Skip to main content

Tyler, Texas - City Development Fees

Tyler | City | East Texas | Tyler, TX MSA | Smith County seat | FIPS 4874144

Tyler is the Smith County seat and the regional hub of East Texas. The City of Tyler Development and Planning Department / Building Inspections administers developer-side fees through the Schedule of Fees page (a Granicus OpenCities-published page covering building, mechanical, plumbing, electrical, sign, demolition, house-moving, and miscellaneous permits). Tyler Unified Development Code Article X Division B (Section 10-776 Fees) governs planning application and zoning application fees, captured in a separate Planning Application Fees PDF (last amended Ordinance O-2019-94 on November 13, 2019; cumulative ordinances 2009 through 2019 listed). Commercial nonresidential building permit and fire inspection fees are effective October 1, 2024 at $5.00 per $1,000 of estimated construction valuation. Permits are filed through eTRAKiT and ProjectDox portals. Department address: 212 N. Bonner Ave., Tyler TX 75702; main line (903) 531-1100.

On this page
  1. Fee summary
  2. Construction permits
  3. Planning application fees
  4. Coverage notes
  5. Fee authorities
  6. Sources

Fee Summary

Fee Type Status Top-Line Figure Effective Date
Residential Building Permit (New Construction) Confirmed $0.35 per sq ft (Minimum $50; Plan Check 20%) (Cumulative UDC schedule)
Commercial / Nonresidential / Industrial Building Permit Confirmed $5.00 per $1,000 of estimated construction valuation (Minimum $50; Plan Check 25%) October 1, 2024
Mechanical, Plumbing, Electrical, Sign, Demolition, House Moving, Misc. Permits Confirmed Detailed per-fixture and per-circuit schedule from Schedule of Fees (Cumulative)
Planning Application and Zoning Application Fees (UDC Sec. 10-776) Confirmed 30+ line items including Annexation $420; Variance $386; Zoning Change/SUP $550; Planned Development $1,050; Subdivision Infrastructure $1,000 (Last amended O-2019-94, 2019-11-13)
Impact Fees (Chapter 395) Not listed on public schedule Texas Local Government Code Chapter 395 is voluntary; Tyler has not posted a Chapter 395 impact fee schedule on its public development-side fee surface -
Water and Sewer Tap Fees Administered separately Water Business Office (903) 531-1230 administers tap fees; not posted on the Schedule of Fees page -
Proffers Not applicable Texas jurisdictions do not use Virginia-style cash proffers -
Special District Fees Not administered by this city No City-administered CDA / TIF / BID / PID / MUD consolidated development-side fee schedule located on the Development and Planning fee surface -

Construction Permits - Schedule of Fees

Source: City of Tyler Schedule of Fees (Granicus OpenCities), page SHA-256 247ce067... Commercial nonresidential effective notice 2024-10-01 captured. Residential Plan Check is 20% of Total Permit Fee. Commercial Plan Check is 25% of Total Permit Fee.

Building Permits

ScopeFee
Residential Construction - New Construction (Cost Per Square Foot)$0.35 per sq ft (Minimum Fee $50)
Residential Plan Check Fee20% of Total Permit Fee
Residential Alteration/Additions/Repairs$0.35 per sq ft (Plan Check 20%)
Commercial/Non-Residential/Industrial - New Construction/Alteration/Addition/Repair (Effective 2024-10-01)$5.00 per $1,000 of estimated construction valuation (Minimum $50)
Commercial Plan Check Fee25% of Total Permit Fee
Re-inspection Fee$50

Mechanical Permits

ScopeFee
Cooling/Heating Systems New$50 Minimum Fee
Cooling/Heating Repairs/Alterations/Additions$50 Minimum Fee
Mechanical Commercial Hood$50

Plumbing Permits

ScopeFee
Fixtures (per fixture)$6.00 each
Gas Openings$20 first 10 openings; $0.50 each additional
Boiler$50
Gas Meters (additional)$15 each
Sand/Grease/Grit Trap$50
Temporary Service$50
Yard Irrigation$50

