Tomball, Texas - City Development Fees
Tomball | City | Harris County | Houston-The Woodlands-Sugar Land MSA (SH-249 / FM-2920 corridor, northwest of Houston)
Tomball is a home-rule city in Harris County along the State Highway 249 and FM-2920 corridor northwest of Houston, in the Houston-The Woodlands-Sugar Land metroplex. A historic railroad and oil-and-gas town now growing as a northwest Houston-metro suburb, Tomball operates its own municipal water, wastewater, and natural gas utilities, so - unlike many municipal-utility-district-financed Houston-metro peers - it levies citywide Chapter 395 water and wastewater impact fees directly. The City publishes a single consolidated Master Fee Schedule for Fiscal Year 2025-2026 (effective November 18, 2025) covering development permits, planning and plat fees, impact fees, drainage impact fees, utility tap fees, and a Public Improvement District application fee. The figures below are drawn from that Master Fee Schedule. As noted in the coverage notes, ongoing PID and municipal utility district assessments are levied by the district rather than through the City fee schedule. Verify current amounts with the City of Tomball before relying on them.
On this page
Schedule status: The newest impact fee, zoning and development application fee, utility tap and connection fee and special district fee schedules ZoneFee has verified for Tomball are labelled for a fiscal year that ended September 30, 2026. We have not yet confirmed whether a newer schedule has been adopted, so the amounts in those sections may have been superseded and should not be treated as current.
Confirm current amounts with the City of Tomball before relying on them. This notice was added on November 4, 2026 and will be removed once a current schedule is verified.
Fee Summary
| Fee Type | Status | Top-Line Figure | Effective Date |
|---|---|---|---|
| Impact Fees (water and wastewater; Chapter 395; plus drainage) | Confirmed | Water + wastewater $14,687 total at 5/8" meter (1.0 LUE) up to $2,446,853 at 10"; drainage $436.88 to $7,886.69 per acre by basin | Master Fee Schedule FY 2025-2026 (effective Nov 18, 2025) |
| Zoning and Plat Application Fees (zoning, plat, and subdivision) | Confirmed | Rezoning $1,000; PD $2,000; CUP $1,000; variance $500; plats $500 + $20/lot (max $2,500) | Master Fee Schedule FY 2025-2026 (effective Nov 18, 2025) |
| Utility Tap / Connection Fees (municipal water, sewer, and gas) | Confirmed | Water taps $1,700 to $3,800; sewer taps $1,560 / $1,835; natural gas taps $1,775 to $4,650 | Master Fee Schedule FY 2025-2026 (effective Nov 18, 2025) |
| Special District Fees (PID application fee) | Confirmed | Public Improvement District application fee $2,500.00, nonrefundable, at petition submission | Master Fee Schedule FY 2025-2026 (effective Nov 18, 2025) |
| Proffers | Not applicable | Texas has no cash proffer regime; exactions run through TLGC Ch. 212 and Ch. 395 | - |
Impact Fees
Source: City of Tomball Master Fee Schedule FY 2025-2026 (effective November 18, 2025), Water and Wastewater Impact Fees and Drainage Impact Fees. Tomball operates its own municipal water and wastewater utilities and levies water and wastewater impact fees under Texas Local Government Code Chapter 395, scaled by water meter size and Living Unit Equivalents (LUEs). The City also charges Drainage Impact Fees per acre by drainage basin.
| Meter size (LUE) | Water | Wastewater | Total |
|---|---|---|---|
| 5/8 inch (1.0 LUE) | $6,618 | $8,069 | $14,687 |
| 1 inch (1.6 LUE) | $10,588 | $12,910 | $23,498 |
| 1.5 inch (5.3 LUE) | $35,075 | $42,765 | $77,840 |
| 2 inch (6.6 LUE) | $43,678 | $53,255 | $96,933 |
| 3 inch (13.3 LUE) | $88,019 | $107,317 | $195,336 |
| 4 inch | - | - | $390,673 |
| 6 inch | - | - | $782,816 |
| 8 inch | - | - | $1,321,830 |
| 10 inch (166.6 LUE) | - | - | $2,446,853 |
| Drainage Impact Fee (per acre by basin) | Amount |
|---|---|
| Basin M118 | $5,757.81 |
| Basin M121E | $7,886.69 |
| Basin M121W | $6,692.00 |
| Basin M125 | $436.88 |
The water and wastewater impact fees are capital-recovery fees keyed to the water meter size and living unit equivalent; the combined total at a standard 5/8-inch residential meter (1.0 LUE) is $14,687. This is a full, city-administered Chapter 395 impact fee schedule - a contrast to the municipal-utility-district-financed peers common in the Houston metro. The Drainage Impact Fees are assessed per acre according to the development's drainage basin. These impact fees are distinct from the utility tap charges below.
Zoning and Plat Application Fees
Source: City of Tomball Master Fee Schedule FY 2025-2026 (effective November 18, 2025), Development Permits, Inspections and Fees (Plat Fees and Planning Fees). The zoning, variance, and plat application fees below are captured from that schedule.
| Application Type | Fee |
|---|---|
| Rezoning | $1,000.00 |
| Zoning Text Amendment | $1,000.00 |
| Conditional Use Permit | $1,000.00 |
| Planned Development (with concept or site plan) | $2,000.00 |
| Non-residential Site Plan Review | $300.00 + $10.00 per acre |
| Single-family Site Plan / Elevation Review | $100.00 |
| Variance / Special Exception (Board of Adjustments) | $500.00 |
| Zoning Verification Request | $75.00 |
| Major Thoroughfare Plan Amendment | $1,000.00 |
| Plat Fees (Preliminary / Final / Replat / Minor) | $500.00 base + $20.00 per lot (max $2,500.00) |
| Joinder Lot | $100.00 |
| Civil Plan Review Fee | $225.00 per acre (minimum $225.00) |
Authority: City of Tomball Community Development (Planning, Building, Engineering). The fees above confirm the zoning and platting fee family for this jurisdiction. Plat fees are capped at $2,500 regardless of lot count, and the civil plan review fee is charged per acre with a $225 minimum.
