Phoenix, Arizona - City Development Fees
Phoenix | City | Maricopa County | Phoenix-Mesa-Chandler, AZ MSA (state capital and county seat)
Phoenix is the largest city in Arizona and the core of the Greater Phoenix metropolitan area, with roughly 1.6 million residents. The City administers development impact fees under Arizona Revised Statutes Section 9-463.05 and Phoenix City Code Chapters 29 and 30, Water Resource Acquisition Fees through its municipal Water Services Department, and a consolidated Planning and Development Department (PDD) Fee Schedule covering site planning, site plan review, subdivision, and property division fees. The defining Phoenix characteristic for underwriting purposes is geographic: unlike its Valley peers, Phoenix does not publish a single flat citywide impact fee schedule. Fees are divided into designated geographic fee areas so that fees collected in a fee area fund only infrastructure benefiting that area, and the Balance of City assesses $0 across all fee categories. Arizona jurisdictions do not use Virginia-style cash proffers. Verify current amounts with the City of Phoenix before relying on them for any financial decision.
Coverage status: this Phoenix record is published under ZoneFee's Partial-Verified Publication Standard. Three fee families are closed against dated, hashed official City documents; two families are closed as not applicable or not administered by the City and are disclosed in the Coverage Notes below. The full 15-column service-area matrix, the Site Plan Review Table C-1 land use base fees, and the Table C-2 complexity surcharge amounts remain authoritative in the source PDFs and are not reproduced in full here. Treat this page as a research starting point, not a substitute for a fee estimate from the City.
Recent Fee Changes
Development impact fees and Water Resource Acquisition Fees effective June 23, 2025; PDD Fee Schedule effective January 20, 2026. The 2025 Development Impact Fee Update was adopted by City Council on April 9, 2025 and applies to permits purchased on or after June 23, 2025. The consolidated PDD Fee Schedule was approved December 17, 2025 under Ordinance G-7465 and took effect January 20, 2026, codified at Phoenix City Code Chapter 9, Appendix A.2. Each family carries its own effective date; check both when pricing a project that straddles the dates.
On this page
Fee Summary
| Fee Type | Status | Top-Line Figure | Effective Date |
|---|---|---|---|
| Development Impact Fees by Service Area (ARS 9-463.05) | Confirmed | Fire single family $1,165 to $1,833 per dwelling by fee area; Police single family $348 per dwelling in all fee areas except Balance of City; Wastewater Collection single family up to 1.0 inch $5,127 (Northwest); Balance of City $0 across all categories | 2025-06-23 |
| Water Resource Acquisition Fees (by meter size) | Confirmed | Single family unit up to 1.0 inch $2,009; multifamily $723 per dwelling; non-residential and irrigation meters $2,470 (3/4 inch) to $425,908 (10 inch and 12 inch) | 2025-06-23 |
| Site Planning, Subdivision, and Property Division Fees (PDD Fee Schedule) | Confirmed | Preliminary Plat $2,500 base + $40/lot + Review Complexity Surcharge; Development Proposal Pre-Application Initial Meeting $1,560; Master Plan Initial Review $390 per plan; Lot Division $780 / $1,560 | 2026-01-20 |
| Special District Fees (Community Facilities Districts) | Not administered | Phoenix Community Facilities Districts are Title 48 special taxing districts that levy taxes and issue bonds independently of the City; no City-levied developer application fee appears in the 56-page PDD Fee Schedule | - |
| Proffers | Not applicable | Arizona jurisdictions do not use Virginia-style cash proffers; developer capital contributions are captured through ARS 9-463.05 impact fees and Water Resource Acquisition Fees | - |
Development Impact Fees by Service Area - Effective June 23, 2025
Source: City of Phoenix 2025 Development Impact Fee Update, "Development Impact and Water Resource Acquisition Fee Schedules - Net Assessments by Fee Category, Land Use, and Service Area (Effective 6-23-2025)", 3 pages (SHA-256 c7eadb73...). Adopted by City Council April 9, 2025 and applied to permits purchased on or after June 23, 2025. Fees are assessed under ARS 9-463.05 and Phoenix City Code Chapters 29 and 30.
