Skip to main content

Carroll County, Maryland - County Development Fees

Carroll County | County | Baltimore Metro northwest / Piedmont Maryland | Baltimore-Columbia-Towson, MD MSA | County seat: Westminster | FIPS 24013

Carroll County sits in the Piedmont northwest of Baltimore between Frederick County (west) and Howard County (south). The Carroll County Department of Public Works administers building permit, plumbing, electrical, fire plan, and residential impact fees through its Division of Permits and Inspections (225 North Center Street, Westminster MD 21157; phone 410-386-2674; Monday-Friday 8:00 AM to 5:00 PM). Permit applications are filed through the Carroll Permitting Plan Review and Licensing (CPPL) portal. Residential statutory impact fees adopted under County Code Title 33 Chapter 33.55 (Development Impact Fees) are paid in full prior to building permit issuance. Carroll County contains 8 incorporated municipalities (Westminster, Hampstead, Manchester, Mount Airy, Sykesville, Taneytown, Union Bridge, New Windsor) each of which administers its own municipal services. The Freedom District water and sewer service area is operated by the County Department of Public Works under a separate rate ordinance.

On this page
  1. Fee summary
  2. Impact fees
  3. Building permits
  4. Coverage notes
  5. Fee authorities
  6. Sources

Fee Summary

Fee Type Status Top-Line Figure Effective Date
Residential Impact Fee (Single Family Detached) Confirmed $3,533 SFD; $1,998 Mobile Home; $3,944 Townhouse; $1,600 Multi-Family September 1, 2023
Residential Building Permit (New Construction) Confirmed $170 base + $0.12 per sq ft (includes $70 filing fee, U&O, low voltage, grading) April 6, 2021
Commercial Building Permit (New Construction) Confirmed $120 + $0.20 per sq ft + $80 U&O+low voltage (minimum $170; 50% reduction for agricultural) April 6, 2021
Building Codes Appeal Filing Fee Confirmed $150 per appeal; Re-Inspection $50 first additional / $100 repeated April 6, 2021
Plumbing / Electrical / Fire Plan Schedules Source captured Separate per-fixture / per-circuit / per-inspection schedules published on Fee Schedules page (Electrical revised with EV charger and HVAC line items) July 1, 2020
Utility Tap Fees (water / wastewater connection) Not administered by Carroll County County does not operate a countywide water/sewer utility for unincorporated areas; 8 municipal water/sewer systems and the Freedom District schedule are administered separately -
Proffers Not applicable Maryland jurisdictions do not use Virginia-style cash proffers; MD substitutes APFO mitigation and Article 25 Section 9J statutory impact fees -
Special District Fees (CDA / TIF) Does not apply No county-level CDA / TIF / service-district development-side fee schedule located on the official Permits and Inspections pages -

Residential Impact Fee Schedule - Effective September 1, 2023

Statutory authority: Carroll County Code Title 33 Chapter 33.55 (Development Impact Fees) and Chapter 33.69 (Impact Fee Waivers). The fee is intended to offset the burden of new development on schools and parks per the official Division of Permits and Inspections Impact Fees page. Currently no impact fees apply to commercial development. The fee is paid in full prior to building permit issuance and applies to all new dwelling / living units. Apartments or dwelling units in or over an existing detached building are charged the Single Family rate. Units occupied after March 1989 being replaced on the same parcel are not subject to the impact fee. Administered by: Carroll County Department of Public Works - Division of Permits and Inspections.

Dwelling Unit TypeFee
Single Family Detached$3,533
Mobile Home$1,998
Townhouse$3,944
Multi-Family$1,600

Source: Carroll County Division of Permits and Inspections - Impact Fees page (SHA-256 ca63a0e8...). Statutory references: Carroll County Code 33.55 + 33.69.

Building Permit Fee Schedule - Effective April 6, 2021

Source: Carroll County Building Permit Fee Schedule (coded), 1-page PDF on the Division of Permits and Inspections Fee Schedules page (SHA-256 628775f1...). Permit applications are filed through the CPPL portal (amprod.carrollcountymd.gov/citizenaccess).

