-The Woodlands-Sugar Land TX MSA; I-45 | Code of Ordinances Sec. 10-46 building/construction permits: new residential $0.15/sq ft; new commercial $0.20/sq ft first 20,000 sq ft + $0.05/sq ft; additions permit $0.40/sq ft + plan review $0.20/sq ft; demolition $50; re-inspection $50/$200. Water/Sewer Tap Application Basic Fee Schedule: water complete tap set $3,427 (5/8") / $3,550 (1") / $4,435 (2"), meter only $2,150 (3") / $6,900 (4") / $9,600 (6"), sewer 6" service $3,495. Impact fees: TLGC Ch. 395 program (Ord. No. 16-087, codified Ch. 17 Sec. 17-6) with an adopted collection rate of $0.00 for water/sewer/roadway A-D; the 2016 study is max-assessable basis only. Special-district fees not administered (tax-roll instruments); proffers not applicable (TX framework). | 2026-06-10 |
| El Paso | City | El Paso County (county seat); Far West Texas / US-Mexico border on the Rio Grande; El Paso TX MSA | Zoning Application Fees (eff. 9/1/2024): Rezoning $1,430; Special Permit $1,530; Comprehensive Plan Amendment $1,015; DSDP CPC $765 / City Council $1,380; ZBA Variance/Special Exception $915; Zoning Verification $194. Subdivision Application Fees (eff. 9/1/2025): Major Preliminary $2,290 / Final $2,260; Minor Subdivision $1,040; Amending Plat $865; Development Plat $1,886; Dedication of ROW $1,790. Building permit / plan review per FY 2026 Adopted Schedule C. Impact fees not administered (no TLGC Ch. 395 program; zero impact-fee items in Schedule C); water/sewer connection charges administered by El Paso Water (separate Public Service Board); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-13 |
| Brownsville | City | Cameron County (county seat); Rio Grande Valley / US-Mexico border at the mouth of the Rio Grande; Brownsville-Harlingen TX MSA | Roadway Capital Recovery Fee (TLGC Ch. 395; Ord. 2024-1739, eff. 5/7/2024): collection rate per vehicle-mile by service area (Schedule 2, post-50%-credit) $0 (service areas 13/17/19) to $3,274 (service area 6). Zoning and Specific Use Permit application fees: Single Family $500 / $750 / $1,250; Multi-Family / Commercial $750 / $1,000 / $1,250 / $1,750 by acreage; Planned Development fees itemized on the Multi-Process Application. Water/sewer connection administered by Brownsville Public Utilities Board (separate utility); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-13 |
| Corpus Christi | City | Nueces County (county seat); Texas Gulf Coast / Coastal Bend on Corpus Christi Bay; Corpus Christi TX MSA | FY 2026 Development Fee Schedule (eff. 10/1/2025): Zoning by acreage $1,996.50 to $4,991.25 + $25/acre over 25; PUD surcharge $1,300.43; SUP surcharge $621.64; UDC Preliminary Plat $1,863.40 to $2,928.20; Minor Plat $911.74; building permit $0.461/sq ft. Water/wastewater Infrastructure Trust Fund lot and acreage fees (water lot $525.61 / acreage $2,106.84; wastewater lot $575.39 / acreage $2,300.10; PIIC water tap $702.77; Corpus Christi Water, a City department). Impact fees not administered (no TLGC Ch. 395 program); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-13 |
| Waco | City | McLennan County (county seat); Central Texas / I-35 corridor on the Brazos River; Waco TX MSA | Impact fees (TLGC Ch. 395; Ord. 2020-793, eff. 6/1/2021): water by meter size $1,000 (5/8 to 3/4 inch) to $253,330 (10 inch); wastewater $2,000 to $320,000 (8 inch); roadway by service area, single-family detached $0 to $1,500 per dwelling (collected, after general credit). Planning Services Fee Schedule (eff. 10/1/2022): Zone Change $500; Special Permit $500; ZBA $300; Preliminary Plat $300; Final/Replat $500 + $5/lot; Minor Plat $400; PUD Concept $400 / Final $350; building permit commercial $0.28/$0.14 per sq ft, residential $0.35/sq ft. Utility tap fee delegated to budget/resolution (the impact fee is the development capacity charge); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-13 |
| Abilene | City | Taylor County (county seat; also extends into Jones County); West Texas / Big Country / I-20 corridor; Abilene TX MSA | Consolidated city-wide Fee Schedule: Zone change $1,500; Planned Development District $2,000 (amendment $1,000); Site plan $500 / Minor $250; Board of Adjustment $400; annexation $600; plats $350 first 4 lots + $15/lot (maximum review fee $2,500); building permit by valuation $75 min tiered, new single-family $0.50/sq ft ($550 min), plan review 25%. Water Utilities: water taps 3/4 inch $500 / 1 inch $550 / 1.5 inch $775 / 2 inch and larger actual cost; frontage-foot pro rata $3.25 to $5.00 (water) and $2.25 to $4.00 (sewer). Impact fees not administered (no TLGC Ch. 395 program); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-13 |