Electrical Permits

ScopeFee
Minimum Fee Circuits$50; $4.00 first 3 circuits; $1.75 each additional opening
Switches/Base Plugs/Fixtures$4.00 first 5; $0.35 each additional
Dryer/Water Heater/Heating Unit/Range/Sanding Machine/Smoke Detector$3.50 each
Motor (1/2 HP to 5 HP)$3.50
Motor (over 5 HP)$12.00
Saw Service$30.00
Sign$30.00
Swimming Pool$50
Temporary Service$50

Sign Permits

ScopeFee
Wall/Façade less than 50 sf$35
Wall/Façade over 50 sf$60
Awning less than 50 sf$60
Awning over 50 sf$80
Projection Under 50 sf$60
Freestanding/Monument less than 50 sf$60
Freestanding/Monument over 50 sf$80
Electronic Message Center$150
Directional$35
Neon/Argon Gas Tubing$70
Billboard Single Face$150
Billboard Double Face$300
Sign Contractor's Registration$50

Demolition, House Moving, Miscellaneous

ScopeFee
Demolition - Residential$50
Demolition - Residential Accessory Buildings$50
Demolition - Commercial/Industrial$60 first 2,000 sq ft + $2.50 per additional 100 sq ft
House Moving - less than 500 sq ft$75
House Moving - 501 to 750 sq ft$85
House Moving - 751 to 1,000 sq ft$100
House Moving - over 1,001 sq ft$150
House Mover Registration$50
Carnival/Circus$150
Certificate of Occupancy$80
Door/Window Replacement (Residential)$10 per opening, $50 minimum
Driveway Permit (Commercial or Residential)$50 each
Floodplain Development Permit$50
Grading Permit (Commercial or Residential)$50 each
Mobile Home Permit$50
Parking Lot Permit$50 + $2.50 per $1,000 valuation
Passenger Elevators (each unit)$50
Satellite Dish Permit$50
Solar Panel Residential$100 + Electrical Permit
Roof Replacement Residential$100
Roof Replacement CommercialValuation + Square Footage
Swimming Pools Residential$150
Temporary Sign/Banner Permit (City Right of Way)$10
Temporary Use Permit$35
Transient Vendor Permit$150

Planning Application and Zoning Application Fees - UDC Section 10-776

Source: Tyler Unified Development Code Article X Division B Section 10-776 (Planning Application Fees PDF, SHA-256 13659318...). Last amended by Ordinance O-2019-94 on November 13, 2019; cumulative ordinances 2009 through 2019 listed in the source PDF. Notes referenced in the schedule: [a] $30 publication plus $20 mailed notification within 200 feet; [b] $20 Zoning Sign Deposit refundable; [c] City fee only with Smith County Clerk fees separate; [d] Non-Profit waiver; [e] 50% late submittal convenience fee.

ApplicationFee
Alternative Compliance Review$80
Annexation (Voluntary)$420 + notes [a][b][c][e]
Billboard Annual Registration$85 per billboard
FEMA Map Revision Letter Review$500
Master Sign Plan$80
Master Street Plan Amendment$500
Minor Plat (4 lots or less, no extensions)$300 + $5 per lot + [a][c]
Major Plat$400 + $5 per lot + [c] + [e]
Preliminary Plat (Residential or Commercial)$300 + $5 per lot + [e]
Pre Plat Agreement$200
Plat Vacation$100 + [c]
Predevelopment Meeting (site over 1 acre)$100
Quality Control Testing (in-City)1% (3% outside City limits) + $500 per submitted plan review
Right-of-way Closure$350 + [a] + [e]
Street Name Change$200 + [a] + [e]
Subdivision Infrastructure Plan Review$1,000
Outdoor Transient Vendor Permit$150 [d]
Variance$386 + [a] + [c] + [e]
Zoning Change / Special Use Permit / Beer and Wine Site Inspection / Zoning Site Inspection Verification$550 + [a][b] + [e]
Zoning Change Planned Development$1,050 + [a][b] + [e]
Zoning Site Plan Amendment$1,050 + [a][b] + [e]
Zoning Site Plan Amendment (Administrative)$80
Zoning Verification Letter Request$50

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were not closed via confirmed fee amounts on this page. They are disclosed here rather than estimated or omitted silently.

