Royse City, Texas - City Development Fees
Royse City | City | Rockwall County (extends into Hunt County) | Dallas-Fort Worth-Arlington MSA (I-30 corridor northeast)
Royse City is a fast-growing home-rule city on Interstate 30 in northeast Rockwall County, extending into Hunt County, east of Fate and Rockwall in the Dallas-Fort Worth metroplex. The City operates its own water and wastewater utility and administers roadway impact fees per service unit and water and wastewater impact fees per living-unit-equivalent under Texas Local Government Code Chapter 395; zoning, specific use permit, planned development, plat, and engineering-review application fees; and water meter set and water and sewer tap fees, all through its codified fee schedule in the Municode Code of Ordinances (code current through May 11, 2026). The figures below are drawn from that codified fee schedule. As noted in the coverage notes, the codified schedule is a portal-gated resource, so the currency caveat below applies. Verify current amounts with the City of Royse City before relying on them.
On this page
Fee Summary
| Fee Type | Status | Top-Line Figure | Effective Date |
|---|---|---|---|
| Impact Fees (roadway per service unit; water and wastewater per living-unit-equivalent) | Confirmed | Roadway assessment $4,017.22 to $5,506.95 per service unit (Service Areas 1 to 3, plats on or after 1/23/2024); roadway collection $1,000.00 per service unit residential; water and wastewater levied per living-unit-equivalent (amounts in the CIP) | Codified Municode (roadway per Ord. 24-01-1621, 1/23/2024; program Ord. 07-04-563) |
| Zoning and Plat Application Fees (zoning, SUP, PD, plat, site plan, engineering review) | Confirmed | Zoning change $750.00; SUP $750.00; PD $2,500.00 per base zone; preliminary/final plat $500.00 + $10.00 per lot | Codified Municode Art. 1.05 sec. 1.05.083 (current through 2026-05-11) |
| Utility Tap / Meter Fees (municipal water and wastewater utility) | Confirmed | Water meter set $150.00 (5/8") to $5,800.00 (6"); water/sewer tap actual cost + 5% or $35.00, whichever is less | Codified Municode Art. 1.05 sec. 1.05.062-063 (current through 2026-05-11) |
| Special District Fees | Not administered | No PID, MUD, or PUD special-district fee schedule appears in the code or on the city site | - |
| Proffers | Not applicable | Texas has no cash proffer regime; exactions run through TLGC Ch. 212 and Ch. 395 | - |
Impact Fees
Source: City of Royse City Code of Ordinances, Ch. 10 Subdivision, Art. 10.03 Impact Fees, Div. 2. Royse City operates its own water and wastewater utility and levies water, wastewater, and roadway impact fees under Texas Local Government Code Chapter 395. The roadway impact fee schedules were updated by Ordinance 24-01-1621 (adopted January 23, 2024); the program was adopted under Ordinance 07-04-563 (2007) with the land-use assumptions and capital improvements plan in Ordinance 07-03-562, and collection under Ordinance 21-05-1449 (2021).
| Impact Fee | Amount |
|---|---|
| Roadway impact fee - assessment rate, Service Area 1 (plats on or after 1/23/2024, per service unit) | $4,017.22 |
| Roadway impact fee - assessment rate, Service Area 2 | $5,506.95 |
| Roadway impact fee - assessment rate, Service Area 3 | $4,046.48 |
| Roadway impact fee - collection rate, Residential (per service unit) | $1,000.00 |
| Water impact fee (per living-unit-equivalent; 5/8" to 1" meter = 1 LUE) | Levied per service unit; per-meter dollar amounts set in the CIP attached to Ord. 07-03-562 (not tabulated in the code text) |
| Wastewater impact fee (per living-unit-equivalent) | Levied per service unit; per-meter dollar amounts set in the CIP attached to Ord. 07-03-562 (not tabulated in the code text) |
The roadway impact fee is fully tabulated in the code: the assessment rate (Schedule 1, sec. 10.03.051) applies to plats on or after January 23, 2024 at a per-service-unit rate that varies by service area (a service unit is one p.m. peak-hour vehicle trip), and the collection rate (Schedule 2, sec. 10.03.052) is $1,000.00 per service unit for residential, with nonresidential collection per Ordinance 24-01-1621. Water and wastewater impact fees are levied per living-unit-equivalent (a 5/8 inch to 1 inch meter equals one living-unit-equivalent), but the per-meter dollar amounts are set in the capital improvements plan attached to Ordinance 07-03-562 and are not tabulated inside the codified text; developers should request the current adopted water and wastewater impact-fee amounts directly from the City. These capital-recovery impact fees are distinct from the utility's own water meter set and tap charges below.