| Schertz | City | Guadalupe County (extends into Comal and Bexar); Greater San Antonio metro / I-35 / IH-10; Cibolo-Schertz-Universal City cluster; San Antonio-New Braunfels TX MSA | Impact fees (TLGC Ch. 395, Capital Recovery, Ord. 25-F-017, eff. 6/1/2025): Water $8,814 + Wastewater $5,556 per LUE; Roadway Capital Recovery (Ord. 18-M-13); Park Development Fee $650/dwelling. Schedule of Fees - Planning and Zoning 2025-26 (eff. 11/1/2025): zone change / SUP $650 to $6,000 by acreage; Master Development Plan $1,500; Preliminary Plat $2,000 / $3,000; Final Plat $1,500 / $2,000; Site Plan $1,500; annexation $750. Special-district fees (collected by the City): SSLGC water $1,607.24/LUE; CCMA wastewater South $2,300 / North $2,200 per LUE. Utility tap fee unavailable via official sources (the capital recovery impact fee is the development water/sewer charge); proffers not applicable (TX framework). | 2026-06-14 |
| Baytown | City | Harris County (extends into Chambers); Greater Houston metro / Houston Ship Channel / I-10 East / SH-146; Houston-The Woodlands-Sugar Land TX MSA | Impact fees (TLGC Ch. 395, Ord. 9854, eff. 9/5/2004): Water $857 + Wastewater $3,315 = $4,172 per EDU (scales by meter size). Planning Development Fees + Building Permit Fee Schedule: Zoning Map Amendment $500 + $25/acre; SUP $750; residential Final Plat $500 + $10/lot; commercial Final Plat $500 + $20/acre; PUD $1,000 + $40/acre; building permit by improvement value (Permit Processing $35). Utility tap fee unavailable via official sources (the impact fee is the development water/sewer charge); special-district fees not administered (MDD/TIRZ tax-roll); proffers not applicable (TX framework). | 2026-06-14 |
| Killeen | City | Bell County; Central Texas / Fort Cavazos (Fort Hood) / I-14 / US-190; Killeen-Temple TX MSA | Impact fees (TLGC Ch. 395, Ord. 21-015, adopted 4/13/2021): Water $1,161 + Wastewater $418 per service unit (3/4-inch base; scales by meter size). FY 2026 Adopted Fee Schedule (eff. 10/1/2025): Zoning Application $500, CUP $750, PUD $1,000, Zoning Variance $275, Preliminary / Final Plat $500 + $25/lot, Commercial Site Plan Review $1,000 to $2,500; water meter base $380 (3/4 inch) to $1,400 (2 inch), City-installed tap $880 to $2,800, Sewer Tap Fee $500. Special-district fees not administered; proffers not applicable (TX framework). | 2026-06-15 |
| Seguin | City | Guadalupe County (county seat); Greater San Antonio metro / I-10 / SH-46; SSLGC regional water partner with Schertz; San Antonio-New Braunfels TX MSA | Impact fees (TLGC Ch. 395, Capital Cost Recovery, Code Ch. 102): Water $7,308 + Wastewater $9,250 per LUE (properties platted on or after 9/29/2023; City adopted full study maximum); roadway capital recovery (Ord. 2016-42). UDC Schedule of Fees (eff. 1/30/2023): Zoning Change $500, SUP $400, Final Plat $500 + $50/acre over 5 ac, Preliminary Plat $300, Site Plan $350 to $1,000 by acreage, Parkland Dedication $400/unit + Development Fee $800/unit. Special-district fee (collected by the City): SSLGC water $354.54/LUE. Utility tap fee unavailable via official sources (the capital recovery impact fee is the development water/sewer charge); proffers not applicable (TX framework). | 2026-06-15 |
| Prosper | Town | Collin County (straddles into Denton in western portions); DFW-north growth corridor north of Frisco; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395, collected at 50% of max; Impact Fee Worksheet for plats after 8/26/2025): roadway 2 service areas (SA1 West / SA2 East of BNSF), single-family detached $7,597 / $7,879 per dwelling unit; water 1-inch $5,969; wastewater 1-inch $8,421 (scales by meter size). Development fees (Ord. 2025-47, eff. 10/1/2025): zoning change $2,000 + $30/acre (PD $2,500 + $30/acre); SUP $700 + $50/acre; preliminary plat SF $500 + $25/lot; building permit residential $1.00/sq ft. Utility tap not applicable (developer water/sewer capital is the impact fee); special-district fees not applicable (PID per-district SAP); proffers not applicable (TX framework). | 2026-06-15 |