Residential Permits

ScopeFee
New Construction (SFD, Duplex, Tri-plex, Townhouse, Mobile Home, Multi-Family, Apartments) - base$170 + $0.12 per sq ft (includes $70 filing fee, U&O, low voltage, grading)
Additions / Garages / Pole Building / Sheds (over 500 sq ft)$60 + $0.12 per sq ft + $30 U&O + $30 Grading
Carports / Sheds 500 sq ft or smaller / Porches / Decks / Gazebos / Pavilions$60
Farm Buildings (Schedule 1040 F)$100 (includes $60 filing fee)
Interior / Exterior Alterations, Repairs, Remodeling, Finished Basements$85 (includes $60 filing fee)
Swimming Pool Above-Ground$60
Swimming Pool In-Ground$120 (includes $60 filing fee)
Retaining Walls (over 48 in) / Chimneys / Footer and Slab / Driveway Entrances$60
Solar Panel / Wind Turbines$60
Pre-Fab Sheds (1 story single unit on skids)$30
Demolition$60

Commercial Permits

ScopeFee
New Buildings / Additions (Minimum $170)$120 + $0.20 per sq ft + $80 U&O+low voltage
Interior Alterations$120 + $0.10 per sq ft + $30 U&O
Tenant Fit-Outs$120 + $0.10 per sq ft + $30 U&O
Change of Use$120 + $0.10 per sq ft + $30 U&O
Change of License (not new construction)$120 + $50
Signs (On Building / Freestanding / Portable)$75 per side
Solar Panels / Wind Turbines$120 + $50
Public Swimming Pools$120 + $400
Demolition$100
Early Start (Commercial Projects Only)$100
Pre-Permit Plan Review$170

Miscellaneous

Fee TypeFee
In-ground Fuel Storage Tank (per tank, Remove)$70
In-ground Fuel Storage Tank (per tank, Install)$100
In-ground Fuel Storage Tank (per tank, Remove and Install)$150
Building Codes Appeal Filing Fee$150
Re-Inspection 1st Additional Inspection$50
Re-Inspection Repeated Violation / Additional Inspections beyond 1st$100

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were not closed via confirmed fee amounts on this page. They are disclosed here rather than estimated or omitted silently.

Plumbing / Electrical / Fire Plan Per-Fixture Line Items

The Carroll County Plumbing, Electrical, and Fire Plan and Inspection fee schedules are published as separate PDFs effective July 1, 2020 on the Division of Permits and Inspections Fee Schedules page. Each PDF was captured as a verified primary source during the 2026-05-14 source review (Plumbing 253 KB, SHA-256 14c13572...; Electrical 176 KB, SHA-256 b4b8b3d7...; Fire Plan and Inspection 222 KB, SHA-256 47dd1a2c...). The Electrical schedule includes a revision adding EV charger and HVAC line items. Per-fixture, per-circuit, and per-inspection dollar amounts from those schedules are not enumerated on this page; a future ZoneFee source review will extract the per-line-item values and publish them as a dedicated zoning_fees expansion. The PDFs themselves remain authoritative for current charges.

Freedom District Water and Sewer Hookup Charges

The Freedom District water and sewer service area (covering parts of Eldersburg and Sykesville) is operated by the Carroll County Department of Public Works under a distinct rate ordinance separate from the Division of Permits and Inspections fee schedules captured above. Developer-side hookup charges within the Freedom District are administered separately. A future ZoneFee source review will target the Department of Public Works directly to capture any Freedom District developer-side capital recovery charges. Closed-search outcome: not currently in scope for this page.

Utility Tap Fees (Municipal and Rural)

Carroll County government does not operate a countywide water and sewer utility for unincorporated areas. Municipal water and sewer service is administered independently by Westminster (the county seat) and the towns of Hampstead, Manchester, Mount Airy, Sykesville, Taneytown, Union Bridge, and New Windsor. Rural and unincorporated areas are largely served by private wells and on-site septic. Closed-search outcome: not administered by this jurisdiction at the county level.

Proffers

Maryland jurisdictions do not use Virginia-style cash proffers. Va. Code Section 15.2-2303 has no Maryland counterpart. Maryland substitutes Adequate Public Facilities Ordinance (APFO) mitigation and statutory development impact fees. Same closure as Frederick County MD, Howard County MD, and Montgomery County MD. Closed-search outcome: this fee family does not apply to this jurisdiction.

