Southlake, Texas - City Development Fees
Southlake | City | Tarrant County | Dallas-Fort Worth-Arlington MSA (Northeast Tarrant, SH-114 corridor near Grapevine Lake)
Southlake is a home-rule city in Tarrant County in the Dallas-Fort Worth-Arlington metroplex, between Grapevine Lake and State Highway 114 north of DFW International Airport and home to Southlake Town Square. Unlike many greenfield Houston-metro suburbs that are served by municipal utility districts, Southlake operates its own municipal water and wastewater utility, so it levies citywide Chapter 395 water, sewer, and roadway impact fees directly under Ordinance No. 657 / 0657C. The City publishes a consolidated 2026 Municipal Fee Schedule covering planning and development applications, building permits, and water and wastewater utility charges, and a separate Impact Fee Schedule for its Chapter 395 fees. The figures below are drawn from those two official documents. As noted in the coverage notes, the impact fee amounts apply to the current collection tier for plats filed after April 1, 2016, and Southlake's connection cost is a combination of impact fees, cost-plus tap charges, and meter charges. Verify current amounts with the City of Southlake before relying on them.
On this page
Fee Summary
| Fee Type | Status | Top-Line Figure | Effective Date |
|---|---|---|---|
| Impact Fees (water, sewer, and roadway; Chapter 395) | Confirmed | Water $2,815.28 (1") to $90,088.85 (8"); sewer $1,674.63 (1") to $53,588.30 (8"); roadway per single-family unit $2,292.00 (North) / $1,640.00 (South) | Impact Fee Schedule, tier for plats filed after 4/1/2016; Ord. 657 / 0657C |
| Zoning and Plat Application Fees (zoning, plat, and subdivision) | Confirmed | Zoning change $205.00 + $10/ac; zoning & site plan $405.00 + $20/ac; SUP $305.00; preliminary plat $305.00 + $20/lot | 2026 Municipal Fee Schedule |
| Utility Tap / Connection Fees (municipal water and sewer utility) | Confirmed | Water/sewer service tap actual cost + 15% admin; water meter (incl. transponder) $555.00 (1") to $10,775.00 (8"); Sewer Participation $1,300.00/lot | 2026 Municipal Fee Schedule |
| Special District Fees | Not administered | No PID or MUD assessment line appears as a City fee; district assessments are levied by the district | - |
| Proffers | Not applicable | Texas has no cash proffer regime; exactions run through TLGC Ch. 212 and Ch. 395 | - |
Impact Fees
Source: City of Southlake Impact Fee Schedule, governed by Ordinance No. 657 / 0657C. Southlake operates its own municipal water and wastewater utility and levies water, sewer, and roadway impact fees under Texas Local Government Code Chapter 395. The amounts below are the current collection tier, which applies to plats filed after April 1, 2016. Water and sewer impact fees scale by water meter size and living unit equivalent; roadway impact fees are charged by land-use type and by the North or South collection service area.
| Water Impact Fee (by meter size) | Amount |
|---|---|
| 1" meter | $2,815.28 |
| 2" (compound) | $9,008.89 |
| 4" (compound) | $28,152.78 |
| 6" (compound) | $56,305.29 |
| 8" (turbine) | $90,088.85 |
| Sewer Impact Fee (by meter size) | Amount |
|---|---|
| 1" meter | $1,674.63 |
| 2" | $5,358.83 |
| 4" | $16,746.35 |
| 6" | $33,492.69 |
| 8" | $53,588.30 |
| Roadway Impact Fee (representative land uses) | North Service Area | South Service Area |
|---|---|---|
| Single-family detached (per dwelling unit) | $2,292.00 | $1,640.00 |
| Apartment / multi-family (per dwelling unit) | $1,421.00 | $1,017.00 |
| General office building (per 1,000 sq ft gross floor area) | $2,424.00 | $1,734.00 |
The water and sewer impact fees are capital-recovery fees keyed to the water meter size and living unit equivalent; the ladders above show representative meter sizes. The roadway impact fee is assessed by land-use category from the full Institute of Transportation Engineers land-use table and varies by the North or South collection service area; the rows above are representative examples. These Chapter 395 impact fees are distinct from the utility's own meter and tap charges below.
Zoning and Plat Application Fees
Source: City of Southlake 2026 Municipal Fee Schedule, Planning and Development Services section. The zoning, specific use permit, variance, and plat application fees below are captured from that schedule.
| Application Type | Fee |
|---|---|
| Zoning - Only | $205.00 + $10.00 per acre |
| Zoning & Concept Plan | $405.00 + $20.00 per acre |
| Zoning & Site Plan | $405.00 + $20.00 per acre |
| Zoning - Amendment to Ordinance | $305.00 |
| Specific Use Permit (Residential Solar SUP $55.00) | $305.00 |
| Board of Adjustment Request | $305.00 |
| Comprehensive Plan Amendment | $305.00 |
| Concept Plan Only | $205.00 + $10.00 per acre |
| Site Plan | $305.00 + $10.00 per acre |
| Variance Requests (Planning, by ordinance type) | $100.00 to $500.00 |
| Preliminary Plat (residential) | $305.00 + $20.00 per lot |
| Final Plat (residential) | $405.00 + $30.00 per lot |
| Plat Vacation | $205.00 |
| Plat Showing (one lot) | $255.00 |
Authority: City of Southlake Planning & Development Services. The fees above confirm the zoning and platting fee family for this jurisdiction. Variance requests are priced by ordinance type (for example, masonry variance $100.00; lighting, sidewalk, or sign variance $300.00; master sign variance $500.00). A zoning verification letter is provided free the first time and $30.00 for each additional letter.