| Burleson | City | Johnson County (extends into Tarrant); DFW Metroplex south edge / I-35W / US-67; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395): Water $2,492 + Wastewater $1,731 per 5/8-inch meter (Ord. CSO#5345-12-2023, eff. 1/1/2024; scales by meter size), plus a Roadway Impact Fee (2023 study, max assessable $703 to $1,954 per vehicle-mile by service area). Burleson also collects additive City of Fort Worth impact fees. 2026 Zoning/SUP/Site Plan + Plat application fees: zoning change / SUP $700 to $2,800 by acreage; PD $1,000 + $20/acre; preliminary plat residential $850 + $15/lot; commercial site plan $500. Utility tap unavailable via official sources (the impact fee is the development water/sewer charge); special-district fees not administered (TIRZ tax-roll); proffers not applicable (TX framework). | 2026-06-15 |
| Rosenberg | City | Fort Bend County; Greater Houston metro / US-59 / I-69 / US-90A; near Sugar Land; Houston-The Woodlands-Sugar Land TX MSA | Impact fees (TLGC Ch. 395, Ord. 2023-47, plats on/after 12/19/2023): Water $2,693 + Sewer $2,100 = $4,793 per 5/8-inch x 3/4-inch meter (scales by meter size). Planning/plat/variance fees: Land Plan $1,500; PUD conceptual $750; Preliminary / Final Plat $500 + $3/lot + $15/acre of reserve; Variance $400; plumbing building permit $20 + $5/fixture. Water meter and sewer tap fees: meter 3/4-inch $600 / 1-inch $700; sewer tap 4-inch $635 / 6-inch $685 / 8-inch $825. Special-district fees not administered (Fort Bend MUD/TIRZ tax-roll); proffers not applicable (TX framework). | 2026-06-15 |
| Longview | City | Gregg County seat (extends into Harrison); East Texas / I-20 / US-259 / US-80; Longview TX MSA | Zoning/site-plan/plat fees (Development Services Fee Schedule): Rezone $420; SUP $420; BOA/Variance $420; Site Plan Review $640; Plat / Replat $320; building permit valuation-based per Schedule A; Demolition $105. Water and sewer tap fees: City-installed 5/8-inch meter $450 / 1-inch $756; sewer box (4 to 6-inch) $3,102 set; contractor tap permit $150 each; fire hydrant meter set $200 (deposit $800). Impact fees not administered (no TLGC Ch. 395 program; the tap fee is the development water/sewer cost); special-district fees not administered (TIRZ tax-roll); proffers not applicable (TX framework). | 2026-06-15 |
| Plano | City | Collin County (small portion in Denton); DFW Metroplex / US-75 (Central Expressway) / Dallas North Tollway / PGBT; Legacy West employment core; Dallas-Fort Worth-Arlington TX MSA | Zoning/development/subdivision fees (Development Fees for Planning & Engineering, Ord. 2026-3-7, eff. 3/23/2026): zoning petition $3,000 + $50/acre (max $20,000); planned development $5,000 + $50/acre; SUP $1,000-$3,000; preliminary plat $150/acre; final plat $800; site plan $200/acre; engineering plan review $1,000. Water and sewer tap / connection fees (Code of Ordinances Sec. 21-133): cost-of-service tap + $40 estimate fee; 4-inch sewer connection $50; fire hydrant flow test $75; meter/service-line location $25; fire-hydrant construction meter deposit $1,050. Impact fees not administered (former Ch. 21 Art. VI impact-fee article repealed/reserved; cost recovery via Art. V pro rata); special-district fees not administered (built-out home-rule city; tax-roll); proffers not applicable (TX framework). | 2026-06-18 |
| Little Elm | Town | Denton County; DFW-north growth corridor on Lewisville Lake; near Frisco / Prosper / The Colony; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395, Ord. No. 1431, eff. 12/19/2017, current tier for plats on/after 12/20/2017): water $1,519 + wastewater $2,930 per 5/8-inch meter (scales to 8-inch $121,520 / $234,400); roadway $583/service unit (SA1, 70% of max) + $421/service unit (SA2, 100%), single-family detached $3,498 (SA1) / $1,684 (SA2) per dwelling unit. Zoning/subdivision/building fees (Development Services Comprehensive Fee Schedule, June 18 2019): zoning map/text change $500; PD $750; SUP $500; single-family plat $300 + $15/lot; site plan review $500; residential building permit $0.85/gross sq ft. Utility tap not administered as a standalone fee (the impact fee is the developer water/sewer capacity charge; only a $50 meter-release fee); special-district fees not administered (PID/MUD tax-roll); proffers not applicable (TX framework). | 2026-06-18 |
| The Colony | City | Denton County; DFW-north on the east shore of Lewisville Lake; near Frisco / Lewisville / Little Elm; home to The Tribute community; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395, FY 2026 Master Fee Schedule, eff. 10/1/2025, current tier for plats after 12/1/2020): water $518 + sewer $4,034 per 5/8-inch meter (scales to 10-inch $129,500 / $1,008,500); roadway 2016 fees by ITE land use (single-family detached $3,561/dwelling unit; general office $5,455/1,000 SF GFA); Office Creek drainage $154.87/lot or ERU. Zoning/platting fees (same schedule): zoning/PD/SUP/site plan by acreage $375-$1,250+; single-family plat $375 + $15/lot; minor plat $300 + $10/acre; annexation petition $500. Water meter tap $475 (5/8-inch) to $4,270 (10-inch); 4-inch sewer tap $570; 4-inch fire line tap $1,895. Special-district fees not administered (The Tribute Developer's Agreement; tax-roll); proffers not applicable (TX framework). | 2026-06-18 |
