Skip to main content

Hewitt, Texas - City Development Fees

City of Hewitt | McLennan County | Waco metro, Central Texas | I-35 / FM 2113

Hewitt is a city in McLennan County directly south-west of Waco, on I-35 and FM 2113. The City provides its own water and wastewater taps and publishes a consolidated Master Fee Schedule. The fees below are captured from the Hewitt Master Fee Schedule FY 2026-2027, the version currently posted by the City; every Planning and Zoning and tap amount on this page is identical to the schedule adopted by Resolution No. 2025-06 (passed August 18, 2025, applied to all charges on or after October 1, 2025). Verify current amounts with the City of Hewitt before relying on them.

On this page
  1. Fee summary
  2. Zoning and plat fees
  3. Utility tap fees
  4. Coverage notes
  5. Fee authorities
  6. Sources

Fee Summary

Fee TypeStatusTop-Line FigureEffective / Source
Zoning and Plat Fees (zoning amendment, BOA appeal, platting, plan review)ConfirmedZoning amendment $500; preliminary plat $150 + $2/lot ($500 min)Master Fee Schedule FY 2026-2027; amounts per Res. No. 2025-06
Utility Tap / Connection Fees (water and wastewater taps, meter sets)ConfirmedWater tap $2000 base fee; wastewater tap $1000 base fee (quoted per cost)Master Fee Schedule FY 2026-2027; amounts per Res. No. 2025-06
Impact Fees (TLGC Ch. 395)Unavailable via official sourcesNo impact fee or capital recovery line in the City schedules-
Special District Fees (PID / MUD)Unavailable via official sourcesNo special-district fee found in City sources-
ProffersNot applicableTexas has no cash proffer regime; exactions run through TLGC Ch. 212 and Ch. 395-

Zoning and Plat Fees

Source: Hewitt Master Fee Schedule FY 2026-2027, "Planning & Zoning" (p.3). The amounts are identical to the Master Fee Schedule stamped "Adopted: 8/18/25 Effective: 10/1/25," Attachment A to Resolution No. 2025-06.

Application TypeFee
Application for amendment of the zoning ordinance$500
Application for appeal to Board of Adjustment$500
Application for abandonment of public right of way$500
Application for preliminary plat$150 + $2 per lot, $500 minimum
Application for final plat, amended plat, administrative plat$500
Application for final plat and re-plat with infrastructure$300 + $27 per lot
Application for platting or re-platting with variance request$450 + $2 per lot
Plat/plan review other than original review (staff)$50 per hour, one hour minimum
Plat/plan review other than original review (engineer)$150 per hour, one hour minimum
Land clearing, filling or grading permit$250
Right of way permit$200

Building and trade permit fees in the same schedule are construction-permit charges and are not covered here.

Utility Tap Fees

Source: Hewitt Master Fee Schedule FY 2026-2027, "Utility Fees - Water Taps & Meter Set" and "Wastewater Taps & Service Connection Fees" (p.7), identical to the adopted FY 2025-26 schedule. Each tap amount is a base fee with the balance "Quoted on a per-cost basis," so these are minimum amounts, not all-in totals.

Water taps and meter set

ItemFee
All water taps$2000 base fee - quoted on a per-cost basis
5/8" x 3/4" meter set$450 + cost of meter box if needed
3/4" x 3/4" meter set$500 + cost of meter box if needed
1" or larger service or meter setBase fee - quoted on a per-cost basis

Before any water line is connected to a City water main, the party requesting the connection pays the City the water service installation and meter fees for labor and materials.

Wastewater taps and service connection fees

ItemFee
All wastewater taps$1000 base fee - quoted on a per-cost basis
4" tap$2000 base fee - quoted on a per-cost basis
6" tap$2000 base fee - quoted on a per-cost basis
8" or larger lateral$2000 base fee - quoted on a per-cost basis
Service lines requiring cutting or boring of paved streets or alleysMinimum charge of $1000 base fee - quoted on a per-cost basis

The decision on a bore or utility cut is made by Community Services. Monthly water and wastewater rates and meter testing deposits in the same schedule are not development fees and are not covered here.

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were either not published by this jurisdiction as a dated fee schedule, not administered by it, or do not apply. They are disclosed here rather than estimated, paraphrased from a non-official source, or omitted silently. These items remain under limited-coverage review until any remaining gaps are closed from official sources.

Impact fees

Neither the FY 2026-2027 nor the adopted FY 2025-26 Master Fee Schedule contains an impact fee or capital recovery line, the FY 2026-27 Utility Fee Schedule has no impact fee, and the City sitemap has no impact fee page. No adopted Texas Local Government Code Chapter 395 impact fee schedule was found. Closed-search outcome: unavailable via official sources.

Special district fees

The Master Fee Schedule and Utility Fee Schedule contain no public improvement district (PID), municipal utility district (MUD), or other special-district fee; no such page appears in the City sitemap, and the Economic Development page carries no district fee schedule. Closed-search outcome: unavailable via official sources.

Proffers

Cash proffers are a Virginia statutory instrument under Virginia Code Section 15.2-2303.4 with no Texas counterpart. Texas exactions run through Local Government Code Chapter 212 (subdivision and development) and Chapter 395 (impact fees). Closed-search outcome: this fee family does not apply to this jurisdiction.

Fee Authorities

AuthorityFee TypesOfficial Website
City of Hewitt Community DevelopmentZoning amendment, Board of Adjustment, platting, and plan review feescityofhewitt.com
City of Hewitt Utility Services / Community ServicesWater and wastewater taps, meter sets, and street cut or bore chargescityofhewitt.com

See the impact fees guide for how Texas Local Government Code Chapter 395 works, and the Texas hub for other jurisdictions covered by ZoneFee. Nearby covered Waco-area jurisdictions include Waco, Woodway, and Robinson.

Sources

Last verified by ZoneFee: 2026-10-07. Fee schedules are subject to change. Verify current rates directly with the City of Hewitt (Community Development / Utility Services) before relying on this data for any financial decision.

This page reflects fee data sourced from the Hewitt Master Fee Schedule FY 2026-2027, whose Planning and Zoning and tap amounts match the schedule adopted by Resolution No. 2025-06 on August 18, 2025. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change, the City tap amounts are base fees with the balance quoted per cost, and no FY 2026-2027 adopting resolution was found posted. As noted above, the City publishes no impact fee schedule, no special-district fee was found in City sources, and Texas has no cash proffer regime. Verify all current rates directly with the City of Hewitt before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.