Nederland, Texas - City Development Fees
City of Nederland | Jefferson County | Southeast Texas Golden Triangle | US-69 between Beaumont and Port Arthur
Nederland is a home-rule city in Jefferson County in the Southeast Texas Golden Triangle, on US-69 / US-287 between Beaumont and Port Arthur. The City owns and operates its water and sewer systems and sets tap and connection fees by utility-rate ordinance. The fees below are captured from Ordinance No. 2024-16, which the City links as its Utility Rate Ordinance; it was passed and approved August 26, 2024 and took effect October 1, 2024. Verify current amounts with the City of Nederland before relying on them.
Fee Summary
| Fee Type | Status | Top-Line Figure | Effective / Source |
|---|---|---|---|
| Utility Tap / Connection Fees (water and sewer taps, street excavation) | Confirmed | 3/4" water tap $500 inside city; 2" water tap $1,450; 4" sewer tap (to 5' deep) $200 | Ord. No. 2024-16, effective 2024-10-01 |
| Zoning and Plat Fees | Unavailable via official sources | No dated zoning or plat fee schedule published on the City domain | - |
| Impact Fees (TLGC Ch. 395) | Unavailable via official sources | No adopted impact fee schedule published by the City | - |
| Special District Fees (PID / MUD) | Not administered by the City | No developer-paid special-district fee found on the City domain | - |
| Proffers | Not applicable | Texas has no cash proffer regime; exactions run through TLGC Ch. 212 and Ch. 395 | - |
Utility Tap Fees
Source: City of Nederland Ordinance No. 2024-16, Section 5 "Water Connection/Taps and Sewer Connection/Taps" (passed and approved August 26, 2024; "This ordinance shall take effect October 1, 2024"; repeals Ordinance No. 2023-19). The City provides all materials, labor, and equipment to tap the existing water or sewer line and makes the final determination of tap location.
Water taps
| Water Tap | Inside City (no street excavation) | Outside City (no street excavation) |
|---|---|---|
| 3/4" Water Tap | $500 | $675 |
| 1" Water Tap | $600 | $800 |
| 1 1/2" Water Tap | $1,150 | $1,400 |
| 2" Water Tap | $1,450 | $1,750 |
| 2" Compound | $2,500 | $2,800 |
| Over 2" Water Tap | Cost | Cost x 1.5 |
In return for the water connection fee, the City taps the existing water line and installs a water meter. The fee does not include the meter deposit set in Section 6 of the ordinance.
Sewer taps
| Sewer Tap | Inside City (no street excavation) | Outside City (no street excavation) |
|---|---|---|
| 4" up to 5' deep | $200 | $300 |
| 4" from 5' to 10' deep | $450 | $550 |
| 6" up to 5' deep | $300 | $400 |
| 6" from 5' to 10' deep | $550 | $650 |
| 8" up to 5' deep | $400 | $500 |
| 8" from 5' to 10' deep | $650 | $750 |
| More than 10' deep | Actual cost | Actual cost |
New subdivision taps (installed by developer)
| Tap Size | Inside City | Outside City |
|---|---|---|
| 3/4" Water | $250 | N/A |
| 1" Water | $350 | N/A |
| 4" Sewer | $300 | N/A |
Additional cost for street excavations
Where street excavation is required, these amounts are assessed in addition to the tap fees above.
| Excavation Length | Asphalt | Concrete |
|---|---|---|
| 5' or less | $730 | $1,650 |
| 10' or less | $1,000 | $2,200 |
| 15' or less | $1,275 | $2,400 |
| 20' or less | $1,525 | $3,425 |
| 25' or less | $1,800 | $3,650 |
| 30' or less | $2,075 | $4,000 |
| 31' (printed as "31' or less") | Cost will be calculated | Cost will be calculated |
Monthly water, sewer, and garbage rates and service deposits in the same ordinance are account and usage charges, not development fees, and are not covered here.
Coverage Notes - What This Page Does Not Cover
Per ZoneFee's Partial-Verified Publication Standard, the items below were either not published by this jurisdiction as a dated fee schedule, not administered by it, or do not apply. They are disclosed here rather than estimated, paraphrased from a non-official source, or omitted silently. These items remain under limited-coverage review until any remaining gaps are closed from official sources.
Zoning and plat fees
The City's Inspections pages link building-trade code ordinances, bond forms, and a storm water permit application, but no dated zoning, rezoning, variance, or plat fee schedule. The City's Recently Adopted Ordinances page lists no development fee ordinance, and the City's code of ordinances is hosted on a third-party code platform rather than published as a dated fee schedule on the City domain. Closed-search outcome: unavailable via official sources.
Impact fees
Ordinance No. 2024-16 and the City sitemap contain no impact fee schedule, and no adopted Texas Local Government Code Chapter 395 impact fee ordinance was found on the City domain. Closed-search outcome: unavailable via official sources.
Special district fees
No public improvement district (PID), municipal utility district (MUD), or other developer-paid special-district fee appears in Ordinance No. 2024-16, the City sitemap, or the Recently Adopted Ordinances list. Closed-search outcome: not administered by this jurisdiction.
Proffers
Cash proffers are a Virginia statutory instrument under Virginia Code Section 15.2-2303.4 with no Texas counterpart. Texas exactions run through Local Government Code Chapter 212 (subdivision and development) and Chapter 395 (impact fees). Closed-search outcome: this fee family does not apply to this jurisdiction.
Fee Authorities
| Authority | Fee Types | Official Website |
|---|---|---|
| City of Nederland Utility Billing / Public Works | Water and sewer tap, connection, and street excavation fees | ci.nederland.tx.us |
See the impact fees guide for how Texas Local Government Code Chapter 395 works, and the Texas hub for other jurisdictions covered by ZoneFee. Nearby covered Southeast Texas jurisdictions include Beaumont.
Sources
| Document | Agency | Accessed |
|---|---|---|
| Ordinance No. 2024-16 (utility rates and water and sewer connection fees), passed August 26, 2024, effective October 1, 2024 (9 pages) - SHA-256 846c4d76… | City of Nederland | 2026-10-07 |
Last verified by ZoneFee: 2026-10-07. Fee schedules are subject to change. Verify current rates directly with the City of Nederland (Utility Billing / Public Works) before relying on this data for any financial decision.
This page reflects fee data sourced from City of Nederland Ordinance No. 2024-16, effective October 1, 2024. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change, and the City re-adopts its utility rate ordinance periodically. As noted above, the City publishes no dated zoning or plat fee schedule and no impact fee schedule on its own domain, no special-district fee is administered by the City, and Texas has no cash proffer regime. Verify all current rates directly with the City of Nederland before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.