| Waxahachie | City | Ellis County; DFW-south exurb on the Interstate 35E growth corridor; county seat; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395, Ord. 3654, eff. 8/18/2025): water $4,028 + wastewater $5,329 per 0.75-inch meter (one service unit), scaling to 12-inch turbine $805,600 / $1,065,800; roadway $1,380-$1,915 per service unit across five service areas. Zoning/platting fees: zoning change $500 + $10/acre; PD $1,000 + $20/acre; SUP $500 + $10/acre; site plan $500; plat/replat $500 + $10/lot; annexation $500; residential park land $400/dwelling unit in lieu. Utility tap unavailable as a standalone fee (developer capacity charge is the impact fee); special-district fees not administered (TIRZ tax-roll); proffers not applicable (TX framework). | 2026-06-19 |
| Amarillo | City | Potter County (county seat) and Randall County; Texas Panhandle regional center; I-40/I-27 crossroads; Amarillo TX MSA | Building and permit fees (Code of Ordinances Title IV Ch 4-1; current through Ord. 8218, 9-16-2025; fees escalate 3%/CPI annually): new single-family $0.52/sq ft; nonresidential value x 0.0038; minimum permit $139 + $70 per other permit; plan review nonresidential value x 0.0015 (min $83); electrical $0.40/ampere; HVAC $70 first unit; plumbing $9/fixture; contractor registration $66. Water service connection (Title XVIII Ch 18-2 Sec. 18-2-56): administrative fee $450 (up to 1 inch) / $600 (above 1 inch up to 2 inches); meter set and installation at actual cost; sewer lateral/tap at actual cost. Impact fees not administered (no Ch. 395 program); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-24 |
| San Angelo | City | Tom Green County; West Texas Concho Valley; county seat; San Angelo TX MSA | Zoning/platting fees (codified Appendix A Fee Schedule): zone change $595; special use $463; conditional use $424; PD zone change $668; preliminary/final/replat $400; comprehensive plan amendment $630; annexation $1,500; zoning verification letter $60. Water tap and meter fees: 5/8-inch $100 (stubbed) / $150 + trench, scaling to 6-inch compound $5,500; fire service taps $800-$2,500; out-of-city taps 1.5x; connection/activation $20. Impact fees not administered (West Texas slow-growth; no Ch. 395 program); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-19 |
| Wylie | City | Collin County (with portions in Dallas / Rockwall counties); fast-growing northeast DFW near Lake Lavon and the President George Bush Turnpike; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395): water $4,137.06 + wastewater $876.35 per service unit equivalent; roadway $453.00 per service unit (both zones); Section IV last amended Ord. 2023-44. Zoning/construction permit fees (Ord. 2025-08): zoning change $600 + $15/acre; PD $1,000 + $25/acre; SUP $750 + $20/acre; site plan $400 + $10/acre; new single-family $0.60/sq ft. Water/sewer tap fees (Ord. 2022-60): water tap $5,000 (to 1-inch) / $6,000 (to under 6-inch); sewer tap $6,500 (0-8 ft depth); fire hydrant installation $5,500. Special-district fees not administered (discretionary pro-rata formula only); proffers not applicable (TX framework). Source: codified Appendix A via Municode (city site firewall-blocked). | 2026-06-19 |
| McAllen | City | Hidalgo County; largest city in the Rio Grande Valley on the Texas-Mexico border; McAllen-Edinburg-Mission TX MSA | Building/construction permit fees (Permit Fee Schedule, eff. 10/1/2016, updated 7/25/2017, live-referenced current): new construction min $48 + $0.16/sq ft; Park Development Fee $700/unit; commercial plan review 18% of permit fee; electrical/plumbing/mechanical trade permits. Impact fees not administered (no Ch. 395 program; RGV slow-growth); utility tap fees unavailable via official sources (water/sewer run by the separate McAllen Public Utility board); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-19 |
