League City, Texas - City Development Fees

League City | City | Houston Metro Southeast / Bay Area / I-45 South corridor | Houston-The Woodlands-Sugar Land, TX MSA | Primary county: Galveston (Harris overlap)

League City is the largest city in Galveston County, Texas, and a Houston-metro southeast suburb on the I-45 South / Bay Area corridor. The City of League City Planning & Development Department (Engineering) administers developer-side fees through the Fees and Permits landing, with rate schedules adopted by City Council ordinance. League City's development-side fee surface organizes around three live programs: Capital Recovery Fees (Texas Local Government Code Chapter 395) for Water and Wastewater and for Roadway, engineering / inspection / TIA fees (Ord 2024-03, effective February 1, 2024), and Planning Department application fees (Resolution No. 2026-143, effective August 1, 2026 with a second step on January 1, 2027). Department address: 500 W Walker, League City, TX 77573; Building 281-554-1429, Planning 281-554-1080.

Fee summary

Fee type Status Top-line figure Effective date
Water and Wastewater Capital Recovery Fee Confirmed Single-Family / Mobile Home $14,825 combined ($9,074 water + $5,751 wastewater); townhome / condo / apt $11,860; commercial by meter size 3/4" $14,825 to 10" $1,136,587 2023-12-01
2024 Roadway Capital Recovery Fee Confirmed Cost per service unit (per vehicle-mile) by roadway service area: SA1 $1,172 / SA2 $2,056 / SA3 $1,671 / SA4 $1,842 (citywide avg $1,774); worked example SF home in SA3 = $6,366.51 2025-04-01
Engineering Plan Review and Construction Inspection Confirmed Plan review $9,350 per review (initial submittal invoices two = $18,700); construction inspection $5,500 per month; TIA $300 / $800 / $1,000 (Level 1 / 2 / 3) 2024-02-01 (Ord 2024-03)
Planning Department Application Fees (zoning, SUP, plats, variances, site plans) Confirmed Zoning map amendment $1,663 (from 2026-08-01) / $2,000 (from 2027-01-01); preliminary plat $762.50 + $15.50/lot / $1,000 + $20/lot; SUP $1,525 + $50/acre / $2,000 + $100/acre 2026-08-01; step-up 2027-01-01 (Res. 2026-143)
Building Permit Fee Schedule Pending Pending re-verification against the current official schedule (the March 1, 2024 permit fee schedule previously cited is no longer posted) -
Tap and Meter Fees (Service Connection Costs) Confirmed Residential water tap $225 (3/4") to $300 (2"); sewer tap $250; residential meters $270 to $805; commercial water tap $250 to $300; sewer tap $300; commercial meters $270 to $1,131 (incl. compound) 2024-01-01
Proffers Not applicable Texas jurisdictions do not use Virginia-style cash proffers (Va. Code 15.2-2303.4 framework) -
Special District Fees (TIRZ / MUD / PID) Not administered by this city MUDs overlaying Galveston County (e.g., Bay Colony) and any PID/TIRZ are independent political subdivisions whose rates are set by their own boards; not consolidated on the City fee surface -

Capital Recovery Fees (Texas Local Government Code Chapter 395)

League City administers two live Capital Recovery Fee programs under Texas Local Government Code Chapter 395: the Water and Wastewater CRF (adopted rate start date 2023-12-01) and the 2024 Roadway CRF (Ordinance No. 2024-49, effective for plats recorded on/after 2025-04-01).

Water and Wastewater Capital Recovery Fee

Source: League City Water and Wastewater Capital Recovery Fee Current Rate chart, /DocumentCenter/View/25260 (SHA-256 26d86123...). Adopted rate start date 2023-12-01. Residential rates apply per dwelling unit; commercial rates apply by meter size and include both water and wastewater components.

Residential

Dwelling unit type Water Wastewater Combined
Single Family / Mobile Home$9,074.00$5,751.00$14,825.00
Townhome / Condominium / Apartment (0.8 of SF rate)$7,259.20$4,600.80$11,860.00

Commercial (combined water + wastewater, by meter size)

Meter sizeCombined CRF
3/4"$14,825.00
1"$24,712.00
1.5"$49,411.00
2"$79,061.00
3"$158,137.00
4"$247,087.00
6"$494,161.00
8"$790,661.00
10"$1,136,587.00

2024 Roadway Capital Recovery Fee (Ord 2024-49)

Source: 2024 League City Roadway Capital Recovery Fee Final Report (Freese and Nichols, September 3, 2024), /DocumentCenter/View/46423 (SHA-256 9f2dd541...), adopted in its entirety as Exhibit A by Ordinance No. 2024-49 (passed and adopted November 12, 2024; /DocumentCenter/View/46422 SHA-256 b8ef546d...). Assessed at final platting; paid at building permit. The roadway CRF for a project is calculated per Section 7.2 of the Study: development service units (vehicle-miles, from the city's adopted ITE-11th-edition land-use equivalency table) multiplied by the cost per service unit for the project's service area.