Impact Fees

Texas Local Government Code Chapter 395 allows but does not mandate impact fees for political subdivisions meeting specific criteria. The City of Tyler has not posted a Chapter 395 impact fee schedule on the public Development and Planning fee surface. Two substitute paths were probed (Schedule of Fees page, Planning Application Fees PDF); no impact fee schedule was surfaced. Closed-search outcome: not listed on public schedule. Tyler's developer-side capital contribution operates through platting fees, zoning application fees, building permits, and construction-valuation-based commercial nonresidential charges captured above.

Water and Sewer Tap Fees

The Schedule of Fees page does not post water or wastewater tap fees. The page directs requesters to the Water Business Office at 903-531-1230. The Water Business Office administers tap fees separately from the Development and Planning fee surface captured here. Two substitute paths were probed (Schedule of Fees page, Planning Application Fees PDF); no tap fee schedule was located on the public development-side fee surface. Closed-search outcome: administered separately, not posted. A future ZoneFee source review will capture the Water Utilities fee surface directly or via Records Request.

Proffers

Texas jurisdictions do not use Virginia-style cash proffers. Virginia Code Section 15.2-2303 has no Texas counterpart. Tyler's developer-side capital contribution occurs through platting fees, zoning application fees, building permits, and construction-valuation-based commercial nonresidential charges captured above. Closed-search outcome: this fee family does not apply to this jurisdiction.

Special District Fees

The City of Tyler does not administer a consolidated Community Development Authority, Tax Increment Reinvestment Zone, Business Improvement District, Public Improvement District, or Municipal Utility District development-side fee schedule as part of its Development and Planning fee surface. Three substitute paths were probed (Schedule of Fees page, Planning Application Fees PDF, Development and Planning landing); no city-administered special-district development-side fee schedule was located. Closed-search outcome: not administered by this jurisdiction.

Fee Authorities

Authority Fee Types Official Website
City of Tyler - Development and Planning Department / Building Inspections Building, mechanical, plumbing, electrical, sign, demolition, house-moving, and miscellaneous permits; planning and zoning application fees per UDC Section 10-776 cityoftyler.org/City-Government/Development-Planning
City of Tyler - Water Business Office Water and sewer tap fees, water and sewer rates, meter charges (administered separately from Development and Planning fee surface) cityoftyler.org / 903-531-1230

Sources

Document Agency Accessed
City of Tyler Schedule of Fees (page SHA-256 247ce067...) City of Tyler, TX - Development and Planning Department 2026-05-14
Tyler UDC Article X Division B Section 10-776 - Planning Application Fees (PDF; SHA-256 13659318...) City of Tyler, TX - Development and Planning Department 2026-05-14

Last verified by ZoneFee: 2026-05-14. Fee schedules are subject to change. Verify current rates directly with the City of Tyler Development and Planning Department before relying on this data for any financial decision.

This page reflects fee data sourced from the City of Tyler Schedule of Fees page (page SHA-256 247ce067...; commercial nonresidential effective notice October 1, 2024) and the Planning Application Fees PDF under Tyler Unified Development Code Article X Division B Section 10-776 (PDF SHA-256 13659318...; last amended Ordinance O-2019-94 on November 13, 2019). ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. Tyler has not posted a Texas Local Government Code Chapter 395 impact fee schedule on its public development-side fee surface; Texas jurisdictions do not use Virginia-style cash proffers. Water and sewer tap fees are administered separately by the City of Tyler Water Business Office (903-531-1230) and are not posted on the Development and Planning fee surface captured here. No City-administered consolidated special-district fee schedule was located on the public development-side fee surface. Verify all current rates directly with the City of Tyler Development and Planning Department and (for tap fees) the Water Business Office before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.