| Laredo | City | Webb County; Texas-Mexico border, southern anchor of the Interstate 35 international trade corridor; county seat; Laredo TX MSA | Subdivision plat fees (Subdivision Plat Fee Schedule, Revised 12/2024): small residential preliminary plat $100 / final $50; larger preliminary $400 + $7.50/lot or $40/acre; final $400 + $5/lot + $40/acre; vacation $300/acre; amending $200; administrative $200. Building permit fees valuation-based (Ord. 2024-O-152, not a public numeric table); rezoning/CUP/site-plan fees in the Land Development Code appendix. Impact fees not administered (border city uses connection charges); utility tap fees unavailable via official sources (separate utilities portal); special-district fees not administered; proffers not applicable (TX framework). Source captured via browser (CivicEngage WAF). | 2026-06-19 |
| Arlington | City | Tarrant County; DFW Metroplex core city (~395K) between Dallas and Fort Worth; home-rule; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395, 2017 Impact Fee Program, eff. 7/1/2017): water $828 / sewer $418 collection per 5/8-inch meter equivalent (max $3,024 / $835); roadway by Service Areas A-J ($253-$312.50/SU collection; Areas D and J $0). Zoning/platting/building fees (Resolution 26-151, eff. 6/1/2026): general zoning change $1,200-$3,000 by acreage; PD/SUP/ASP $2,400 + per-acre; final plat $600 + $85/acre; commercial site plan review $1,000; building permits valuation-based (Table 1/2) + 35% plan review. Utility tap unavailable as a standalone fee (capacity charge is the impact fee); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-19 |
| Irving | City | Dallas County; DFW Metroplex core city (~256K) immediately west of Dallas; Las Colinas / DFW Airport frontage; home-rule; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395, Ord. 2024-10894, eff. 7/14/2024, per service unit, standard / Multifamily-MWD): water $1,605 / $2,756; wastewater $1,088 / $1,862; drainage $0.85 / $1.64; roadway by Service Area 1-5 ($146-$500 standard). Zoning/platting fees (Consolidated Fee Schedule FY24-25, Planning eff. 10/1/2023): zoning change $700-$2,450 by acreage; S-P-1/CUP/TOD detail $850-$3,600; final/replat $800 + $10/lot; minor plat $500. Utility tap unavailable as a standalone fee (capacity charge is the impact fee; water-rates page WAF-blocked); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-19 |
| Grand Prairie | City | Dallas / Tarrant / Ellis Counties; DFW Metroplex city (~200K) between Dallas, Arlington, and Irving; home-rule; Dallas-Fort Worth-Arlington TX MSA | Water/wastewater impact fees (UDC Article 22, Schedule 22.3-1a, eff. 9/2/2025) by meter size and sector: North 5/8-inch $1,711 water / $843 wastewater scaling to 10-inch $196,765 / $96,945; South 5/8-inch $4,676 / $1,624 scaling to 10-inch $537,740 / $186,760. Zoning/subdivision fees: zoning/SUP $1,000 + $40/acre (max $11,000); platting $500 + $20/lot or acre (max $10,500). Water/wastewater tap fees (UDC 22.4.3): existing-tap meter cost $150 (5/8-inch) to $450 (2-inch); new water tap $897.78 (3/4-inch) to $1,496 (2-inch); wastewater tap $1,250. Special-district fees not administered; proffers not applicable (TX framework). Source: consolidated UDC Article 22 Fee Schedule. | 2026-06-19 |
| Mesquite | City | Dallas County; DFW Metroplex city (~150K) east of Dallas; home-rule; NTMWD water supply; Dallas-Fort Worth-Arlington TX MSA | Roadway facility impact fees (Collection Rates Table 2, eff. 12/1/2020, by ITE land use): single-family detached $3,108/dwelling unit; apartment $1,927; general office $2,108/1,000 SF GFA; shopping center $2,044/1,000 SF GLA; fast food with drive-thru $10,150; hotel $500/room (maximums vary by Service Area A/B/C). Zoning/subdivision fees (eff. 10/1/2024): PD $1,500 + $15/acre; CUP $1,250; site plan $700/$800; plat/replat $500 + $25/acre; BOA variances $200-$750. Utility tap unavailable as a standalone fee (NTMWD supply; capacity charge is the impact fee); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-19 |
| Grapevine | City | Tarrant County; NE DFW Metroplex city (~50K) adjacent to DFW International Airport; home-rule; Dallas-Fort Worth-Arlington TX MSA | Plat filing fees (Development Fees, updated 12/7/2021, Appendix B): preliminary residential $100 + $5/lot, commercial/MF $100 + $25/acre; final $200+; replat $300+; abandonments (ROW/easement) $390 each. Open Space dedication exactions (Appendix D Sec. 51) $1,071-$1,416 per lot by district. Building permit fees valuation-based (Table 1-A): $50 ($1-$500) to $7,500 + $5/$1,000 (over $1M); residential R3 $0.55/sq ft. Water tap charges (Code Sec. 25-22): domestic 5/8-inch $800 pavement / $375 easement / $100 pre-made, to 2-inch $2,150; commercial 2-inch with bypass $2,500. Impact fees not administered (uses Open Space exactions, not Ch. 395); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-19 |