Cost per service unit, by roadway service area (Table 19, 2024 Credited Maximum Allowable)

Service areaCost per service unitUnit
Service Area 1$1,172.00per vehicle-mile
Service Area 2$2,056.00per vehicle-mile
Service Area 3$1,671.00per vehicle-mile
Service Area 4$1,842.00per vehicle-mile
Citywide average$1,774.00per vehicle-mile

Worked examples (from Section 7.2 of the Study)

Project typeService unitsService areaRoadway CRF
Single-Family Dwelling3.81 vehicle-milesSA3$6,366.51
10,000 sf Office77.80 vehicle-milesSA3$130,003.08
20,000 sf Retail Center83.60 vehicle-milesSA3$139,695.60
100,000 sf Light Industrial351.00 vehicle-milesSA3$586,521.00

Plats recorded on or after April 1, 2025 pay the 2024 schedule above. Plats recorded March 1, 2019 through March 31, 2025 pay the predecessor 2018 / Ord 2021-32 schedule. Plats approved before March 1, 2019 pay no roadway CRF. Ordinance 2019-01 established the original roadway impact fee; Ordinance 2021-32 updated it in 2021; Ordinance 2024-49 is the current update. There is no separate Mobility CRF distinct from the Roadway CRF.

Engineering, Inspection, Traffic Impact, and Planning Fees

Source: Ordinance No. 2024-03, /DocumentCenter/View/44508 (SHA-256 3daaf3b1...), effective February 1, 2024 (Section 9), for the plan review and construction inspection fees; League City Fees and Permits landing, leaguecitytx.gov/3285/Fees-Permits (SHA-256 559412b4...), for the traffic impact assessment review fees.

Fee type Amount Unit Notes
Plan Review Fee$9,350.00per plan reviewInitial submittal invoices two reviews = $18,700; each subsequent submittal invoices an additional $9,350
Construction Inspection Fee$5,500.00per monthAssessed against developer-submitted construction schedule; due no later than the pre-construction meeting. Additional $5,500/month for each month beyond initial schedule, due before final acceptance.
Traffic Impact Assessment Review - Level 1$300.00per submittalDue at time of submittal
Traffic Impact Assessment Review - Level 2$800.00per submittalDue at time of submittal
Traffic Impact Assessment Review - Level 3$1,000.00per submittalDue at time of submittal
Building permit, trade permit, and re-inspection feesPending re-verification against the current official schedule-The March 1, 2024 permit fee schedule previously cited here is no longer posted by the City

Planning Department application fees

Source: League City Planning Department Fee Schedule, adopted July 28, 2026 under Resolution No. 2026-143, /DocumentCenter/View/2951 (SHA-256 e339a764...). The schedule sets two periods: a 50% fee increase beginning August 1, 2026 and a 100% fee increase beginning January 1, 2027.

ApplicationAug 1, 2026 - Dec 31, 2026From Jan 1, 2027
City Council Appeals$663$1,000
City Council Variances$763$1,000
Subdivision Variance (P&Z Variance / Buffer Yard Amendment)$675$1,000
ZBA Appeal$663$1,000
ZBA Variance$663$1,000
Preliminary Plat$762.50 plus $15.50 per lot$1,000 plus $20 per lot
Final Plat$762.50 plus $14.50 per lot$1,000 plus $20 per lot
Amended Plat$662.50 plus $12.50 per lot$800 plus $20 per lot
Replat$662.50 plus $12.50 per lot$800 plus $20 per lot
Minor Plat$412.50 plus $10 per lot$500 plus $20 per lot
Master Plan (Plat)$1,525$2,000
Plat Extension$163$200
PUD Zoning & Concept Plan$4,075 plus $5 per acre$5,000 plus $10 per acre
PUD Master Plan$1,525$2,000
Zoning Map Amendment$1,663$2,000
Zoning Verification Letter$100$100
SUP - All Other$1,525 plus $50 per acre$2,000 plus $100 per acre
SUP - Communication Towers$1,525 plus $50 per acre$2,000 plus $100 per acre
SUP - Excavations$1,525 plus $55.50 per acre$2,000 plus $100 per acre
Temporary Use Permit - P&Z Approval$413$500
Master Development Plan / Site Plan - less than 1 acre$525$525
Master Development Plan / Site Plan - 1 to 2.5 acres$1,050$1,050
Master Development Plan / Site Plan - 2.51 to 5 acres$1,575$1,575
Master Development Plan / Site Plan - 5.01 to 10 acres$2,100$2,100
Master Development Plan / Site Plan - 10.01 to 15 acres$2,625$2,625
Master Development Plan / Site Plan - over 15.01 acres$2,625 plus $125 per acre$2,625 plus $125 per acre

Utility Tap and Meter Fees

Source: City of League City Service Connection Costs (Tap and Meter Fees), dated January 2024, /DocumentCenter/View/43912 on the tx-leaguecity5.civicplus.com mirror (SHA-256 eaafe2a4...). Effective 2024-01-01. Tap fees are distinct from the Water-Wastewater Capital Recovery Fee captured under impact_fees.

