Euless, Texas - City Development Fees

City of Euless | Tarrant County | North Texas | Dallas-Fort Worth-Arlington MSA (HEB / Mid-Cities, SH-183 / SH-360 by DFW Airport)

Euless is a built-out home-rule city in northeast Tarrant County, part of the Hurst-Euless-Bedford (HEB) Mid-Cities area between Fort Worth and Dallas along SH-183 (Airport Freeway) and SH-360, adjacent to DFW International Airport. The City administers zoning, specific use permit, site plan, and platting application fees, Texas Local Government Code Chapter 395 water and sewer impact fees, and water and sewer tap fees through Planning and Economic Development, Public Works and Engineering, and Water Utilities. The fees below are captured from the City of Euless code, Chapter 30 (Fees), current through Ord. 2439. Verify current amounts with the City of Euless before relying on them.

On this page
  1. Fee summary
  2. Zoning and plat fees
  3. Utility tap fees
  4. Impact fees
  5. Coverage notes
  6. Fee authorities
  7. Sources

Fee Summary

Fee Type Status Top-Line Figure Effective / Source
Zoning and Plat Application Fees (zoning, PD, SUP, site plan, platting) Confirmed Zoning change $500 + $10/acre over 25 ac; SUP $350-$650; site plan $500-$750; plat $350 + $5/acre or $3/lot Chapter 30 Sec. 30-39, 30-40 (Ord. 2439, Sep 9, 2025)
Impact Fees (water and sewer - TLGC Ch. 395) Confirmed 5/8 in. or 3/4 in. water + sewer $2,002.60 total; scaling to $320,416 (8 in.) Chapter 30 Sec. 30-33 (Ord. 2359, Aug 21, 2023)
Utility Tap / Meter Fees (water and sewer) Confirmed Water/sewer taps and meters at actual cost of materials and labor + 15%; street cut $350/lane Chapter 30 Sec. 30-33, 30-34
Special District Fees (PID / TIF) Not administered No city-administered special-district development or application fee appears in Chapter 30 -
Proffers Not applicable Texas has no cash proffer regime; exactions run through TLGC Ch. 212 and Ch. 395 -

Zoning and Plat Application Fees

Source: City of Euless code, Chapter 30, Section 30-39 (Planning and zoning fees) and Section 30-40 (Subdivisions); governing ordinances through Ord. 2439, adopted September 9, 2025. Certain zoning and plat fees carry a per-acre or per-lot add-on as shown.

Application TypeFee
Categorical Zoning Change$500.00 + $10/acre over 25 acres
Planned Development Zoning Change$1,000.00 + $10/acre
Specific Use Permit (0-5 ac / 5-25 ac / over 25 ac)$350.00 / $500.00 / $650.00
Temporary Use Permit$100.00
Special Exception (masonry)$250.00
Variance to Zoning District Regulations$250.00
Variance to Sign Regulations$450.00
Board of Adjustment Appeal$250.00
Site Plan Approval (0-25 ac / over 25 ac)$500.00 / $750.00
Zoning Verification Letter$100.00
Preliminary Plat$350.00 + $5/non-res acre or $3/res lot
Final Plat$350.00 + $5/non-res acre or $3/res lot
Conveyance Plat$200.00
Corrected Plat$350.00
Land Plan$350.00
Plat ExtensionOriginal fee
Public Works Inspection$75.00 - $130.00 per staff

Authority: City of Euless Planning and Economic Development. County plat filing fees are paid separately and set by Tarrant County.

Utility Tap and Meter Fees

Source: City of Euless code, Chapter 30, Sections 30-33 and 30-34. Euless bills water and sewer taps and meters on a cost formula rather than a flat schedule, so the figures below are the formula and the fixed add-ons rather than a single tap dollar amount.

ServiceFee
Water / sprinkler meters and meter boxesActual cost of materials and labor + 15%
City-made water and sewer tapsCost of labor and materials + 15% (private contractor alternative allowed)
Street cut (where a utility cannot be bored)$350.00 per lane (12-ft width)
Water deposit - residential$100.00
Water deposit - commercial sprinkler$450.00
Water deposit - shell buildings$200.00 (plus service initiation fee)

Authority: City of Euless Water Utilities / Public Works. These are the one-time developer-side connection charges; recurring monthly water and sewer service rates are billed separately and are not development costs.

Impact Fees (Water and Sewer)

Source: City of Euless code, Chapter 30, Section 30-33, Texas Local Government Code Chapter 395 water and sewer impact fees (Ord. 2359, adopted August 21, 2023). The code lists several plat-date tiers; the current tier applies to final plats recorded after April 9, 2013, and is the only tier shown below. Amounts are by meter size (water plus sewer equals total).

Meter SizeWaterSewerTotal
5/8 in. or 3/4 in.$1,477.90$524.70$2,002.60
1 in.-$5,006.50
1.5 in.-$10,013.00
2 in.-$16,020.80
3 in.-$48,062.40
4 in.-$84,109.20
6 in.-$184,239.20
8 in.-$320,416.00

Earlier plat-date tiers (pre-2013 plats) carry different, superseded amounts and are not reproduced here. See the impact fees guide for how Chapter 395 works.

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were either not published in the City's official development fee sources or are not administered by this jurisdiction. They are disclosed here rather than estimated, paraphrased from a non-official source, or omitted silently. These items remain under limited-coverage review until any remaining gaps are closed from official sources.

Currency caveat

The zoning, tap, and impact fees on this page derive from the City of Euless code, Chapter 30, current through Ord. 2439 (with the impact fee schedule adopted by Ord. 2359). Fee schedules change. Confirm current amounts directly with the City of Euless before relying on them.

Cost-formula tap fees

Euless does not publish a flat water or sewer tap dollar amount. Taps and meters are billed at the actual cost of materials and labor plus 15 percent, so a project-specific figure requires a quote from the City at the time of service. ZoneFee reports the formula and fixed add-ons rather than inventing a flat tap amount.

Special district fees

No PID or TIF development or application fee appears in the full Chapter 30 capture. Euless is a built-out inner-DFW suburb with no MUD or PID overlap recorded. Closed-search outcome: not administered by this jurisdiction.

Proffers

Cash proffers are a Virginia statutory instrument under Virginia Code Section 15.2-2303.4 with no Texas counterpart. Texas exactions run through Local Government Code Chapter 212 (subdivision and development) and Chapter 395 (impact fees). Closed-search outcome: this fee family does not apply to this jurisdiction.

Fee Authorities

AuthorityFee TypesOfficial Website
City of Euless Planning and Economic Development / Building InspectionsZoning, PD, specific use permit, site plan, and platting feeseulesstx.gov
City of Euless Public Works and Engineering / Water UtilitiesWater and sewer impact fees; water and sewer tap and meter feeseulesstx.gov

See the impact fees guide for how Texas Local Government Code Chapter 395 works, and the Texas hub for other jurisdictions covered by ZoneFee. Nearby covered HEB and Mid-Cities jurisdictions include Grapevine, Hurst, Colleyville, Keller, and Fort Worth.

Sources

Last verified by ZoneFee: 2026-09-17. Fee schedules are subject to change. Verify current rates directly with the City of Euless (Planning and Economic Development / Water Utilities) before relying on this data for any financial decision.

This page reflects fee data sourced from the City of Euless code, Chapter 30 (current through Ord. 2439, with the impact fee schedule adopted by Ord. 2359). ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. As noted above, water and sewer taps are billed on a cost formula rather than a flat amount, no city-administered special-district fee exists in Chapter 30, and Texas has no cash proffer regime. Verify all current rates directly with the City of Euless before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.