| Rowlett | City | Dallas County (small portion Rockwall); NE DFW Metroplex city (~67K) on Lake Ray Hubbard; home-rule; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395, Master Fee Schedule RES-26-05-42R, eff. 5/19/2026): roadway by ITE code, single-family detached $1,674/dwelling unit (both service areas), multifamily low-rise $965/DU; water + wastewater by meter, 5/8-inch residential $2,253 + $1,189 = $3,442, scaling to 3-inch $17,210. Zoning/subdivision fees: zoning change $250, plats $1,000-$2,250, site development plan $1,300, development agreement $2,250, zoning verification $100. Utility tap fees: actual cost + 25%, deep sewer tap (over 4 ft) $100, fire-hydrant setup $2,000. Special-district fees not administered; proffers not applicable (TX framework). Source: consolidated Master Fee Schedule. | 2026-06-20 |
| Cedar Hill | City | Dallas County; Best Southwest area of the southern DFW Metroplex (~48K); home-rule; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395, Ord. 2024-812, eff. 7/23/2024) collection rates: water $4,489/LUE, wastewater $1,686/LUE, roadway $1,059/vehicle-mile; single-family and townhouse water + wastewater reduced 40%. Zoning/subdivision fees: zoning change $500 + $5/acre + $75/sign, CUP $500 + $5/acre + $75/sign, site plan $250 + $10/acre, plats $150-$300 + $10/lot, PD concept plan $1,000 + $5/acre. Utility tap fees not administered as a separate schedule (recovered via Ch. 395 impact fees); special-district fees not administered; proffers not applicable (TX framework). | 2026-06-20 |
| DeSoto | City | Dallas County; Best Southwest area of the southern DFW Metroplex (~56K); home-rule; Dallas-Fort Worth-Arlington TX MSA | Zoning/subdivision fees: zoning change $2,300, Planned Development $3,000, SUP $3,000, site plan approval $2,200, variance $3,000, plats $250-$300 + per lot, zoning verification $250. Building permit fees: new single-family/duplex/townhouse $1,300 + $1,000 residential plan review; residential remodel $700-$925 by sq ft; commercial valuation-based ($27.67 to $1,263.37 + $7.14/$1,000). Impact fees administered (Ch. 395 water/wastewater/roadway since 9/2021) but the published rate document is a degraded scan and exact rates are not machine-verifiable; utility tap fees deferred to the Water Department; special-district fees not administered; proffers not applicable (TX framework). | 2026-06-20 |
| North Richland Hills | City | Tarrant County; Mid-Cities suburb of the NE DFW Metroplex (~70K) between Fort Worth and the HEB cities; home-rule; Dallas-Fort Worth-Arlington TX MSA | Building and inspection permit fees (Inspection Fee Schedule): new 1 and 2 family residential and townhomes $1.10/sq ft; commercial valuation-based (Table 1a) with plan review 65% of permit fee (Code Sec. 98-92(c)); minor remodel $30 + $0.50/sq ft, major remodel $39 + $0.80/sq ft; re-inspection $55. Impact fees administered (Ch. 395 water/wastewater) but the published study reports the maximum allowable rate not the adopted collected rate, and the codified rate is on a bot-protected host (not machine-verifiable); discrete zoning-case application fees codified off-source and not captured; utility tap fees and special-district fees not administered; proffers not applicable (TX framework). | 2026-06-20 |
| Midlothian | City | Ellis County; southern DFW exurb on the US-67 corridor (~40K, fast-growing); home-rule; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395, Master Fee Schedule RES 2025-30, eff. 6/10/2025; program Ord. 2022-12 eff. 10/1/2022): roadway single-family detached $2,906.28; utility (water + sewer) by meter ESU, 3/4-inch $5,642 water + $4,436 sewer = $10,078 scaling to 2-inch $40,312. Zoning/subdivision fees: zone change standard $500 + $10/acre, PD $500 + $30/acre, SUP $350 + $10/acre, site plan review $350, plats $200-$400 + $10/lot, zoning verification $50. Utility tap and meter fees: water taps $1,000, 1-inch meter $2,500, compound meter $1,750, fire-hydrant construction meter $150. Special-district fees not administered; proffers not applicable (TX framework). | 2026-06-20 |
| Celina | City | Collin County (straddles into Denton County in western portions); DFW-north growth corridor immediately north of Prosper, above Frisco and McKinney; one of the fastest-growing U.S. cities; home-rule; Dallas-Fort Worth-Arlington TX MSA | Impact fees (TLGC Ch. 395, 2025 studies, plats on/after 3/12/2025): water and wastewater by meter, 1-inch $6,815 water + $10,233 wastewater = $17,048 per single-family home, scaling to 8-inch $272,600 water + $409,320 wastewater; roadway impact fee service-area-variable (example ~$14,000/unit, Service Area 4). Zoning/development fees (Master Fee Chart, updated 11/11/2025): zoning change/PD/annexation $750, SUP $500, site plan $750, plats $400-$500 + $15/lot; building permit new 1 and 2 family $1.12/sq ft under roof + $50 application + $425 plan review. No separate utility tap fee (developer water/sewer capital is the impact fee + $200 deposit); PID special-district assessments set per district; proffers not applicable (TX framework). | 2026-06-28 |