Residential

ItemSizeAmount
Water service tap3/4"$225.00
Water service tap1"$250.00
Water service tap1.5"$275.00
Water service tap2"$300.00
Sewer service tap(standard)$250.00
Meter (3/4")3/4"$270.00
Meter (1")1"$325.00
Meter (1.5")1.5"$620.00
Meter (2")2"$805.00

Commercial

ItemSizeAmount
Water service tap3/4"$250.00
Water service tap1" or larger$300.00
Sewer service tap(standard)$300.00
Meter (3/4")3/4"$270.00
Meter (1")1"$325.00
Meter (1.5")1.5"$584.26
Meter (2")2"$772.19
Meter (1.5" compound)1.5" compound$1,037.66
Meter (2" compound)2" compound$1,131.00

Meters larger than 2 inches are provided by the contractor.

Two fee families are documented as closed-search outcomes for League City after substitute-source enumeration:

  • Proffers - not applicable. Cash proffers are a Virginia statutory construct under Va. Code 15.2-2303.4. Texas jurisdictions do not use cash proffers. League City's developer-side capital contribution occurs through the Ch. 395 Capital Recovery Fees (water-wastewater + roadway), tap and meter fees, and platting / permit fees, all captured above.
  • Special district fees (PID / MUD / TIRZ) - not administered by the City of League City. The City does not publish a consolidated special-district development fee schedule. Four official League City URLs were probed (Fees-Permits landing, Planning, Budget, and the city site search) - none surfaced a city-administered special-district fee. MUDs overlaying the Bay Area and Galveston County area (e.g., Bay Colony) are independent political subdivisions whose rates are set by their own governing bodies; any PID or TIRZ is a project-specific tax / financing mechanism, not a city-administered developer fee. Special-district overlay charges, where they apply, are administered directly by the overlay district, not by the City.

Building permit, trade permit, and re-inspection fees are not shown: the March 1, 2024 permit fee schedule previously cited here is no longer posted by the City, and no current permit fee schedule has been captured yet. They are pending re-verification against the current official schedule.

Sources

City of League City Planning & Development Department (Engineering) - Fees and Permits landing - leaguecitytx.gov/3285/Fees-Permits - accessed 2026-05-20 · fetch · SHA-256 559412b4...

City of League City - Water and Wastewater Capital Recovery Fee Current Rate chart - leaguecitytx.gov/DocumentCenter/View/25260 - accessed 2026-05-24 · curl + pdfplumber · SHA-256 26d86123...

City of League City Engineering - 2024 League City Roadway Capital Recovery Fee Final Report (Freese and Nichols, September 3, 2024) - leaguecitytx.gov/DocumentCenter/View/46423 - accessed 2026-05-29 · curl + pdfplumber · SHA-256 9f2dd541...

City of League City Engineering - 2024 League City Roadway Capital Recovery Fee Letter and Ordinance No. 2024-49 - leaguecitytx.gov/DocumentCenter/View/46422 - accessed 2026-05-24 · curl + Stage 5 OCR · SHA-256 b8ef546d...

City of League City Utility Billing / Public Works - City of League City Service Connection Costs (Tap and Meter Fees), JAN 2024 - tx-leaguecity5.civicplus.com/DocumentCenter/View/43912 - accessed 2026-05-27 · fetch + pdfplumber · SHA-256 eaafe2a4...

City of League City Engineering - Ordinance No. 2024-03, Engineering Services and Construction Inspection Fees (effective February 1, 2024) - leaguecitytx.gov/DocumentCenter/View/44508 - accessed 2026-11-04 · download + page images · SHA-256 3daaf3b1...

City of League City Planning Department - Planning Department Fee Schedule, adopted July 28, 2026 under Resolution No. 2026-143 - leaguecitytx.gov/DocumentCenter/View/2951 - accessed 2026-11-04 · download + pdfplumber · SHA-256 e339a764...

City of League City Engineering - Mobility Capital Recovery Fee Ordinance No. 2019-01 (superseded; historical) - leaguecitytx.gov/DocumentCenter/View/20227 - accessed 2026-05-24 · curl · SHA-256 0c23a146...

Last verified

Verified Last reviewed 2026-11-04. Schema record at status verified with 4 of 5 fee families confirmed (impact_fees, zoning_fees, utility_tap_fees, proffers closed not-applicable) and special_district_fees closed not-administered after four official path probes.

Development fee schedules administered by the City of League City change over time. ZoneFee captured the schedules from the sources named above on the last-verified date. For binding fee amounts on a specific project, contact the City of League City Planning & Development Department directly via the official website.