Clayton is the largest town in Johnston County, in the eastern Research Triangle along the US-70 corridor within the Raleigh-Cary, NC MSA. The dominant development charge in Clayton is the water and sewer System Development Fee, which North Carolina towns that operate their own utility levy under NCGS Chapter 162A, Article 8 in place of impact fees, charged by meter size and reaching into the tens of thousands of dollars per connection. The Town also administers a detailed schedule of rezoning, subdivision, plat, site plan, and engineering review fees through its Planning, Engineering, Inspections, and Public Utilities departments. North Carolina does not authorize local impact fees or Virginia-style cash proffers. All amounts below are drawn from the Town of Clayton Comprehensive List of Fees, FY27 rate column (fiscal year 2026-2027, effective July 1, 2026). See more North Carolina jurisdictions on the North Carolina hub and compare with nearby Raleigh. Verify current amounts with the Town of Clayton before relying on them.
On this page
Fee Summary
| Fee Type | Status | Top-Line Figure | Effective Date |
|---|---|---|---|
| Utility Tap Fees (NCGS 162A System Development Fees, by meter size) | Confirmed | Standard 5/8-inch residential connection $11,000 combined (water capacity $3,904 + sewer capacity $7,096); scales by meter size to $88,000 at 2-inch (water $31,232 + sewer $56,768); meters greater than 2-inch require a custom Utility Service Agreement; plus 5/8-inch water tap base cost $3,500 and $450 per-residential-tap nutrient offset | 2026-07-01 (FY27) |
| Zoning, Subdivision, and Development Review Fees | Confirmed | Conventional Rezoning $1,000 + $25/acre; Conditional Type 1 / 2 / 3 $1,250 / $1,500 / $2,000 + $25/acre; Special Use Permit $1,000; Site Plan $1,000 + $25/acre; Major Subdivision $1,000 + $25/lot; Final Plat $300 + $10/lot | 2026-07-01 (FY27) |
| Impact Fees | Not administered | North Carolina has no general municipal impact-fee statute; water and sewer capacity is recovered as the meter-based System Development Fees shown above (NCGS Ch. 162A Art. 8). UDO Section 6.7.2 recreation fee-in-lieu is left unpriced in the schedule | - |
| Special District Fees | Not administered | North Carolina municipal service districts (NCGS 160A Art. 23) are funded by a district property-tax levy, not a developer application fee | - |
| Proffers | Not applicable | North Carolina does not use Virginia-style cash proffers; NC conditional zoning is governed by NCGS 160D-703 | - |
Water and Sewer System Development Fees
Source: Town of Clayton Comprehensive List of Fees, Water & Sewer Infrastructure section (pp. 14-15), FY27 rate column, effective July 1, 2026. This is the highest-value block on the page for a developer. Clayton operates its own water and sewer utility and recovers capacity through North Carolina General Statutes Section 162A-205 System Development Fees charged by meter size, not through an impact fee. Water and sewer capacity are charged separately, and the fees are also expressed per gallon per day: water $9.57 per gallon per day and sewer $23.91 per gallon per day. Expanded usage requiring meters greater than 2 inches requires a Utility Service Agreement (custom-assessed) rather than a table rate.
System Development Fees by meter size (water and sewer charged separately)
| Meter Size | Water Capacity SDF | Sewer Capacity SDF | Combined |
|---|---|---|---|
| 5/8 inch | $3,904 | $7,096 | $11,000 |
| 1 inch | $9,760 | $17,740 | $27,500 |
| 1.5 inch | $19,520 | $35,480 | $55,000 |
| 2 inch | $31,232 | $56,768 | $88,000 |
A standard single-family connection uses a 5/8-inch meter: water capacity $3,904 plus sewer capacity $7,096, a combined $11,000. Expanded usage requiring meters greater than 2 inches requires a Utility Service Agreement (custom-assessed) rather than a published table rate. The System Development Fees are also stated per gallon per day: Water Capacity $9.57 per gallon per day and Sewer Capacity $23.91 per gallon per day.