| Temple | City (home rule) | Bell County; Killeen-Temple, TX MSA (I-35 Corridor) | Planning, zoning, platting, and building permit fees; water, wastewater, and fire-line tap and meter fees. Impact fees under Texas Local Government Code Chapter 395 not administered; proffers not applicable; special-district fees not administered | 2026-06-25 |
What This Coverage Includes
ZoneFee currently has 38 Texas jurisdictions live across the Central Texas / I-35 corridor, the DFW Metroplex, the South Texas / I-35 corridor, the Tarrant County region, the East Texas hub, the Houston metro southeast and Bay Area, the West Texas / Permian Basin, and the Brazos Valley. The Central Texas group covers the Austin-Round Rock-Georgetown MSA (Austin, Georgetown, Leander, Round Rock, Cedar Park, Pflugerville, Hutto, Buda, Kyle, San Marcos, New Braunfels, and the county-level records at Hays County, Williamson County (the north Austin-metro county), and Travis County (the Austin metro core county)). The DFW group covers the City of Dallas (Dallas County) plus Collin and Denton counties (Frisco, Denton, McKinney, and Celina, the fast-growing DFW-north city on the Collin/Denton line above Prosper), Tarrant County (Fort Worth), the tri-county DFW north suburb of Carrollton (Dallas/Denton/Collin), Lewisville (Denton County, on the I-35E corridor between Dallas and Denton), the Town of Flower Mound (Denton County, on the SH 121 / FM 2499 corridor near Lake Grapevine), and Mansfield (southeast Tarrant County, with portions in Johnson and Ellis Counties, on the US-287 / SH 360 corridor). The South Texas group adds the City of San Antonio (Bexar County). The East Texas group adds Tyler (Smith County seat). The Houston metro adds Pearland (Brazoria/Fort Bend/Harris) and League City (Galveston, with Harris overlap; the largest city in Galveston County). The West Texas / Permian Basin group adds Midland (Midland County seat) and Odessa (Ector County seat). The Brazos Valley group adds College Station (Brazos County), and the Greater Houston group adds Conroe (Montgomery County seat, on the I-45 / Lake Conroe corridor) and Sugar Land (Fort Bend County, a master-planned MUD-developed city on the US-59/I-69 and Grand Parkway SH 99 corridor), and the Gulf Coast group adds Galveston (Galveston County seat, a barrier-island city in the Houston MSA that administers a TLGC Chapter 395 impact fee program adopted at a $0.00 collection rate). A new Far West Texas group adds El Paso (El Paso County seat, a US-Mexico border city on the Rio Grande whose City has not adopted a Chapter 395 impact fee program and whose water and wastewater connection charges are administered separately by El Paso Water). Each jurisdiction page is published under ZoneFee's Partial-Verified Publication Standard with at least one development-fee family confirmed verbatim from an official primary source (city ordinance, codified municipal code, adopted fee schedule, or fee-study PDF) with SHA-256 source hashes recorded. Authority pages for separate water and wastewater utilities (Austin Water, SAWS, Travis County WCID 17, and others) are published or queued as separate authority records.
Researching Texas Fees: What to Expect
Looking up Texas development fees typically requires consulting four document types per jurisdiction: (1) the city's adopted Master Fee Schedule or Development Services Fee Schedule (for application, platting, site plan, and permit fees); (2) the city's Roadway Impact Fee Study and Water/Wastewater Impact Fee Study (for impact fee maximums and adopted collection rates); (3) the codified impact fee ordinance chapter (typically Chapter 395-equivalent in the city code, often at eCode360 or Municode); and (4) the city's utility department or Public Works tap fee schedule (for water, wastewater, and where applicable electric connection costs). For projects in Municipal Utility Districts or Water Control and Improvement Districts, the district's own rate order adds a fifth document. ZoneFee jurisdiction pages bring these together into one record per covered city, with verbatim source quotes and direct .gov links.
