Krum is a growing city in west-central Denton County on FM 156 northwest of Denton, in the Dallas-Fort Worth metro area. The City runs its own water and wastewater taps, has adopted Texas Local Government Code Chapter 395 water and wastewater impact fees, and sets its zoning, platting and engineering review fees in its Code of Ordinances. The fees below are captured from Appendix A of the Krum Code of Ordinances as codified on eCode360 (code version dated September 8, 2026), which the City links from its website. The City also posts a fee schedule on Google Drive that predates Ordinance 2026-895; this page cites the codified amounts. Verify current amounts with the City of Krum before relying on them.
On this page
Fee Summary
| Fee Type | Status | Top-Line Figure | Effective / Source |
|---|---|---|---|
| Impact Fees (TLGC Ch. 395 - water, wastewater) | Confirmed | Schedule C (platted on or after 2023-12-04): $3,308 water + $5,446 wastewater per 5/8" x 3/4" meter, up to $846,535 + $1,352,455 per 10" meter | App. A Sec. A11.015, last amended Ord. 2024-816 (2024-06-03) |
| Zoning, Plat and Engineering Review Fees | Confirmed | Rezoning $400.00 + $20.00/acre; SUP $500.00 + $10.00/acre; final plat $600.00 + $10.00/lot (single/two-family) | App. A Secs. A12.001-A12.006 (code version 2026-09-08) |
| Utility Tap / Connection Fees (water, sewer) | Confirmed | Water tap $1,242.00 (3/4") or $1,552.50 (1"); sewer tap $3,622.50 (4") or $4,657.50 (6"); plus road bore | App. A Secs. A11.003-A11.006, Ord. 2026-895 (2026-09-08) |
| Special District Fees (PID / MUD / TIRZ) | Unavailable via official sources | No special district development fee in any article of Appendix A | - |
| Proffers | Not applicable | Texas has no cash proffer regime; exactions run through TLGC Ch. 212 and Ch. 395 | - |
Impact Fees
Source: Krum Code of Ordinances Appendix A, Article A11.000 Utility Fees, Sec. A11.015 (Ordinance 2022-747 adopted September 6, 2022; Ordinance 2023-793 adopted December 4, 2023; Ordinance 2024-816 adopted June 3, 2024). The fee that applies depends on when the land was platted: Schedule A covers land platted April 2, 2018 through September 6, 2022, Schedule B covers September 7, 2022 through December 3, 2023, and Schedule C covers land platted on or after December 4, 2023. Unplatted land that is not required to plat uses Schedule C. Impact fees are assessed at final plat recordation and collected at building permit, or at a new connection or meter upsizing.
Water impact fees (Sec. A11.015(a))
| Meter Size | Schedule A | Schedule B | Schedule C |
|---|---|---|---|
| 5/8" x 3/4" | $2,532 | $3,308 | $3,308 |
| 3/4" | $4,219 | $5,513 | $6,683 |
| 1" | $6,751 | $8,821 | $11,160 |
| 1-1/2" | $8,439 | $11,026 | $22,254 |
| 2" | $16,878 | $22,052 | $35,620 |
| 3" | $59,072 | $77,182 | $77,990 |
| 4" | $101,267 | $132,312 | $133,660 |
| 6" | $210,973 | $275,650 | $311,895 |
| 8" | - | - | $534,640 |
| 10" | - | - | $846,535 |
Wastewater impact fees (Sec. A11.015(b))
| Meter Size | Schedule A | Schedule B | Schedule C |
|---|---|---|---|
| 5/8" x 3/4" | $4,168 | $5,446 | $5,446 |
| 3/4" | $6,751 | $9,077 | $10,677 |
| 1" | $11,115 | $14,523 | $17,830 |
| 1-1/2" | $13,894 | $18,154 | $35,554 |
| 2" | $27,789 | $36,308 | $56,908 |
| 3" | $97,261 | $127,078 | $124,600 |
| 4" | $166,733 | $217,848 | $213,540 |
| 6" | $347,361 | $453,850 | $498,295 |
| 8" | - | - | $854,160 |
| 10" | - | - | $1,352,455 |
Schedules A and B print no 8-inch or 10-inch amounts.
