Skip to main content

Mansfield, Texas - City Development Fees

Mansfield | City | Dallas-Fort Worth Metroplex (southeast Tarrant County; US-287 / SH 360 corridor) | Dallas-Fort Worth-Arlington, TX MSA | Tarrant County (portions in Johnson and Ellis Counties)

Mansfield is a city in the southeast part of the Dallas-Fort Worth Metroplex, primarily in Tarrant County with portions in Johnson and Ellis Counties, on the US-287 and SH 360 corridor. The City adopts a consolidated Master Fee Schedule by ordinance, which carries the Planning - Development application fees and the Water Utilities tap and meter-set fees. The City's Texas Local Government Code Chapter 395 impact fees - water and wastewater impact fees and roadway impact fees - are adopted in separate ordinances and codified in Chapter 153 of the Code of Ordinances. This page captures the development-side families from those documents.

On this page
  1. Fee summary
  2. Zoning and development fees
  3. Impact fees
  4. Utility tap fees
  5. Coverage notes
  6. Fee authorities
  7. Sources

Fee Summary

Fee Type Status Top-Line Figure Effective Date
Zoning and Development Application Fees Confirmed Zoning change $1,000 + $100/acre ($7,500 max); specific use permit $2,500 + $100/acre; planned development $2,500 + $100/acre ($10,000 max); preliminary plat $500 + $35/acre 2024-10-01
Impact Fees (TLGC Ch. 395 water/sewer + roadway) Confirmed Water + sewer by meter size: 3/4" $6,500 total up to 8" $416,000; roadway $1,303.19 per vehicle-mile; single-family detached $4,900/dwelling unit 2025-10-01
Utility Tap / Connection Fees Confirmed Water tap $1,530 (3/4") up to $2,230 (2"); sewer tap $1,270; water meter set $320 (3/4") up to $700 (2") 2024-10-01
Cash Proffers Does not apply Cash proffers are a Virginia statutory framework only; Texas jurisdictions do not use them -
Special District Fees (PID / TIRZ / MUD) Not administered by this jurisdiction TIRZ districts are tax-increment financing on the tax roll; the Master Fee Schedule and impact fee schedules contain no PID or MUD developer fee entries -

Zoning and Development Application Fees

Source: City of Mansfield Master Fee Schedule, Planning - Development section, effective October 1, 2024 (Ordinance No. OR-2379-24; SHA-256 84c15bb5...). Several fee types are tiered by acreage with a stated maximum.

Zoning, Specific Use Permits, and Planned Development

Fee ItemAmount
Zoning Change Request - PR, A, SF Districts$250 (max) for two or fewer principal dwellings; $500 (max) for three or more
Zoning Change Request - 2F, MF, O-P, C-1, C-2, C-3, I-1, I-2, S Districts$1,000 + $100 per acre or portion ($7,500 max)
Zoning Change Request - D District (detached single-family only)$250 / $500 (max)
Zoning Change Request - D District (all other permitted uses)$1,000 + $100 per acre or portion ($7,500 max)
Specific Use Permit Request$2,500 + $100 per acre or portion ($7,500 max)
Specific Use Permit - Gas Well Drilling and Production$5,000
Planned Development (PD) District Request$2,500 + $100 per acre or portion ($10,000 max)
Concept Plan$2,500
Detailed Site Plan Review$2,500
Site Plan or Building Plan Review$2,500
Board of Adjustment Appeal$250

Plats and Administrative

Fee ItemAmount
Preliminary Plat$500 + $35 per acre or portion
Final Plat$500 + $35 per acre or portion
Replat$400 + $35 per acre or portion
Amending Plat$300 + $35 per acre or portion
Plat Vacation$300
Easement or Right-of-Way (ROW) Abandonment$200
Rescheduling Fee (postponed public-hearing cases)$300
Mansfield 2040 Plan Future Land Use Map Amendment$250
Zoning Verification Letter$50

Impact Fees - Water, Sewer, and Roadway

Source: City of Mansfield Water and Sewer Impact Fees (Ordinance No. OR-2385-24, updated September 23, 2024; SHA-256 47b2f0bf...) and Roadway Impact Fees FY2026 (effective October 1, 2025; SHA-256 18afe4fa...). Under Texas Local Government Code Chapter 395, the City assesses water and wastewater impact fees by meter size and roadway impact fees per vehicle-mile by ITE land-use category, codified in Chapter 153 of the Code of Ordinances.

Water and Sewer Impact Fees (by meter size)

Meter Size Water Sewer Total
3/4"$3,500$3,000$6,500
1"$5,600$4,800$10,400
1.5"$7,000$6,000$13,000
2"$14,000$12,000$26,000
3"$44,800$38,400$83,200
4"$70,000$60,000$130,000
6"$140,000$120,000$260,000
8"$224,000$192,000$416,000

Roadway Impact Fees (FY2026, effective October 1, 2025)

The collected roadway impact fee is applied uniformly across Service Areas A through D at a collection rate of $1,303.19 per service unit (per vehicle-mile). Representative land-use categories are shown below; the full schedule covers all ITE land-use categories.