Texas Development Fees - Frequently Asked Questions
Does Texas use impact fees?
Yes. Texas municipalities and certain counties may impose impact fees under Texas Local Government Code (TLGC) Chapter 395. Impact fees fund roadway, water, and wastewater capital improvements needed to serve new development. To impose an impact fee, a Texas city must adopt land use assumptions, a capital improvements plan, and a maximum fee per service unit by ordinance after public hearings. The fee is charged at plat approval or building permit issuance and is calculated on a per-service-unit (LUE) basis.
What is TLGC Chapter 395?
Texas Local Government Code Chapter 395 is the Texas state statute authorizing municipal and county impact fees. It defines what fees may be charged, sets procedural requirements (public hearings, advisory committees, semi-annual reports), specifies how maximum fees are calculated, and limits what infrastructure categories the fees may fund. Chapter 395 establishes a uniform framework so impact fees in Texas are consistent in structure across cities, even when amounts vary by service area.
Are there state caps on Texas municipal fees?
Texas does not cap total municipal fees at the state level, but TLGC Chapter 395 caps each impact fee at the maximum supported by the city's adopted Roadway Impact Fee Study or Water/Wastewater Impact Fee Study. Cities may collect at the maximum or at a lower collection rate established by ordinance. Other fees - zoning, platting, site plan, building permits - are set by each city's adopted fee schedule and are not subject to a statewide cap.
What development fees do Texas cities typically charge?
Texas cities typically charge: (1) impact fees under TLGC Chapter 395 for roadway, water, and wastewater - charged per service unit at plat or permit; (2) zoning application fees for rezoning, special use permits, variances, and PUD amendments; (3) platting fees for preliminary, final, and replat applications; (4) site plan and engineering review fees; (5) building permit fees, plan review fees, and inspection fees; (6) utility tap and meter fees for new connections; and (7) capital recovery or buy-in fees in some cities. Special districts (MUDs, WCIDs) may add their own fees on top.
How are Texas impact fees different from Virginia proffers?
Texas impact fees are statutory, schedule-based, and apply uniformly to all qualifying development in a service area; the amount is calculated by formula from the city's adopted maximum fee and collection rate. Virginia proffers are voluntary, case-by-case, and negotiated during the rezoning approval process; their amounts are set by individual rezoning ordinances rather than by a posted schedule. A developer can predict Texas impact fee exposure from the city's published schedule; Virginia proffer exposure requires examining recent rezoning cases for the specific jurisdiction.
Where does ZoneFee source Texas fee data?
ZoneFee sources Texas fee data from official city websites (georgetowntexas.gov, roundrocktexas.gov, and equivalent), city-published fee schedules retrieved as PDFs, codified municipal ordinances via eCode360 or Municode, city Legistar records for ordinance adoption history, and the Texas Local Government Code via statutes.capitol.texas.gov. We do not source fee data from third-party aggregators, news articles, or AI summaries. See the methodology page for the full source hierarchy.
What Texas Coverage Is Not Yet on ZoneFee
Texas coverage is expanding. The 24 jurisdictions named above are currently live; additional Central Texas, DFW, South Texas, East Texas, and Houston-area jurisdictions are queued in our expansion plan but have not yet reached ZoneFee's verification standard. We do not list pending jurisdiction names on this page; transparency on what is and is not yet covered lives on the ZoneFee coverage page. If your project is in a Texas jurisdiction we have not yet covered, the city's own Development Services or Planning and Zoning department remains the binding source for current fees, with the impact fee study published on the city's Engineering or Public Works section.
Texas Sources Used on This Page
- Texas Local Government Code Chapter 395 - Impact Fees. Accessed 2026-04-27.
- TLGC Chapter 211 - Municipal Zoning Authority. Accessed 2026-04-27.
- TLGC Chapter 212 - Municipal Subdivision Regulation. Accessed 2026-04-27.
- TLGC Chapter 214 - Municipal Regulation of Housing and Other Structures. Accessed 2026-04-27.
- Texas Water Code Chapter 49 - Provisions Applicable to Districts. Accessed 2026-04-27.
State-level framework last reviewed: 2026-04-27. Live jurisdiction record verification dates range from 2026-03-27 (Georgetown) through 2026-05-09 (San Antonio); per-jurisdiction last-verified dates are shown on each page. For the full ZoneFee coverage list, see the ZoneFee coverage page.