Water and sewer tap base costs
| Item | Fee |
|---|---|
| 5/8 inch Water Tap - Base Cost | $3,500.00 |
| 1 inch Water Tap - Base Cost | $4,000.00 |
| 1.5 inch & 2 inch Water Tap - Base Cost | $4,500.00 |
| 4 inch Sewer Tap - Base Cost | $5,800.00 |
| 5/8 inch Water Meter Only | $410.00 |
| 1 inch Water Meter Only | $570.00 |
| 1.5 / 2 inch & 3 inch+ Water Meter | Cost of Meter + 10% |
| Irrigation Split - Base Cost | $1,000.00 |
| Relocate Meter Box | $1,000.00 |
| All Taps Requiring Asphalt/Concrete Cut | $2,000.00 |
| Nutrient Offset Fee - Per Residential Tap | $450 per tap |
Engineering inspection fees
| Item | Fee |
|---|---|
| Water System Extensions | $1.50 per linear foot |
| Sanitary Sewer System Extensions | $1.50 per linear foot |
| Water Taps (not performed by town) | $150.00 |
| Sanitary Sewer Taps (not performed by town) | $150.00 |
| Fire Line Connection | $250 per connection |
Fee authority: Town of Clayton Public Utilities. System Development Fees are governed by NCGS Chapter 162A, Article 8 (the Public Water and Sewer System Development Fee Act).
Zoning, Subdivision, and Development Review Fees
Source: Town of Clayton Comprehensive List of Fees, Planning Development Submittal Fees (pp. 10-12) and Engineering Review Fees (p. 4), FY27 rate column, effective July 1, 2026. Clayton uses a tiered conditional rezoning structure distinct from conventional rezoning.
Rezoning and concept plans
| Application Type | Fee |
|---|---|
| Conventional Rezoning (4th and each subsequent submittal $250) | $1,000 + $25 per acre |
| Conditional Rezoning - Type 1 (Limited Use) (resubmittal $625) | $1,250 + $25 per acre |
| Conditional Rezoning - Type 2 (Limited Standard) (resubmittal $750) | $1,500 + $25 per acre |
| Conditional Rezoning - Type 3 (Unlimited) with Associated Concept Plan (resubmittal $1,000) | $2,000 + $25 per acre |
| Concept Plan | $1,000 + $5 per acre |
| Site Specific Development Plan | $1,000.00 |
Permits, petitions, and administrative fees
| Application Type | Fee |
|---|---|
| Special Use Permit | $1,000.00 |
| Variance Application ($1,000 after the fact) | $500.00 |
| Appeal | $500.00 |
| Determination | $500.00 |
| Annexation | $300.00 |
| Development Agreement | $2,000.00 |
| Development Name Change | $250.00 |
| Fee-in-Lieu Request (By Applicant) | $300.00 |
| Administrative Adjustment (UDO or MSSD) | $500 per request |
| Minor Modification | $500.00 |
| Vested Rights Certificate | $1,000.00 |
| Street Closure | $1,000.00 |
| Street Renaming | $500.00 |
| Tree Clearing Certificate | $500.00 |
Subdivision and platting
| Application Type | Fee |
|---|---|
| Major Subdivision / Conservation Subdivision | $1,000 + $25 per lot |
| Limited Subdivision | $500 + $25 per lot |
| Final Plat: Subdivision and Right-of-Way Dedication | $300 + $10 per lot |
| Final Plat: Exempt and/or Easement Dedication | $150.00 |
| Site Plan | $1,000 + $25 per acre |
Zoning compliance and signs
| Item | Fee |
|---|---|
| Establishment of a Principal Use / Change of Tenant / Family Care Home / Mobile Restaurant / Outdoor Dining / Outdoor Display / Patios (permit + first inspection) | $125.00 |
| Home Occupation / Fence or Wall 6 ft or less / Flagpoles / Art Installation | $25.00 |
| Zoning Verification | $125.00 |
| Sign - Permanent 30 sf or less | $150 per sign |
| Sign - Permanent greater than 30 sf | $6.00 per sq ft |
| Sign - Permanent Application Fee | $25.00 |
| Sign - Temporary | $10.00 |
Engineering review and land disturbance
| Review Type | Fee |
|---|---|
| Combo: Site Plan / CD Review | $1,800 + $40 per disturbed acre |
| Combo: Subdivision / CD | $1,800 + $60 per lot |
| Construction Drawing (Sites / Infrastructure) | $750 + $40 per disturbed acre |
| Construction Drawing (Subdivision) | $750 + $35 per lot |
| Construction Drawing Revisions | $500 + $10 per sheet |
| As-Builts | $625.00 |
| Floodplain Permit | $300.00 |
| Encroachment Agreement Application | $500.00 |
| Sewer Extension Permit Application | $325.00 |
| Special Study (Flood, Traffic Calming) | $500 + Cost of Consultant |
| Wastewater Allocation Request (over 10,000 GPD / 10,000 GPD or less) | $500 / $100 |
| Land Disturbance Permit - Initial (valid 2 years) | $200 per disturbed acre |
| Land Disturbance Plan Review | $300 per disturbed acre |
| Land Disturbance - Single Lot | $200.00 |
Planning consultant review
| Study Type | Fee |
|---|---|
| Transportation Impact Analysis | $500 + Cost of Consultant |
| Traffic Assessment | $350 + Cost of Consultant |
| Telecommunications Facility - Major | $1,000 + Cost of Consultant |
| Telecommunications Facility - Concealed | $500 + Cost of Consultant |
| Telecommunications Facility - Collocation | $300 + Cost of Consultant |
Fee authority: Town of Clayton (Planning, Engineering, Inspections).