City of Denton pass-through wastewater impact fee (Sec. A11.016)
Where sewer flows to the City of Denton basin, Sec. A11.016 (Ordinance 2018-05-03 adopted May 7, 2018) adds a pass-through fee equal to the City of Denton equivalent impact fee plus a 10% Krum administrative fee, not less than $3,500.00, in addition to the Krum wastewater impact and tap fees. The Denton amount itself is not stated here.
Park development fee (Sec. A12.005)
Appendix A also lists a park development fee with the subdivision fees (Ordinance 2023-770 adopted May 17, 2023): $2,262.00 per single-family or two-family dwelling unit ($78,000 per acre x 0.029 acre) and $1,716.00 per multifamily dwelling unit ($78,000 per acre x 0.022 acre). It is a per-unit capital charge, not a Chapter 395 impact fee.
Zoning, Plat and Engineering Review Fees
Source: Krum Code of Ordinances Appendix A, Article A12.000. Sec. A12.001 was last amended by Ordinance 2025-871 adopted December 1, 2025, and Sec. A12.002 by Ordinance 2025-860 adopted September 2, 2025. The early warning siren fee in Sec. A12.006 was last amended by Ordinance 2026-895 adopted September 8, 2026.
Zoning and development applications (Sec. A12.001)
| Application | Fee |
|---|---|
| Rezoning, non-planned development | $400.00 + $20.00 per acre |
| Rezoning, planned development | $600.00 + $30.00 per acre |
| Specific use permit | $500.00 + $10.00 per acre |
| Concept plan | $400.00 + $10.00 per acre |
| Site plan | $700.00 + $20.00 per acre |
| Variance (zoning issue / Zoning Board of Adjustment) | $300.00 |
| Appeal, variance or exception (non-zoning) | $200.00 |
| Developer agreement | $1,000.00 + actual contractor review costs |
| Development Review Committee, from the third meeting | $400.00 per meeting |
Platting (Sec. A12.002)
| Plat Type | Single-Family / Two-Family | Multifamily / Nonresidential |
|---|---|---|
| Preliminary plat | $500.00 + $5.00 per lot | $500.00 + $20.00 per acre |
| Final plat | $600.00 + $10.00 per lot | $600.00 + $20.00 per acre |
| Replat | $350.00 + $10.00 per lot | $350.00 + $20.00 per acre |
| Amended plat | $250.00 + $10.00 per lot | $250.00 + $10.00 per acre |
| Minor / short form plat | $350.00 + $10.00 per lot | $350.00 + $10.00 per acre |
| Plat vacation | $350.00 each + engineer fee | $350.00 each + engineer fee |
A plat filing fee of $125.00 plus the county filing fee also applies.
Engineering plan review (Sec. A12.003)
| Review | Fee |
|---|---|
| Preliminary / final plat, residential 0-4 lots | $2,000 |
| Preliminary / final plat, residential 5-50 lots | $3,000 |
| Preliminary / final plat, residential 51-100 lots | $3,250 |
| Preliminary / final plat, residential 101-200 lots | $3,500 |
| Preliminary / final plat, residential 201 or more lots | $3,750 |
| Preliminary / final plat, commercial 0-5 lots | $2,500 |
| Preliminary / final plat, commercial 6-10 lots | $2,750 |
| Preliminary / final plat, commercial 11-15 lots | $3,000 |
| Preliminary / final plat, commercial 16 or more lots | $3,250 |
| Replat, amended, minor or vacation plat, residential | $1,250 (0-4 lots) up to $2,750 (201 or more lots) |
| Replat, amended, minor or vacation plat, commercial | $1,500 (0-5 lots) up to $2,250 (16 or more lots) |
| Third and later reviews | $1,500 |
| Construction plans | $375 per page |
| Engineering inspection | 5% of public works infrastructure construction value |
Miscellaneous (Secs. A12.004 and A12.006)
| Item | Fee |
|---|---|
| Annexation | $500.00 |
| Easement / right-of-way dedication | $300.00 |
| Easement / right-of-way abandonment | $300.00 |
| Street name change | $750.00 |
| Zoning verification letter | $50.00 |
| Early warning siren fee (paid at final plat or replat, city and ETJ) | $25.00 per platted lot |
Utility Tap Fees
Source: Krum Code of Ordinances Appendix A, Article A11.000, Secs. A11.003-A11.006 (Ordinance 2022-744 adopted September 6, 2022; Ordinance 2026-895 adopted September 8, 2026). Tap fees are one-time connection charges, separate from impact fees. Where a developer or contractor installs the taps, meter installation fees apply instead of water tap fees, and sewer connections pay $207.00 each.