Land Use CategoryCollected Fee
Collected rate per service unit (per vehicle-mile)$1,303.19
Single Family Detached Housing (per dwelling unit)$4,900
Single Family Attached Housing (per dwelling unit)$2,971
Multifamily Housing, Low-Rise (per dwelling unit)$2,659
Multifamily Housing, Mid-Rise (per dwelling unit)$2,033
General Office Building (per 1,000 SF GFA)$3,753
General Light Industrial (per 1,000 SF GFA)$3,388
Warehousing (per 1,000 SF GFA)$938
Hotel (per room)$1,362

Water and Sewer Tap and Meter-Set Fees

Source: City of Mansfield Master Fee Schedule, Water Utilities section, effective October 1, 2024 (Ordinance No. OR-2379-24; SHA-256 84c15bb5...). These are the physical connection and meter-set charges. The larger development-side water and wastewater capacity charge flows through the impact fees in the section above. Water and sewer consumption rates are set in a separate ordinance and are outside the developer-side scope of this page.

Fee ItemAmount
Water Tap Fee - 3/4"$1,530
Water Tap Fee - 1"$1,670
Water Tap Fee - 1.5"$2,075
Water Tap Fee - 2"$2,230 (all taps over 2" calculated individually)
Sewer Tap Fee$1,270
Water Meter Set Fee - 3/4" / 1" / 1.5" / 2"$320 / $360 / $530 / $700
Water Service Bullhead - 3/4" / 1" / 2"$450 / $560 / $700
Move Service - 3/4" / 1"$725 / $760
Reduce Meters - Residential / Builders$320 / $360
Reduce 2" Service to 3/4" / to 1"$530 / $700
Inspect Sewer Lateral$50
Construction Meter Deposit$800

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were not closed via confirmed fee amounts on this page. They are disclosed here rather than estimated or omitted silently.

Cash Proffers

Cash proffers are a Virginia statutory framework only (Va. Code 15.2-2303 and 15.2-2303.4); Texas jurisdictions do not use cash proffers. Developer-side contributions in Mansfield occur through zoning, planned development, and plat application fees, the water and wastewater and roadway impact fees, and utility tap fees. Closed-search outcome: fee family does not apply.

Special District Fees (PID / TIRZ / MUD)

The City of Mansfield maintains Tax Increment Reinvestment Zones, but a TIRZ is a tax-increment financing mechanism administered through the tax roll, not a developer-facing special-district application or assessment fee. The Master Fee Schedule (Ordinance No. OR-2379-24) and the impact fee schedules contain no Public Improvement District (PID) or Municipal Utility District (MUD) developer fee entries. Closed-search outcome: not administered by this jurisdiction.

Fee Authorities

Authority Fee Types Official Website
City of Mansfield (Planning - Development / Planning - Building Safety / Engineering Services / Water Utilities; impact fees adopted by City Council in separate ordinances) Zoning change and planned development; specific use permits; concept and site plans; plats; board of adjustment appeals; water and sewer tap and meter-set fees; water and wastewater impact fees; roadway impact fees mansfieldtexas.gov

Sources

Document Agency Accessed
Master Fee Schedule FY 24-25, Effective October 1, 2024 (Ordinance No. OR-2379-24; SHA-256 84c15bb5...) City of Mansfield, TX - Planning - Development and Water Utilities 2026-06-07
Water and Sewer Impact Fees, updated September 23, 2024 (Ordinance No. OR-2385-24; SHA-256 47b2f0bf...) City of Mansfield, TX - Engineering Services 2026-06-07
Roadway Impact Fees FY2026, Effective October 1, 2025 (SHA-256 18afe4fa...) City of Mansfield, TX - Engineering Services 2026-06-07

Last verified by ZoneFee: 2026-06-07. Fee schedules are subject to change. Verify current rates directly with the City of Mansfield before relying on this data for any financial decision.

This page reflects fee data sourced from the City of Mansfield Master Fee Schedule (Ordinance No. OR-2379-24, effective October 1, 2024; SHA-256 84c15bb5...), the Water and Sewer Impact Fees (Ordinance No. OR-2385-24, updated September 23, 2024; SHA-256 47b2f0bf...), and the Roadway Impact Fees FY2026 schedule (effective October 1, 2025; SHA-256 18afe4fa...). ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. The water, sewer, and roadway impact fees are assessed by meter size or by land-use category, and the amount assessed on a specific project depends on its meter size, service area, and land use. Texas jurisdictions do not use cash proffers, and the City's schedules administer no PID, TIRZ, or MUD developer-facing application fee. Verify all current rates directly with the City of Mansfield before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.