How the Phoenix Fee-Area Structure Works
Phoenix assesses development impact fees across 15 service-area columns rather than one citywide rate. The fee areas are Northwest, Deer Valley, Northeast, and Paradise Ridge (Off-Project), plus Estrella North, Estrella South, Laveen East, Laveen West, Ahwatukee, and Balance of City, each with On-Project and Off-Project columns. Fees collected in a fee area fund only infrastructure benefiting that area, and amounts vary by land use and by development size or meter size. The Balance of City assesses $0 across all fee categories because it is not a development impact fee area. The full 15-column matrix does not fit a readable single table; the representative cross-section below is grouped by fee category, and the complete matrix is authoritative in the cited City schedule.
Fire Impact Fee
| Land Use | Fee Area | Amount |
|---|---|---|
| Single Family Dwelling | Northwest, Deer Valley | $1,282 per dwelling |
| Single Family Dwelling | Northeast, Paradise Ridge | $1,165 per dwelling |
| Single Family Dwelling | Estrella and Laveen areas | $1,625 per dwelling |
| Single Family Dwelling | Ahwatukee | $1,833 per dwelling |
| Multifamily Dwelling | Northwest, Deer Valley | $872 per dwelling |
| Retail | Northwest, Deer Valley | $628 per 1,000 sq ft |
| Office | Northwest, Deer Valley | $782 per 1,000 sq ft |
| Industrial | Northwest, Deer Valley | $256 per 1,000 sq ft |
| Public | Northwest, Deer Valley | $308 per 1,000 sq ft |
| Other | Northwest, Deer Valley | $526 per 1,000 sq ft |
Police Impact Fee
Police impact fees are uniform across all fee areas except Balance of City, which assesses $0.
| Land Use | Amount |
|---|---|
| Single Family Dwelling | $348 per dwelling |
| Multifamily Dwelling | $237 per dwelling |
| Retail | $171 per 1,000 sq ft |
| Office | $212 per 1,000 sq ft |
| Industrial | $70 per 1,000 sq ft |
Wastewater Collection Capacity Charge (Northwest fee area)
| Land Use or Meter Size | Amount |
|---|---|
| Single Family Unit up to 1.0 inch | $5,127 per dwelling |
| Single Family Unit 1.5 inch | $11,177 per dwelling |
| Multifamily Dwelling | $3,435 per dwelling |
| Non-Residential 3/4 inch meter | $6,691 |
| Non-Residential 1 inch meter | $11,536 |
| Non-Residential 1.5 inch meter | $25,148 |
| Non-Residential 2 inch meter | $33,569 |
| Non-Residential 3 inch meter | $104,860 |
| Non-Residential 4 inch meter | $184,572 |
| Non-Residential 6 inch meter | $293,585 |
| Non-Residential 8 inch meter | $587,285 |
| Non-Residential 10 inch and 12 inch meter | $1,153,575 |
Wastewater Collection amounts vary by fee area. For comparison, the Estrella South Off-Project single family unit up to 1.0 inch charge is $5,409 against the Northwest figure of $5,127 shown above.
Additional Fee Categories in the Same Schedule
The 2025 Development Impact Fee Update schedule also assesses Major Arterials and Storm Drainage (charged per acre), Wastewater Treatment, Water Transmission, and Water Treatment. Per-area amounts for these categories are in the cited City schedule and are not reproduced here. Impact fee authority: City of Phoenix Planning and Development Department (impactfees@phoenix.gov).
Site Planning and Subdivision Fees - Effective January 20, 2026
Source: City of Phoenix PDD Fee Schedule, approved December 17, 2025 per Ordinance G-7465, effective January 20, 2026, codified at Phoenix City Code Chapter 9, Appendix A.2, 56 pages (SHA-256 4193e742...). The schedule covers Site Planning, Site Plan Review, Environmental Plan Review and Permits, Subdivision and Property Division, Sign Fees, Civil Engineering (plan review, permits, inspection, right-of-way), and Building Safety fees. Representative developer-facing amounts are shown below.
Site Plan Conceptual and Base Review
| Fee Item | Amount |
|---|---|
| Development Proposal Pre-Application Initial Meeting | $1,560 |
| Follow-up Pre-Application Meeting | $780 |
| Minor Site Plan Review | 30% of the Site Plan Review Fee (Table C-1) |
| Preliminary Site Plan (multi-disciplinary) | Table C-1 base plus Table C-2 complexity surcharge |
Site Plan Review base fees are set by land use in Table C-1 of the PDD Fee Schedule, with a complexity surcharge applied per Table C-2. Those two tables are not reproduced here; consult the schedule directly for the applicable land-use base and surcharge.
