Gatesville, Texas - City Development Fees

City of Gatesville | Coryell County seat | Central Texas | US 84 / SH 36 west of Waco

Gatesville is the county seat of Coryell County in Central Texas, on US 84 and SH 36 west of Waco and north of Fort Cavazos. The City operates its own water and sewer utility and sets tap, front-foot connection, and main-extension charges. The fees below are captured from the City of Gatesville Fee Schedule booklet, which is printed "Effective October 1, 2026" and cites Code of Ordinances Chapter 18 as amended by Ordinances 2025-17, 2025-20, 2025-24, 2026-09, and 2026-17. Verify current amounts with the City of Gatesville before relying on them.

On this page
  1. Fee summary
  2. Zoning and plat fees
  3. Utility tap fees
  4. Coverage notes
  5. Fee authorities
  6. Sources

Fee Summary

Fee TypeStatusTop-Line FigureEffective / Source
Zoning and Plat Fees (platting, zoning change, SUP, variance)ConfirmedPlat $250.00 + $5.00/lot; zoning change $250.00Fee Schedule, effective 2026-10-01
Utility Tap / Connection Fees (water and sewer taps, front-foot and main extension)Confirmed3/4" water tap $1,546.25; sewer tap minimum $1,767.00 + front footageFee Schedule, effective 2026-10-01
Impact Fees (TLGC Ch. 395)Unavailable via official sourcesNo impact fee line in the City Fee Schedule-
Special District Fees (PID / MUD)Unavailable via official sourcesNo special-district fee found in City sources-
ProffersNot applicableTexas has no cash proffer regime; exactions run through TLGC Ch. 212 and Ch. 395-

Zoning and Plat Fees

Source: City of Gatesville Fee Schedule, "Planning & Development," effective October 1, 2026 (Code of Ordinances Chapter 18 as amended by Ordinances 2025-17, 2025-20, 2025-24, 2026-09, and 2026-17).

Application TypeFee
Platting (preliminary, final, amendment, minor, replat)$250.00 per plat + $5.00 per lot
Zoning change application$250.00
Specific use permit application$250.00
Variance application$250.00
Annexation$250.00
Rights-of-way / road / alley abandonment$250.00
Zoning verification letter$25.00
Third party reviewActual cost

Building and trade permit fees in the same booklet are construction-permit charges and are not covered here.

Utility Tap Fees

Source: City of Gatesville Fee Schedule, "Utilities - Tap and connection charges" and front-foot connection and main extension rates, effective October 1, 2026.

Water connections or taps

The schedule prints four separate columns for each meter size. It does not state which columns apply together, so they are shown as published and are not added into a total.

Meter SizeTapMeter/BoxMeterPer Foot Charge
3/4" meter$1,546.25$433.00$398.00$31.90
1" meter$1,671.85$545.00$510.00$32.20
1 1/2" meter$2,207.20$1,084.00$1,014.00$33.90
2" meter$2,315.60$1,270.00$1,200.00$34.75

The standard tap fee covers up to 40 feet. If the tap requires more than 40 feet of material, the customer is charged for each additional foot.

Sewer connections or taps

ItemFee
Sewer connection tap (4" taps only)Minimum charge of $1,767.00, plus front footage
Per foot charge$43.20

A sewer tap includes the cost of tapping, sewer pipe, wyes, and other materials needed to extend service to the nearest property or easement line, and street repair whenever required. The additional cost of larger taps is paid by the customer. For sewers in business areas or deep-cut connections, cost estimates are furnished on request and must be deposited with the City before work is done.

Connection to City-installed lines and main extensions

ItemWaterSewer
Connection to City-installed line - 12" main$49.60 / front foot$28.40 / front foot
Connection to City-installed line - 10" main$35.30 / front foot$19.65 / front foot
Connection to City-installed line - 8" main$22.80 / front foot$17.10 / front foot
Connection to City-installed line - minimum 6" main$16.20 / front foot$12.00 / front foot
Main extension to the applicant's property line plus right-of-way length - 8" PVC$100.00 / linear footFee determined upon request
Main extension to the applicant's property line plus right-of-way length - 6" PVC$80.00 / linear footFee determined upon request

If the water line is larger than an 8-inch main, the extension fee is determined on request. Monthly water and sewer rates in the same booklet are not development fees and are not covered here.

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were either not published by this jurisdiction as a dated fee schedule, not administered by it, or do not apply. They are disclosed here rather than estimated, paraphrased from a non-official source, or omitted silently. These items remain under limited-coverage review until any remaining gaps are closed from official sources.

Impact fees

The consolidated 17-page Fee Schedule (all City fees, Chapter 18) contains no impact fee line, and the City sitemap has no impact fee page. The development-scaled water and sewer charges the City does publish are the tap, front-foot connection, and main extension fees shown above. No adopted Texas Local Government Code Chapter 395 impact fee schedule was found. Closed-search outcome: unavailable via official sources.

Special district fees

The Fee Schedule contains no public improvement district (PID), municipal utility district (MUD), or other special-district fee, and no such page appears in the City sitemap or Development Services pages. Closed-search outcome: unavailable via official sources.

Proffers

Cash proffers are a Virginia statutory instrument under Virginia Code Section 15.2-2303.4 with no Texas counterpart. Texas exactions run through Local Government Code Chapter 212 (subdivision and development) and Chapter 395 (impact fees). Closed-search outcome: this fee family does not apply to this jurisdiction.

Fee Authorities

AuthorityFee TypesOfficial Website
City of Gatesville Development ServicesPlatting, zoning change, specific use permit, and variance feesgatesvilletx.com
City of Gatesville Finance / Utility BillingWater and sewer taps, front-foot connection, and main extension chargesgatesvilletx.com

See the impact fees guide for how Texas Local Government Code Chapter 395 works, and the Texas hub for other jurisdictions covered by ZoneFee. Nearby covered Central Texas jurisdictions include Copperas Cove, Killeen, and Waco.

Sources

Last verified by ZoneFee: 2026-10-07. Fee schedules are subject to change. Verify current rates directly with the City of Gatesville (Development Services / Finance) before relying on this data for any financial decision.

This page reflects fee data sourced from the City of Gatesville Fee Schedule, effective October 1, 2026. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change, and the City amends Chapter 18 by ordinance. As noted above, the City publishes no impact fee schedule, no special-district fee was found in City sources, and Texas has no cash proffer regime. Verify all current rates directly with the City of Gatesville before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.