Water Tap and Utility Connection Fees
Source: City of Southlake 2026 Municipal Fee Schedule, Water and Wastewater Utility Services section. Southlake operates its own municipal water and wastewater utility. Water and sewer service taps are charged at actual cost plus a 15% administrative fee; the flat publishable charges the City levies are the meter charges by size, the Sewer Participation charge, and the Sewer Tap Inspection, shown below. These are separate from the Chapter 395 impact fees above.
| Connection | Fee |
|---|---|
| Water Service Tap - 1" / 2" | Actual cost + 15% admin fee |
| Sewer Service Tap - 4" | Actual cost + 15% admin fee |
| Sewer Tap Inspection | $80.00 |
| Sewer Participation | $1,300.00 per lot |
| Water Meter incl. transponder - 1" | $555.00 |
| Water Meter incl. transponder - 2" turbo (irrigation) | $955.00 |
| Water Meter incl. transponder - 2" compound | $2,205.00 |
| Water Meter incl. transponder - 4" | $5,000.00 |
| Water Meter incl. transponder - 6" | $7,605.00 |
| Water Meter incl. transponder - 8" | $10,775.00 |
| Meter Box - 1" and smaller (installed) / 2" (installed) | $100.00 / $250.00 |
Authority: City of Southlake Public Works (Water & Wastewater Utilities). Because the water and sewer service taps are cost-plus rather than a flat per-size tap fee, the one-time connection cost varies with meter size and field conditions. The capital cost of extending service is captured chiefly by the Chapter 395 water and sewer impact fees above; residential water deposits ($75.00) and non-residential deposits ($250.00 to $500.00) are refundable account deposits, not development fees. Monthly water and sewer service rates and volumetric charges are recurring billing charges, not development fees, and are excluded here.
Coverage Notes - What This Page Does Not Cover
Per ZoneFee's Partial-Verified Publication Standard, the items below were either not itemized in full on this page or are not administered by this jurisdiction. They are disclosed here rather than estimated, paraphrased from a non-official source, or omitted silently. These items remain under limited-coverage review until any remaining gaps are closed from official sources.
Currency caveat
The impact fees on this page derive from the City of Southlake Impact Fee Schedule (current tier for plats filed after April 1, 2016, under Ordinance No. 657 / 0657C), and the zoning, plat, and utility connection charges derive from the City of Southlake 2026 Municipal Fee Schedule. Fee schedules change. Confirm current amounts directly with the City of Southlake before relying on them.
Impact fee tier and roadway table scope
The water and sewer impact fee amounts on this page are the current collection tier, which applies to plats filed after April 1, 2016. The roadway impact fee is set by a full Institute of Transportation Engineers land-use table across two collection service areas (North and South); only representative land-use rows are shown above. Developers with a land use not listed, or a larger meter size, should request the applicable amounts directly from the City.
Utility connection scope
Because Southlake runs its own water and wastewater utility, the total cost of a new connection is a combination of the Chapter 395 water and sewer impact fees, the water and sewer service tap charges (actual cost plus 15% administrative fee), and the water meter charge for the applicable size. The water and sewer service taps are cost-plus rather than flat dollar lines; the flat meter, Sewer Participation, and Sewer Tap Inspection charges are presented above.
Special district fees
No public improvement district (Local Government Code Chapter 372) or municipal utility district (Water Code Chapter 54) assessment line appears anywhere on the City's 2026 Municipal Fee Schedule. Southlake's Community Enhancement and Development Corporation and Southlake Parks Development Corporation are sales-tax-funded development corporations, not a permit or impact fee family, and Southlake self-operates its water and wastewater utility rather than relying on a district. PID or MUD assessments, where they exist, are levied and collected by the district itself, not through a standardized City fee. Closed-search outcome: this fee family is not administered by this jurisdiction.
Proffers
Cash proffers are a Virginia statutory instrument under Virginia Code Section 15.2-2303.4 with no Texas counterpart. Texas exactions run through Local Government Code Chapter 212 (subdivision and development) and Chapter 395 (impact fees); Southlake's water, sewer, and roadway impact fees sit under Chapter 395. Closed-search outcome: this fee family does not apply to this jurisdiction.
Fee Authorities
| Authority | Fee Types | Official Website |
|---|---|---|
| City of Southlake Planning & Development Services / Building Inspections | Roadway impact fees; zoning, specific use permit, and site plan fees; plat and subdivision application fees | cityofsouthlake.com |
| City of Southlake Public Works (Water & Wastewater Utilities) | Water and sewer capital-recovery impact fees; water and sewer service taps, meter, and Sewer Participation charges | cityofsouthlake.com |
See the impact fees guide for how Texas Local Government Code Chapter 395 works, and the Texas hub for other jurisdictions covered by ZoneFee. Nearby covered jurisdictions include Grapevine, Keller, Flower Mound, North Richland Hills, and Coppell.
Sources
Last verified by ZoneFee: 2026-09-05. Fee schedules are subject to change. Verify current rates directly with the City of Southlake (Planning & Development Services and Public Works) before relying on this data for any financial decision.
This page reflects fee data sourced from the City of Southlake Impact Fee Schedule (Ordinance No. 657 / 0657C, current tier for plats filed after April 1, 2016) and the City of Southlake 2026 Municipal Fee Schedule. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. As noted above, the roadway impact fee is set by a full land-use table across two service areas and only representative rows are shown; Southlake's water and sewer connection cost is a combination of impact fees, cost-plus tap charges, and meter charges; Texas has no cash proffer regime; and no special-district fee is administered as a City fee. Verify all current rates directly with the City of Southlake before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.