Skip to main content

Georgetown, TX - Utility Tap and Connection Fees

City of Georgetown | Georgetown Utility Systems | Williamson County

Pending re-verification (2026-11-04)

The City no longer posts the Construction Fee Schedule Rev. 11.5.2025 that the amounts on this page come from, and ZoneFee found no replacement schedule on the City site when it checked on 2026-11-04. The water and wastewater amounts on this page are therefore withheld and marked pending re-verification; confirm current charges with Georgetown Utility Systems. Electric meter connection fees below come from a schedule that is still posted.

See corrections to report other errors.

These fees apply to new water, wastewater, and electric service connections in Georgetown. Rates vary by meter or pipe size (water and wastewater) or service configuration (electric). These tap and connection fees are separate from and in addition to Georgetown’s water and wastewater impact fees, which are covered on the Georgetown, TX development fees page.

Water Tap Fees

Effective November 5, 2025. Governing authority: Code of Ordinances Sec. 13.04.150. Source: Construction Fee Schedule Rev. 11.5.2025, no longer posted by the City (checked 2026-11-04); amounts withheld until a current official schedule is found.

Water Meter Connection Rates

Meter Size Inside City Outside City
3/4 inch Pending re-verification Pending re-verification
1 inch Pending re-verification Pending re-verification
1½ inch Pending re-verification Pending re-verification
2 inch Pending re-verification Pending re-verification
3 inch Pending re-verification Pending re-verification
4 inch Pending re-verification Pending re-verification
6 inch Pending re-verification Pending re-verification
8 inch Pending re-verification Pending re-verification
10 inch Pending re-verification Pending re-verification
12 inch Pending re-verification Pending re-verification

Note: A trip fee may be added for any location where a meter is requested but is deemed incomplete, damaged, or not ready for installation upon city inspection.

Water Engineering and Inspection Fees

Use Type Inside City Outside City
Single-family residential (up to 4 units) Pending re-verification Pending re-verification
Multi-family residential (4 or more units) Pending re-verification Pending re-verification
RV spaces Pending re-verification Pending re-verification
Non-residential Pending re-verification Pending re-verification

Wastewater Connection Fees

Effective November 5, 2025. Governing authority: Code of Ordinances Sec. 13.04.160. Source: Construction Fee Schedule Rev. 11.5.2025, no longer posted by the City (checked 2026-11-04); amounts withheld until a current official schedule is found.

Wastewater Connection Rates

Pipe Size Inside City Outside City
4 inch Pending re-verification Pending re-verification
6 inch Pending re-verification Pending re-verification
8 inch Pending re-verification Pending re-verification
Greater than 8 inch Pending re-verification Pending re-verification

Note: The Liberty Hill with Western District area (formerly Chisholm Trail) has a separate outside-city wastewater connection rate (amount pending re-verification). Meter plus actual cost of materials and labor applies for connections greater than 8 inch.

Wastewater Engineering and Inspection Fees

Use Type Fee
Single-family residential (up to 4 units) Pending re-verification
Multi-family residential (4 or more units) Pending re-verification
RV spaces Pending re-verification
Liberty Hill with Western District Water Pending re-verification
Non-residential Pending re-verification

Outside-City Utility Connection Application Fee

A separate application fee applies to all new utility connections outside the city limits, including ETJ (Extra Territorial Jurisdiction) and Western District areas. Source: Construction Fee Schedule Rev. 11.5.2025, no longer posted by the City (checked 2026-11-04); amounts withheld until a current official schedule is found.

Fee Item Amount
Utility Connect Application Fee Pending re-verification
Technology Fee Pending re-verification

This application fee is in addition to the tap and connection fees listed above. It applies specifically to connections outside the city limits.

Electric Meter Connection Fees

Governing authority: Code of Ordinances Sec. 13.04.210. Source: Georgetown Electric Engineering - Electric Related Permitting Fees and Construction Fee Schedule Rev. 11.5.2025.

The Electric Meter Connect Fee covers the cost of providing the meter, installing the meter, the initial inspection, and related metering and engineering system updates. The fee applies to all new services, service relocations, rebuilds, upgrades, additions of Distributed Energy Resources (DER), and conversions from overhead to underground.

Service Type Fee Notes
Single-phase, 0-400 amps $200 Non-refundable. Assessed and paid prior to building permit issuance; processed through Permitting and Inspections.
Single-phase, greater than 400 amps Actual cost Line extension application required through Electric Engineering Department.
Commercial three-phase (all sizes) Actual cost Line extension application required. Contact electricengineering@georgetown.org or complete a line extension application.
Temporary meter $215 Non-refundable. Charged as part of the permit package. Covers cost of removing and installing a meter from a temporary pole to the building.
Trip fee (as needed) $120 per site visit Charged when work is to be performed by the electric utility but the job site is not ready.

For multifamily and commercial three-phase developments: meter connect fees are billed and collected along with line extension fees. Contact Georgetown Utility Systems Electric Engineering for commercial service connection requirements.

Administering Authority

Georgetown Utility Systems (City of Georgetown)

Type: City-operated combined utility - electric, water, and wastewater service

Georgetown Utility Systems is fully integrated into city government and is not an independent authority. Water, wastewater, and electric tap and connection fees are governed by Code of Ordinances Chapter 13.04 (Sec. 13.04.150, 13.04.160, and 13.04.210).

Official reference: Georgetown Utility Systems - georgetowntexas.gov/utilities/

Sources

Source 1 - Water and Wastewater Tap and Connection Fees:
City of Georgetown - Construction Fee Schedule Rev. 11.5.2025
Agency: City of Georgetown, Development Services - Permitting
Effective date: November 5, 2025 - Accessed: 2026-03-26

Source 2 - Electric Meter Connection Fees:
City of Georgetown - Electric Related Permitting Fees
Agency: City of Georgetown, Electric Engineering
No separate effective date stated in document; electric fees also appear in Construction Fee Schedule Rev. 11.5.2025 - Accessed: 2026-03-26

Last verified by ZoneFee: 2026-03-26

← Georgetown, TX development fees

This page reflects fee data sourced from official City of Georgetown documents as of the last-verified date above. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules are subject to change. Always verify binding fee amounts directly with the City of Georgetown or Georgetown Utility Systems before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due diligence reference only - it is not legal or financial advice.