Coverage Notes - What This Page Does Not Cover
Per ZoneFee's Partial-Verified Publication Standard, the items below were either closed by official-source review as not administered, or deferred to the cited source rather than estimated or omitted silently. These items remain under limited-coverage review until these gaps are closed.
Impact Fees
North Carolina has no general municipal impact-fee enabling statute. Water and sewer capacity is recovered as NCGS Chapter 162A, Article 8 System Development Fees, captured above. Clayton's FY27 fee schedule contains no fixed-amount impact fee. The one adjacent instrument is the UDO Section 6.7.2 Recreation and Open Space fee-in-lieu, which the schedule leaves unpriced (marked "Fees cannot be prepaid"); no dollar figure is asserted here because none is published in the fee schedule, and the UDO amount is a future capture. Closed-search outcome: this fee family is not administered by this jurisdiction as a distinct impact fee.
Special District Fees
Clayton publishes no per-application special-district fee. North Carolina municipal service districts (NCGS Chapter 160A, Article 23) are established by council resolution and funded by a district property-tax levy, not a developer application fee. Closed-search outcome: this fee family is not administered by this jurisdiction.
Proffers
North Carolina does not use Virginia-style cash proffers. Cash proffers are a Virginia and Maryland conditional-zoning instrument (Virginia Code Section 15.2-2303.4) with no North Carolina counterpart; NC conditional zoning is governed by NCGS Section 160D-703 and does not support that kind of monetary exaction. Closed-search outcome: this fee family does not apply to this jurisdiction.
Fee Authorities
| Authority | Fee Types | Official Website |
|---|---|---|
| Town of Clayton (Planning, Engineering, Inspections, Public Utilities) | Zoning, subdivision, site plan review, building permit, engineering review, utility tap, and water/sewer System Development Fees (NCGS 162A) | townofclaytonnc.org |
Sources
| Document | Agency | Accessed |
|---|---|---|
| Comprehensive List of Fees, FY 2026-2027 (FY27 rate column, 17 pp) | Town of Clayton | 2026-07-28 |
Last verified by ZoneFee: 2026-07-29. Fee schedules are subject to change. The Clayton Comprehensive List of Fees carries no single printed effective-date string; currency is anchored by the "FY27 RATE" column header (fiscal year 2026-2027, effective July 1, 2026). Verify current rates directly with the Town of Clayton Planning, Engineering, or Public Utilities departments before relying on this data for any financial decision.
This page reflects fee data sourced from the Town of Clayton Comprehensive List of Fees, FY27 rate column (fiscal year 2026-2027, effective July 1, 2026), as of the last-verified date above. The consolidated schedule carries no single printed effective-date string; the "FY27 RATE" column header is the authoritative currency anchor. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. Water and sewer System Development Fees are charged separately and vary by meter size, so the totals shown apply only to the stated meter configurations, and the standard 5/8-inch residential connection combines to $11,000; meters greater than 2 inches require a custom Utility Service Agreement. The UDO Section 6.7.2 recreation and open space fee-in-lieu is not priced in the fee schedule. North Carolina charges no local impact fee and no Virginia-style cash proffer, and Clayton publishes no per-application special-district fee. Verify all current rates directly with the Town of Clayton before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.