Zoning and Plat Application Fees
Source: City of Royse City Code of Ordinances, Art. 1.05 Finances, sec. 1.05.083 (planning and zoning fees) plus plat and engineering-review fees. The figures below are captured verbatim from the codified fee schedule.
| Application Type | Fee |
|---|---|
| Zoning change application | $750.00 |
| Specific use permit (SUP) | $750.00 |
| Planned development (PD) conceptual plan document review | $2,500.00 for each base zone in the PD |
| Detailed site plan review | $500.00 (under 5 acres); $500.00 + $25.00/acre (5 acres or more) |
| Variance / special exception (ZBA) | $500.00 |
| Preliminary plat | $500.00 + $10.00 per lot |
| Final plat | $500.00 + $10.00 per lot |
| Civil plan / engineering development review | $3,000.00 + $25.00 per acre disturbed (up to 3 reviews) |
Authority: City of Royse City Development Services. The codified schedule also carries related development charges, including a verification letter, plat application and master-plat fees, drainage-study and traffic-impact-analysis fees, and per-day construction inspection; confirm any that apply to your submittal directly with the City.
Water and Sewer Tap Fees
Source: City of Royse City Code of Ordinances, Art. 1.05 Finances, sec. 1.05.062-063 (water meter set and water and sewer fees). Royse City operates its own water and wastewater utility. These one-time water meter set and tap charges are the utility's own new-connection costs and are distinct from the impact fees above.
| Connection | Fee |
|---|---|
| Water meter set - 5/8" | $150.00 |
| Water meter set - 1" | $400.00 |
| Water meter set - 2" | $1,400.00 |
| Water meter set - 3" | $3,000.00 |
| Water meter set - 4" | $3,800.00 |
| Water meter set - 6" | $5,800.00 |
| Water/sewer tap (repair/replacement/installation) | Actual cost incurred by the city + 5% administrative fee, or $35.00, whichever is less |
Authority: City of Royse City Public Works Utility. These development-related connection charges are distinct from the City's monthly utility rate sheet, which carries recurring service rates and is not a development fee.
Coverage Notes - What This Page Does Not Cover
Per ZoneFee's Partial-Verified Publication Standard, the items below were either not itemized in full on this page or are not administered by this jurisdiction. They are disclosed here rather than estimated, paraphrased from a non-official source, or omitted silently. These items remain under limited-coverage review until any remaining gaps are closed from official sources.
Currency caveat
All three confirmed fee families derive from the codified fee schedule in the City's Municode Code of Ordinances, which is current through May 11, 2026. The Municode library is rendered dynamically and its content interface is session-gated, so the schedule is cited by its stable section identifiers rather than a fixed document snapshot. The amounts above were captured from that codified schedule; because a jurisdiction can amend its fee schedule between code consolidations, this page carries a standard currency caveat. Confirm the current amounts directly with the City before relying on them.
Water and wastewater impact fee - dollar schedule
Royse City levies water and wastewater impact fees per living-unit-equivalent under Texas Local Government Code Chapter 395, but the per-meter dollar amounts are set in the capital improvements plan attached to Ordinance 07-03-562 and are not tabulated inside the codified text. The roadway impact fee is presented above with its full tabulated per-service-unit schedule. Developers assessing a water or wastewater impact fee should request the current adopted per-meter amounts directly from the City.
Special district fees
No special-district (public improvement district, municipal utility district, or planned unit development) dollar fee schedule appears in the code or on the city site. In Texas, public improvement district formation costs under Local Government Code Chapter 372 and municipal utility district formation costs under Water Code Chapter 54 are recovered through the district itself or a negotiated development agreement, not through a standardized per-application city fee. Closed-search outcome: this fee family is not administered by this jurisdiction.
Proffers
Cash proffers are a Virginia statutory instrument under Virginia Code Section 15.2-2303.4 with no Texas counterpart. Texas exactions run through Local Government Code Chapter 212 (subdivision and development) and Chapter 395 (impact fees). Closed-search outcome: this fee family does not apply to this jurisdiction.
Fee Authorities
| Authority | Fee Types | Official Website |
|---|---|---|
| City of Royse City Development Services | Zoning, specific use permit, planned development, plat, site plan, and engineering-review application fees | roysecity.com |
| City of Royse City Public Works Utility | Water, wastewater, and roadway impact fees under Texas Local Government Code Chapter 395; water meter set and water and sewer tap fees | roysecity.com |
See also nearby Fate on the I-30 corridor in Rockwall County, and the impact fees guide for how Texas Local Government Code Chapter 395 works.
Sources
| Document | Agency | Accessed |
|---|---|---|
| Code of Ordinances, Art. 1.05 Finances (sec. 1.05.083 planning, zoning, and plat fees; sec. 1.05.062-063 water meter set and water and sewer tap fees) | City of Royse City (Municode) | 2026-08-11 |
| Code of Ordinances, Ch. 10 Subdivision, Art. 10.03 Impact Fees, Div. 2 (water, wastewater, and roadway impact fees; roadway update Ord. 24-01-1621) | City of Royse City (Municode) | 2026-08-11 |
Last verified by ZoneFee: 2026-08-11. Fee schedules are subject to change. Verify current rates directly with the City of Royse City (Development Services and Public Works Utility) before relying on this data for any financial decision.
This page reflects fee data sourced from the City of Royse City codified fee schedule in the Municode Code of Ordinances (current through May 11, 2026). ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. As noted above, the water and wastewater impact-fee per-meter dollar amounts are set in the capital improvements plan and are not tabulated in the codified text; Texas has no cash proffer regime; and no special-district fee appears in the schedule. Verify all current rates directly with the City of Royse City before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.