Skip to main content

Manvel, Texas - City Development Fees

City of Manvel | Brazoria County | Houston-Gulf Coast | SH-6 south of Houston and Pearland

Manvel is a home-rule city in northern Brazoria County on SH-6 south of Houston and Pearland. The City administers its own water and sewer connections, has adopted Texas Local Government Code Chapter 395 water and wastewater impact fees, and runs its own zoning, platting and engineering review. The fees below are captured from the City fee schedule adopted by Resolution No. 2026-R-44 on September 21, 2026, including the impact fees adopted by Ordinance 2026-O-22 the same day. Verify current amounts with the City of Manvel before relying on them.

On this page
  1. Fee summary
  2. Impact fees
  3. Zoning and plat fees
  4. Utility tap fees
  5. Coverage notes
  6. Fee authorities
  7. Sources

Fee Summary

Fee TypeStatusTop-Line FigureEffective / Source
Impact Fees (TLGC Ch. 395 - water, wastewater)Confirmed$25,395 total per 3/4" meter ($5,458 water + $19,937 wastewater) to $5,500,556 per 10" meterOrd. 2026-O-22, adopted 2026-09-21
Zoning, Plat and Site Plan FeesConfirmedRe-zoning $1,800.00; SUP $1,500.00; preliminary or final plat $750.00 + per-lot and reserve-acre feesRes. 2026-R-44, 2026-09-21
Utility Tap / Connection Fees (water, sewer)ConfirmedWater connection $550 (3/4") or $750 (over 3/4"); sewer connection $750; each plus 1/2 cost of any required boreRes. 2026-R-44, 2026-09-21
Special District Fees (PID / MUD)Unavailable via official sourcesNo PID, MUD or TIRZ assessment schedule on the City domain-
ProffersNot applicableTexas has no cash proffer regime; exactions run through TLGC Ch. 212 and Ch. 395-

Impact Fees

Source: City of Manvel fee schedule adopted by Resolution No. 2026-R-44 (Exhibit A, page 3), under the heading "Impact Fees: (Adopted by Ordinance 2026-O-22 on 9/21/2026)". The City Adopted Development Plans page states that the 2026 Water and Wastewater Impact Fee Update was adopted by City Council on September 21, 2026 by Ordinance 2026-O-22. The table is headed "2026 Amended Impact Fees" and prints no separate collection-rate column; the amounts below are the adopted per-meter amounts.

Meter SizeEquivalent Single Family ConnectionsWaterWastewaterTotal
3/4"1$5,458$19,937$25,395
1"1.6$8,732$31,899$40,631
1-1/2"3.3$18,011$65,792$83,803
2"5.3$28,927$105,666$134,593
3"16.6$90,602$330,954$421,556
4"41.6$227,052$829,379$1,056,431
6"66.6$363,502$1,327,804$1,691,306
8"133.3$727,551$2,657,602$3,385,153
10"216.6$1,182,202$4,318,354$5,500,556

Equivalent single family connections are rounded down to the nearest single decimal point. No roadway impact fee appears in the schedule.

Zoning and Plat Fees

Source: Exhibit A "City of Manvel Fee Schedule September 21, 2026, Resolution 2026-R-44", Zoning, Plats and Engineering (pages 1-2). Resolution No. 2026-R-44 was resolved on September 21, 2026 and repeals conflicting fee resolutions.

ApplicationFee
Re-zoning application$1,800.00
Specific use permit$1,500.00
Appeal to the Zoning Board of Adjustments$750.00
Interpretation from zoning official$50.00
Occupancy permit, non-residential change of use or tenancy$150.00

Planned unit development (PUD)

PUD ItemFee
Public notice fee$150.00
Small PUD$4,000.00
Medium PUD$4,000.00 plus $40.00/acre
Large PUD (less than 1,000 acres)$10,000.00 plus $30.00/acre
Large PUD (greater than 1,000 acres)$20,000.00 plus $20.00/acre
PUD amendment$500.00

Plats

Plat ItemFee
Preliminary plat$750.00 + $10/lot and $15/acre or fraction in reserves
Final plat$750.00 + $25/lot and $15/acre or fraction in reserves
Master plan, 50 to 100 acres$1,000.00
Master plan, 101 acres or more$2,000.00
Development plat$750.00 plus $15/acre
Minor plat or amending plat$500.00
Plat re-submittal$200.00 each
Plat extension (6 months)No charge
Recording with Brazoria CountyActual cost of recording plus $30.00
Replat with public hearing, with notification$75.00 advertising fee + $1.00 per mailing notification
Replat with public hearing, without notification$75.00
Variance to the subdivision ordinance$500.00
Modification to the Design Criteria Manual$200.00

"Certain Manvel Residents" - individuals seeking construction of a single-family residence they intend to occupy, under Ordinance No. 2023-O-05 Proposition B - pay $0.00 for preliminary, final, development, minor and amending plats, replats with a public hearing, plat re-submittals, subdivision variances, Design Criteria Manual modifications and Zoning Board of Adjustments appeals.