| Connection | Fee |
|---|---|
| 3/4" water service tap | $1,242.00 + cost of road bore |
| 1" water service tap | $1,552.50 + cost of road bore |
| Water tap larger than 1" | Actual cost to the City + 5% |
| 4" sewer service tap | $3,622.50 + cost of road bore or manhole coring |
| 6" sewer service tap | $4,657.50 + road bore or manhole coring |
| Sewer tap larger than 6" | Actual cost + 5% |
| 3/4" water meter installation (tap fees not collected during construction) | $1,035.00 |
| 1" water meter installation | $1,242.00 |
| 2" water meter installation | $2,151.75 |
| Water meter installation larger than 2" | Actual cost + 20% |
| New sewer service fee (tap fees not collected during construction) | $207.00 per connection |
Coverage Notes - What This Page Does Not Cover
Per ZoneFee's Partial-Verified Publication Standard, the items below were either not published by this jurisdiction as a dated fee schedule, not administered by it, or do not apply. They are disclosed here rather than estimated, paraphrased from a non-official source, or omitted silently. These items remain under limited-coverage review until any remaining gaps are closed from official sources.
Special district fees
No PID, MUD, TIRZ or other special district development fee appears in any article of the codified Appendix A, the Drive-hosted fee schedule or the City website. Appendix A lists a North Texas Groundwater Conservation District pass-through on water usage rates, which is a usage charge, not a development fee. Closed-search outcome: unavailable via official sources.
City of Denton pass-through amount
The Sec. A11.016 pass-through is tied to the City of Denton wastewater impact fee, which is not captured on this page.
Building permit fees
Building and trade permit fees also appear in Appendix A. Building trade permit fees are outside the scope of this page.
Proffers
Cash proffers are a Virginia statutory instrument under Virginia Code Section 15.2-2303.4 with no Texas counterpart. Texas exactions run through Local Government Code Chapter 212 (subdivision and development) and Chapter 395 (impact fees). Closed-search outcome: this fee family does not apply to this jurisdiction.
Fee Authorities
| Authority | Fee Types | Official Website |
|---|---|---|
| City of Krum - Development Services and Public Works (Code of Ordinances Appendix A) | Water and wastewater impact fees; park development fee; rezoning, SUP, site plan, plat and engineering review fees; water and sewer taps and meter installation | cityofkrum.com |
See the impact fees guide for how Texas Local Government Code Chapter 395 works, and the Texas hub for other jurisdictions covered by ZoneFee. Nearby covered jurisdictions include Denton, Sanger, Justin, Aubrey and Corinth.
Sources
| Document | Agency | Accessed |
|---|---|---|
| Code of Ordinances Appendix A, Article A11.000 Utility Fees (eCode360; code version dated September 8, 2026; body text captured) - SHA-256 bab6de64… | City of Krum (eCode360) | 2026-10-24 |
| Code of Ordinances Appendix A, Article A12.000 Subdivision and Zoning Fees (eCode360; body text captured) - SHA-256 83c0c4e3… | City of Krum (eCode360) | 2026-10-24 |
| City fee schedule posted on Google Drive and linked from the Development Services page (predates Ordinance 2026-895; amounts not cited) - SHA-256 9a7a4706… | City of Krum | 2026-10-07 |
| Development Services department page (links the fee schedule) - SHA-256 5a1e8e96… | City of Krum | 2026-10-07 |
Last verified by ZoneFee: 2026-10-24. Fee schedules are subject to change. Verify current rates directly with the City of Krum before relying on this data for any financial decision.
This page reflects fee data sourced from Appendix A of the City of Krum Code of Ordinances as codified on eCode360 (code version dated September 8, 2026), including amendments through Ordinance 2026-895. As noted above, no special district development fee is published, the City of Denton pass-through amount is not captured, and Texas has no cash proffer regime. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. Verify all current rates directly with the City of Krum before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.