Master Plan Review
| Fee Item | Amount |
|---|---|
| Initial Review of Master Plans | $390 per plan, plus $195 per hour beyond the second correction |
Subdivision and Property Division
| Fee Item | Amount |
|---|---|
| Preliminary Plat | $2,500 base + $40 per lot + Review Complexity Surcharge |
| Revised Preliminary Plat or Update to Expired Plan | $1,250 base + $20 per lot |
| Final Plat | Billed under the Civil Engineering fee section of the same schedule |
| Parcel Combination (Single-Family Residential / Multi-Family and Non-Residential) | $390 / $1,365 |
| Lot Division (Single-Family Residential / Hillside, Multi-Family, Non-Residential) | $780 / $1,560 |
Sign, Civil Engineering, and Building Safety Fees
Sign fees, Civil Engineering fees (plan review, permits, right-of-way, inspection), and Building Safety fees are assessed per their own sections of the PDD Fee Schedule on a base-plus-quantity or valuation basis. They are not enumerated here and remain authoritative in the source schedule. Zoning and site planning fee authority: City of Phoenix Planning and Development Department.
Water Resource Acquisition Fees - Effective June 23, 2025
Source: City of Phoenix 2025 Development Impact Fee Update, Water Resource Acquisition schedule (SHA-256 c7eadb73...), effective June 23, 2025. Phoenix Water Services operates the municipal water and wastewater utility. The developer-side water capacity charge is the Water Resource Acquisition Fee, charged by meter size and applied uniformly across all Off-Project fee areas including Balance of City. On-Project columns assess $0.
| Land Use or Meter Size | Amount |
|---|---|
| Single Family Unit up to 1.0 inch | $2,009 per dwelling |
| Single Family Unit 1.5 inch | $4,380 per dwelling |
| Multifamily Dwelling | $723 per dwelling |
| 3/4 inch meter (Non-Residential / Irrigation) | $2,470 |
| 1 inch meter (Non-Residential / Irrigation) | $4,259 |
| 1 1/2 inch meter (Non-Residential / Irrigation) | $9,285 |
| 2 inch meter (Non-Residential / Irrigation) | $12,394 |
| 3 inch meter (Non-Residential / Irrigation) | $38,715 |
| 4 inch meter (Non-Residential / Irrigation) | $68,145 |
| 6 inch meter (Non-Residential / Irrigation) | $108,394 |
| 8 inch meter (Non-Residential / Irrigation) | $216,830 |
| 10 inch and 12 inch meter (Non-Residential / Irrigation) | $425,908 |
Water Transmission, Water Treatment, Wastewater Collection, and Wastewater Treatment capacity charges are assessed in the same City schedule and are presented under the development impact fee section above. Utility fee authority: City of Phoenix Water Services Department.
Coverage Notes - What This Page Does Not Cover
Per ZoneFee's Partial-Verified Publication Standard, the items below were not closed via confirmed standalone fee amounts on this page. They are disclosed here rather than estimated or omitted silently.
Special District Fees (Community Facilities Districts)
Phoenix Community Facilities Districts are Title 48 districts formed under the Arizona Community Facilities District Act of 1988. Per the City's own CFD program page, the Districts levy taxes and issue bonds independently of the City as separate political subdivisions under the Arizona Constitution, and CFD assessments appear under the Special District section of the Maricopa County property tax statement. The City levies no developer-facing CFD or Improvement District application fee: the 56-page PDD Fee Schedule contains no such line item, and the CFD program page publishes only formation documents (petitions, resolutions, ordinances, development agreements, annual financial reports) with no fee schedule. Closed-search outcome: this fee family is not administered by this jurisdiction. Re-open if Phoenix adopts a City-levied CFD application fee.
Proffers
Arizona jurisdictions do not use Virginia-style cash proffers (a Virginia conditional-zoning mechanism under VA Code 15.2-2303 and 15.2-2303.4 with no Arizona counterpart). Developer-side capital contributions in Phoenix are captured through the ARS 9-463.05 development impact fee program and the Water Resource Acquisition Fees documented above. Closed-search outcome: this fee family does not apply to this jurisdiction.