Engineering review

ItemFee
Plan review - streets, utilities, public systems$500.00 base plus $50.00 per document page larger than legal size
Resubmittals after second submittal$250.00 base plus $10.00 per document page
Civil site improvements, projects up to $100,000.00$1,000.00 flat
Civil site improvements, over $100,000.00$1,000.00 plus $8.00 per thousand over $100,000.00
Re-check fee or verification of corrections$250.00

Utility Tap Fees

Source: Exhibit C "Utility Fees - September 21, 2026", Tap and Inspection Fees (Sec. 71-2) and Security Deposits (Sec. 71-12), adopted with Resolution No. 2026-R-44. The City administers water and sewer connections directly.

ConnectionFee
Water connection, single-family residential, 3/4"$550 plus 1/2 cost of any required bore
Water connection, single-family residential, over 3/4"$750 plus 1/2 cost of any required bore
Sewer connection, single-family residential$750 plus 1/2 cost of any required bore
Sewer connection, multi-family residential and non-residentialBased on the individual needs of the facility per engineering requirements
Builder deposit$500 at the time a request for each initial water tap is made

Construction meters and inspections

ItemFee
Temporary construction meter - installation$100
Temporary construction meter - deposit$1,400
Temporary construction meter - location change$50.00 per occurrence
Bulk water$100 monthly meter charge + $30 per 1,000 gallons
Pre-facility inspection (reinspection)$25 ($25)
Grease trap inspection (reinspection)$35 ($40)
Final plumbing inspection, single-family residential$50
Customer service inspection, single-family residential$100
Backflow testing and certification$75

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were either not published by this jurisdiction as a dated fee schedule, not administered by it, or do not apply. They are disclosed here rather than estimated, paraphrased from a non-official source, or omitted silently. These items remain under limited-coverage review until any remaining gaps are closed from official sources.

Special district fees

No public improvement district (PID), MUD or TIRZ assessment schedule was found on the City domain: the Resolution 2026-R-44 fee schedule has no special-district lines, and City site searches for "municipal utility district" and "public improvement district" returned no matching content. Subdivisions in the Manvel area may be served by MUDs whose own boards set rates; none were captured from an official source. Closed-search outcome: unavailable via official sources.

Building permit and septic fees

Building construction permit fees and onsite septic system permits also appear in the schedule. Building trade permit fees are outside the scope of this page.

Proffers

Cash proffers are a Virginia statutory instrument under Virginia Code Section 15.2-2303.4 with no Texas counterpart. Texas exactions run through Local Government Code Chapter 212 (subdivision and development) and Chapter 395 (impact fees). Closed-search outcome: this fee family does not apply to this jurisdiction.

Fee Authorities

AuthorityFee TypesOfficial Website
City of Manvel Development Services (Planning, Engineering, Building and Inspections) / Utility BillingZoning, PUD, plat and engineering review fees; water and sewer connections; water and wastewater impact feescityofmanvel.com

See the impact fees guide for how Texas Local Government Code Chapter 395 works, and the Texas hub for other jurisdictions covered by ZoneFee. Nearby covered jurisdictions include Pearland, Iowa Colony, Angleton and Friendswood.

Sources

Last verified by ZoneFee: 2026-10-18. Fee schedules are subject to change. Verify current rates directly with the City of Manvel before relying on this data for any financial decision.

This page reflects fee data sourced from the City of Manvel fee schedule adopted by Resolution No. 2026-R-44 on September 21, 2026, including the water and wastewater impact fees adopted by Ordinance 2026-O-22 the same day. The source is a scanned document; amounts were read from the scan and re-checked against it. As noted above, no special-district fee schedule was found on the City domain, and Texas has no cash proffer regime. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. Verify all current rates directly with the City of Manvel before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.