Special District Fees (CDA / TIF / Service Districts)

Carroll County does not administer a Community Development Authority, TIF zone, or service-district development-side fee schedule of the kind that appears as a county-level line item. The 8 incorporated municipalities each administer their own services. The Freedom District water and sewer service area exists but its developer-side hookup charges are administered under utility_tap_fees scope by Public Works (separately from Division of Permits and Inspections). Doctrinally consistent with Frederick County MD, Howard County MD, and Montgomery County MD. Closed-search outcome: this fee family does not apply to this jurisdiction.

Adequate Public Facilities Ordinance (APFO) Qualitative Narrative

Carroll County uses an Adequate Public Facilities Ordinance program under County Code Title 33 as a complement to the statutory impact fee. The APFO is a regulatory test rather than a posted fee schedule. Quantitative APFO impact is captured indirectly through the impact_fees schedule above. A future ZoneFee source review will add an APFO narrative section once the APFO chapter has been reviewed against the current Carroll County Code.

Fee Authorities

Authority Fee Types Official Website
Carroll County Department of Public Works - Division of Permits and Inspections Building permit fees, plumbing fees, electrical fees, fire plan and inspection fees, residential impact fees, use and occupancy and grading fees; CPPL permit portal carrollcountymd.gov/government/directory/public-works/permits-inspections/
Carroll County Department of Public Works - Freedom District (water and sewer) Freedom District water and sewer hookup and capital recovery charges (separate rate ordinance; not in DPW Division of Permits and Inspections namespace) carrollcountymd.gov
Incorporated Municipalities (Westminster, Hampstead, Manchester, Mount Airy, Sykesville, Taneytown, Union Bridge, New Windsor) Municipal water and sewer connection charges and municipal-level building / zoning fees within each incorporated city / town (not in county fee namespace; out of scope for this page) Separate municipal websites

Sources

Document Agency Accessed
Division of Permits and Inspections - Impact Fees subpage (residential schedule effective September 1, 2023) Carroll County Department of Public Works - Division of Permits and Inspections 2026-05-14
Building Permit Fee Schedule (coded, effective April 6, 2021) - official PDF Carroll County Department of Public Works - Division of Permits and Inspections 2026-05-14
Plumbing Fee Schedule (effective July 1, 2020) - official PDF Carroll County Department of Public Works - Division of Permits and Inspections 2026-05-14
Electrical Fee Schedule (coded, effective July 1, 2020 with EV charger and HVAC revisions) - official PDF Carroll County Department of Public Works - Division of Permits and Inspections 2026-05-14
Fire Plan and Inspection Fee Schedule (effective July 1, 2020) - official PDF Carroll County Department of Public Works - Division of Permits and Inspections 2026-05-14
Permits and Inspections department landing Carroll County Department of Public Works - Division of Permits and Inspections 2026-05-14
Fee Schedules subpage (PDF index) Carroll County Department of Public Works - Division of Permits and Inspections 2026-05-14

Last verified by ZoneFee: 2026-05-14. Fee schedules are subject to change. Verify current rates directly with the Carroll County Department of Public Works Division of Permits and Inspections before relying on this data for any financial decision.

This page reflects fee data sourced from the Carroll County Division of Permits and Inspections Impact Fees subpage (residential schedule effective September 1, 2023) and the Carroll County Building Permit Fee Schedule PDF (coded, effective April 6, 2021), with the supporting Plumbing, Electrical, and Fire Plan and Inspection fee schedule PDFs (each effective July 1, 2020) captured as additional verified primary sources. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. Per-fixture, per-circuit, and per-inspection dollar amounts in the Plumbing, Electrical, and Fire Plan and Inspection PDFs are not yet enumerated on this page; the PDFs themselves remain authoritative. The Carroll County Development Impact Fee Ordinance (Title 33 Chapter 33.55) currently applies to residential development only; the schedule does not apply impact fees to commercial development. Carroll County does not operate a countywide water and sewer utility for unincorporated areas; the 8 incorporated municipalities and the Freedom District (operated by the County Department of Public Works under a distinct rate ordinance) administer water and sewer connection charges separately. Maryland jurisdictions do not use Virginia-style cash proffers (Va. Code 15.2-2303 has no Maryland counterpart); Maryland substitutes APFO mitigation and statutory development impact fees. No county-level CDA / TIF / service-district development-side fee schedule is located on the official Permits and Inspections pages. Verify all current rates directly with the Carroll County Department of Public Works Division of Permits and Inspections before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.