Water, Sewer, and Gas Tap Fees
Source: City of Tomball Master Fee Schedule FY 2025-2026 (effective November 18, 2025), Water Tap Fees, Wastewater (Sewer) Tap Fees, and Natural Gas Tap Fees. Tomball runs its own municipal water, sewer, and natural gas utilities. The tap and meter charges below are separate from the Chapter 395 impact fees above; a new connection pays both.
| Connection | Fee |
|---|---|
| Water Tap - 5/8-3/4 inch | $1,700.00 |
| Water Tap - 1.0 inch | $1,850.00 |
| Water Tap - 1.5 inch | $3,500.00 |
| Water Tap - 2.0 inch | $3,800.00 |
| Water Meter Installation - 5/8-3/4 inch to 2.0 inch | $500.00 to $2,000.00 |
| Wastewater (Sewer) Tap - 4 inch | $1,560.00 |
| Wastewater (Sewer) Tap - 6 inch | $1,835.00 |
| Natural Gas Tap - 0 to 345k BTU up to 450k-1.76M BTU | $1,775.00 to $4,650.00 |
| State Right-of-Way surcharge - water / wastewater | +$190.00 / +$250.00 |
Authority: City of Tomball Public Works (Utilities). The City will not install water taps larger than 2 inches or sewer taps larger than 6 inches; larger taps are the applicant's responsibility. Boring fees are also listed on the schedule for taps requiring bores. Monthly water, sewer, and gas service rates and volumetric charges are recurring billing charges, not development fees, and are excluded here.
Special District (PID) Fees
Source: City of Tomball Master Fee Schedule FY 2025-2026 (effective November 18, 2025), Public Improvement District Fees.
| Fee | Amount |
|---|---|
| Public Improvement District application fee (nonrefundable, at petition submission) | $2,500.00 |
Authority: City of Tomball. This is the one-time, city-collected PID petition and application fee. Ongoing Public Improvement District assessments under Texas Local Government Code Chapter 372, and any Harris or Montgomery County municipal utility district assessments under Water Code Chapters 54 and 49, are levied and collected in connection with the district itself, not through the City fee schedule. Only the PID application fee is a city-administered line item.
Coverage Notes - What This Page Does Not Cover
Per ZoneFee's Partial-Verified Publication Standard, the items below were either not itemized in full on this page or are levied outside the City fee schedule. They are disclosed here rather than estimated, paraphrased from a non-official source, or omitted silently. These items remain under limited-coverage review until any remaining gaps are closed from official sources.
Currency caveat
The impact fees, drainage impact fees, zoning and plat application fees, utility tap fees, and PID application fee on this page derive from the City of Tomball Master Fee Schedule for Fiscal Year 2025-2026 (effective November 18, 2025). Fee schedules change. Confirm current amounts directly with the City of Tomball before relying on them.
Impact fee ladder scope
The water and wastewater impact fee amounts above show representative meter sizes and living unit equivalents from the full ladder; the schedule lists additional intermediate meter sizes. Drainage impact fees are shown for the four listed basins. Developers with an unlisted meter size or a project in a different drainage basin should confirm the applicable amounts directly with the City.
PID and MUD assessment scope
The special-district fee confirmed on this page is the City's one-time Public Improvement District application fee ($2,500, nonrefundable, at petition submission). Ongoing PID assessments (Local Government Code Chapter 372) and any county municipal utility district assessments (Water Code Chapters 54 and 49) are levied and collected in connection with the district, not through the City fee schedule, and are outside the scope of the City-administered fee families reported here.
Proffers
Cash proffers are a Virginia statutory instrument under Virginia Code Section 15.2-2303.4 with no Texas counterpart. Texas exactions run through Local Government Code Chapter 212 (subdivision and development) and Chapter 395 (impact fees); Tomball's water and wastewater impact fees sit under Chapter 395. Closed-search outcome: this fee family does not apply to this jurisdiction.
Fee Authorities
| Authority | Fee Types | Official Website |
|---|---|---|
| City of Tomball Community Development (Planning, Building, Engineering) | Zoning, conditional use permit, and planned development fees; plat and subdivision fees; drainage impact fees; PID application fee | tomballtx.gov |
| City of Tomball Public Works (Utilities) | Water and wastewater capital-recovery impact fees; water, sewer, and natural gas tap and meter installation charges | tomballtx.gov |
See the impact fees guide for how Texas Local Government Code Chapter 395 works, and the Texas hub for other jurisdictions covered by ZoneFee. Nearby covered jurisdictions include Houston, Conroe, Sugar Land, and Fulshear.
Sources
Last verified by ZoneFee: 2026-09-05. Fee schedules are subject to change. Verify current rates directly with the City of Tomball (Community Development and Public Works) before relying on this data for any financial decision.
This page reflects fee data sourced from the City of Tomball Master Fee Schedule for Fiscal Year 2025-2026 (effective November 18, 2025). ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. As noted above, the impact fee ladder lists additional meter sizes not all shown here; ongoing PID and municipal utility district assessments are district-levied and outside the City fee schedule; and Texas has no cash proffer regime. Verify all current rates directly with the City of Tomball before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.