Water Services Per-Connection Service Charges
The Water Services Development Finance Fees page enumerates per-connection service charges as fee TYPES without publishing amounts on that surface: Full Water Service Fee (Tap and Meter), Water Tap Only, Meter Only, Meter Relocation, Reduce Size of Meter, Fire Hydrant Meter, Firelines and Wet Tap, Construction Water Access, Shutdown, and Development Occupational Fees. These are billed at the service counter and sit outside the published capacity-fee schedule. No amounts are stated here because none are published on the City surface reviewed. Request a quote from Phoenix Water Services for these charges.
Site Plan Review Tables C-1 and C-2
Site Plan Review base fees (Table C-1, by land use) and the complexity surcharge (Table C-2) are not transcribed on this page. The base-plus-surcharge structure is stated above as published; the numeric tables remain authoritative in the PDD Fee Schedule.
Full 15-Column Service-Area Matrix
The impact fee tables above are a representative cross-section of the City's 15-column service-area matrix, grouped by fee category. Amounts for a specific parcel depend on its fee area and On-Project or Off-Project designation. Confirm the applicable fee area with the City before budgeting.
Fee Authorities
| Authority | Fee Types | Official Website |
|---|---|---|
| City of Phoenix - Planning and Development Department (PDD Fee Schedule) | Site planning fees; site plan review fees; subdivision and plat fees; property division fees; sign fees; civil engineering fees; building permit fees; environmental plan review fees | phoenix.gov/pdd/devfees |
| City of Phoenix - Development Impact Fees (ARS 9-463.05, Phoenix City Code Ch 29/30) | Development impact fees by geographic fee area (Fire, Police, Major Arterials and Storm Drainage, Wastewater Collection and Treatment, Water Transmission and Treatment) | phoenix.gov/administration/departments/pdd/growth-infrastructure/impact-fees.html |
| City of Phoenix - Water Services Department | Water Resource Acquisition Fees; per-connection water and wastewater service charges | phoenix.gov/administration/departments/waterservices/development-infrastructure/development/finance-fees.html |
Compare with other Greater Phoenix jurisdictions covered by ZoneFee: Mesa, Scottsdale, Chandler, Peoria, Gilbert, Queen Creek, Buckeye, Goodyear, and Surprise. See the full Arizona fee coverage hub and ZoneFee's coverage index and methodology.
Sources
| Document | Agency | Accessed |
|---|---|---|
| City of Phoenix 2025 Development Impact Fee Update - Development Impact and Water Resource Acquisition Fee Schedules, Net Assessments by Fee Category, Land Use, and Service Area (Effective 6-23-2025), 3 pp (SHA-256 c7eadb73...) | City of Phoenix, AZ - Planning and Development Department / Water Services Department | 2026-07-21 |
| City of Phoenix PDD Fee Schedule - approved 12/17/2025 per Ordinance G-7465, effective January 20, 2026, Phoenix City Code Ch 9 Appendix A.2, 56 pp (SHA-256 4193e742...) | City of Phoenix, AZ - Planning and Development Department | 2026-07-16 |
| City of Phoenix Impact Fees program page (framework and fee-area corroboration) | City of Phoenix, AZ - Planning and Development | 2026-07-16 |
Note: phoenix.gov landing pages render their document links client-side, so a plain HTTP fetch of the Impact Fees or Development Finance Fees page returns HTTP 200 with no fee surface and no asset links. The canonical fee-schedule PDF URLs were harvested from a rendered browser session, then downloaded directly (HTTP 200, no WAF on the content/dam paths) and extracted and hashed from the PDF byte stream.
Last verified by ZoneFee: 2026-07-16. Fee schedules are subject to change. Verify current rates directly with the City of Phoenix Planning and Development Department and Water Services Department before relying on this data for any financial decision.
This page reflects fee data sourced from official City of Phoenix, Arizona documents: the 2025 Development Impact Fee Update fee schedules (effective June 23, 2025) and the PDD Fee Schedule (Ordinance G-7465, effective January 20, 2026). ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. The categories displayed above include principal developer-side line items and a representative cross-section of the City's 15-column service-area matrix; the source schedules contain additional line items, the Site Plan Review Table C-1 and Table C-2 amounts, sign fees, civil engineering fees, and Building Safety valuation tables that are not enumerated here and remain authoritative in the source. Development impact fees are levied under Arizona Revised Statutes Section 9-463.05 and Phoenix City Code Chapters 29 and 30. Arizona jurisdictions do not use Virginia-style cash proffers, and the City levies no developer-facing Community Facilities District application fee on the schedules reviewed. Verify all current rates directly with the City of Phoenix before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.